英语人>网络例句>验收试验 相关的搜索结果
网络例句

验收试验

与 验收试验 相关的网络例句 [注:此内容来源于网络,仅供参考]

Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection.

制定采购部件的检验试验计划,包括过程检验和最后验收程序的计划。

This Standard provides for technical requirements, testing and acceptance of evaporative cooling hydrogenerator generator / motor.

本标准规定了蒸发冷却水轮发电机的技术要求、试验验收及试运行等基本内容。

The fourth chapter introduces the validation test of POTOK. In the chapter, application effectivity of the Russian dry calibration method for electromagnetic fiowmeter is evaluated through experimentation.

论文第四章进行POTOK装置验收试验,对俄罗斯电磁流量计干标定技术在我国电磁流量计产品中的应用效果进行检验,并在试验结束后给出了相应的试验结果。

Automatic sprinkler system of water by pipeline leakage country "heating and sanitary engineering construction and acceptance norms" section 3.15 states: water pressure test, 10min with the pressure drop of not more than 0.05Mpa.

自动喷水系统管道的泄漏水量按国家《采暖与卫生工程施工及验收规范》第3.15条规定:水压试验时,10min内压力降不大于0.05Mpa。

And four processing methods for condition curves in calculation of specific enthalpy for exhaustc steam from LP cylinder at home and abroad being presented,and the advantages and disadvantages of each method being analysed.

根据ASME PTC6汽轮机性能验收试验规范确定低压缸排汽比焓的计算原则,介绍了目前国内外对计算低压缸排汽比焓及热力过程线的4种处理方法,并对各种方法的优缺点进行了具体的分析。

1 Upon receipt of materials or items, Warehouse Keeper shall place them in the uninspected area of Warehouse as applicable, the Material Engineer shall check all the receiving documents such as Material Quality Certification, test reports and assure that all the documents described in the Purchase Order have been received then provide them to the QC Department for receiving Inspection.

3.1 材料到厂后,仓库管理员负责将其放到仓储中心的待检区内,材料工程师核对供应厂家的材料质量证明书,试验报告等文件,并保证材料采购单中所提到的文件齐全无误,提交给检验部进行验收检查。

Based on ASME PTC6 Turbine Performance Acceptance Test Code,the principle of calculating the specific enthalpy of exhaust steam from low-pressure cylinder has been determined.

根据ASME PTC6汽轮机性能验收试验规范确定低压缸排汽比焓的计算原则,介绍了目前国内外对计算低压缸排汽比焓及热力过程线的4种处理方法,并对各种方法的优缺点进行了具体的分析。

Technical meeting on lessons learned with respect to SAT implementation, including development of triners and use of cost effective trining methods.

H-053-004 关于模拟器验收试验执行的学习课程技术会议,包括的培训器的发展,有效培训方法的应用

Electrician Cheng checks and accept a standard: Switch of leakage of electricity is installed it is correct, normal to use; The installation of electric parts of an apparatus, equipment is secured should firm, level off; Experiment of electric equipment electrify, lamps and lanterns tries bright reach lamps and lanterns to control function good; The exterior of parts of an apparatus such as box of switch, electrical outlet, terminal is in good condition, insulation parts of an apparatus is flawless, installation is firm, smooth, installation means accords with a regulation; The switch of paratactic installation, electrical outlet the deviation of terminal box, the clearance of periphery of the face plate of box of dark outfit switch, electrical outlet, terminal, box accords with a regulation; Authority of function of weak cable system is complete, satisfy use requirement, implemental installation is firm, smooth.

电气工程验收标准:漏电开关安装正确、使用正常;电气器件、设备的安装固定应牢固、平整;电器通电试验、灯具试亮及灯具控制性能良好;开关、插座、终端盒等器件外观完好,绝缘器件无裂纹,安装牢固、平正,安装方式符合规定;并列安装的开关、插座终端盒的偏差,暗装开关、插座、终端盒的面板、盒周边的间隙符合规定;弱电系统功能权齐全,满足使用要求,器具安装牢固、平正。

推荐网络例句

Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.

在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。

In fact,I've got him on the satellite mobile right now.

实际上 我们已接通卫星可视电话了

The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.

世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。