验算
- 与 验算 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Including the transmission system design, selection of ball screw assembly, servo motor, precision and stiffness checking, etc.
包括传动系统总设计,滚珠丝杠副的选择,伺服电动机的选择,精度和刚度验算等。
-
First according to the hydraulic pressure elevator system diagram, use the machine design and hydraulic transmission knowledge calculates the diameter of the plunger, cylinder tube wall thickness as well as cylinder bottom thickness; second, through the examination confirmation to the obtained result to complete the work of cylinder design; Simultaneously has carried on the component choice and the computation; Through to the system calorific capacity computation the and the volume of cooling water while the fuel tank cools when needs to complete the hydraulic pressure elevator fuel tank design; Based on the system oil stream condition to calculated the tube internal pressure lose, the local pressure loss as well as the all of the pressure lose to carried on the system checking calculation; Finally through the consult correlation design handbook to calculation and examines the belt, the band pulley, the axis, as well as the key, has completed the hydraulic pressure elevator pumping station transmission system design.
首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。
-
Firstaccording to the hydraulic pressure elevator system diagram, usethe machine design and hydraulic transmission knowledge calculatesthe diameter of the plunger, cylinder tube wall thickness as wellas cylinder bottom thickness; second, through the examinationconfirmation to the obtained result to complete the work ofcylinder design; Simultaneously has carried on the component choiceand the computation; Through to the system calorific capacitycomputation the and the volume of cooling water while the fuel tankcools when needs to complete the hydraulic pressure elevator fueltank design; Based on the system oil stream condition to calculatedthe tube internal pressure lose, the local pressure loss as well asthe all ofthe pressure lose to carried on the system checking calculation;Finally through the consult correlation design handbook tocalculation and examines the belt, the band pulley, the axis, aswell as the key, has completed the hydraulic pressure elevatorpumping station transmission system design.
首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。
-
Because of the time constraint, the teacher asked us to check only a plate and a beam, the main method is to grasp.
由于时间关系,老师要求我们只验算一块板和一个梁,主要是掌握方法。
-
The practice of deep well diameter extension and washing, blasting is introduced in this paper.
介绍深水井中的扩径与洗井爆破工艺,并就如何保证爆效、加工和密封装药容器及容器在高水压下是否发生屈曲失稳的验算等进行了叙述。
-
To increase the construction process of rigid bridge hollow thin wall high pier ,it puts forward the large mode design method in the construction of hollow thin wall high pier ,and mainly discusses the process of mode design and the checking calculation combined with the practice,and this solves the problems of accelerating the construction of pier.
为了提高刚构桥空心薄壁高墩墩身施工进度,提出了在空心薄壁高墩施工中的大模板设计方法,并结合实例对模板设计的过程和验算进行了主要论述,有效解决了加快墩身施工进度问题。
-
In the paper, a tenon-base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction-angle and the passive press of the clay, etc.
本文在对仰斜式挡土墙设计中有关计算参数的选择、公式的选用应该注意的问题进行了研究,对河道护岸软基础上的仰斜式挡土墙采用凸榫基础处理的方法,就其计算理论、设计验算中各荷载的具体处理方法进行了较为细致的研究,提出了解决软基础上的水工仰斜式挡土墙难以解决的难题的方法,并对有水情况下粘土等效内摩擦角Ψ_D、凸榫被动土压力E_p等在计算中的取值提出了定性和定量的分析。
-
The column design of wall bone and the stress checking calculation were carried on the most disadvantageous position of the first floor. The stress was 6.1 N/mm2<=10N/mm2,Choosing Korean pine timber of 10×10cm as the wall bone column was appropriate.
对在底层最不利位置进行墙骨柱设计与强度验算,压应力为6.1 N/mm2<=10N/mm2,所选10×10cm截面的红松方木做墙骨柱是合适的。
-
The methods of plane arrangement and checking of bowl-button steel scaffold were demonstrated in detail based on the engineering construction of cast-in-place Continuous beam in Houyan Cross-bridge of Shenda Highway. In addition, the methods of communicating the length of U-tray and adjusting the gradient have been given. It is pointed out that original pod can adjust the greater longitudinal or tranverse grade in the box-girder construction and welding-steel-bar can reduce partial compression.
通过后盐立交桥连续箱梁施工这一工程实例,详细论述了碗扣式钢管脚支架的平面布置方法及受力验算方法,提出了碗扣式钢管脚支架的U托旋出长度的计算方法及纵横坡的调整方法,并指出采用找零立杆的方法可以解决较大纵横坡度箱梁的施工问题;采用贴焊钢筋的方法可以解决U托偏心受压的间题。
-
Introduces the technical process of hydraulic support cylinder bore enlarge,and give checking strength for it.
介绍了液压缸体的失效状况,通过对比采用扩镗方法修复缸体,并介绍了液压缸体扩镗的工艺过程,对其进行强度验算。
- 推荐网络例句
-
In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.
。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。
-
Go down on one's knees;kneel down
屈膝跪下。。。下跪祈祷
-
Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.
Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。