额定的
- 与 额定的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Simulation in the discussion, respectively, from the rated load, and the empty set three conditions for the system simulation, obtained under the three conditions in response to step through the analysis of the curve, the load that the impact of changes in the system And to improve the system.
在仿真讨论中,分别取额定负载、空载和过载三种情况对系统进行仿真,得出其在三种情况下的阶跃响应,通过对曲线的分析,得出负载的变化对系统的影响,并以此对系统进行了改进。
-
At the end, the boiler thermodynamic calculation of SG-1000 boiler with 5% flue gas recirculation and HG-200/100-10 boiler are carried out by this software and get their thermodynamic calculation result with rated load.
文中最后用采用5%烟气再循环的SG-1000型锅炉和HG-220/100-10型锅炉完成了对软件的测试,得出了各自额定负荷下的热力计算结果。
-
For optimal flow valve, non-preferred direction of lower pressure seal test shall be rated in this direction.
对于有优选流向的阀门,非优选方向的密封试验应按降低的压差额定值在此方向进行。
-
Installation and maintenance of flues and ventilation for gas appliances of rated input not exceeding 70 kW net (1st, 2nd and 3rd family gases).
额定热载不超过70kW的燃气灶的烟道及通风装置(1类、2类和3类家用燃气)的安装和维护。
-
It has been obtained by analysis that for ultra-high power electric arc furnace using scrap charging the relation formula between rating capacity of transformer Pn and parameters- electric power consumption W, transformer power utilization ratio C 2, total power o...
经分析得出以废钢为原料的超高功率电弧炉变压器额定容量Pn kVA与吨钢电耗W、变压器功率利用率C2 、总通电时间ton、出钢量G之间的关系式为:Pn =(W·G·6 0 )(ton·cosφ·C2 ),同时给出了二次电压的确定方法。
-
So in the same rated capacity, the power consumption of the vertical screw shipunloader is 20%~ 28% of the pneumatic negative pressure suction machine. Energy-saving is more than 3 times.
即在额定卸船能力相同的前提下,垂直螺旋卸船机的实际卸船能力是气力式负压抽吸机耗电的20%~28%,节能达3倍以上,节能效果显著。
-
In the same rated capacity, the actual capacity of the vertical screw shipunloader is 1.4 ~ 1.65 times of the pneumatic negative pressure suction machine.
即在额定卸船能力相同的前提下,垂直螺旋卸船机的实际卸船能力是气力式负压抽吸机实际卸船能力的1.4~1.65倍。
-
The boiler thermal efficiency was calculated according to the ASME FIRED STEAM GENERATORS PERFORMANCE TEST CODE . The varieties of temperature, flow rates of steam and feed water, gas pollutant emission and carbon content in the bottom ash and fly ash were measured, and some disciplinary results were obtained.
在额定蒸发量为410t/h的超高压循环流化床锅炉上进行以无烟煤、石油焦混合物为燃料的锅炉热力性能试验,根据ASME锅炉性能规程计算了锅炉热效率,并对温度、汽水流量、气态污染物排放、灰渣含碳量等多个参数进行了测试,整理得到了一些规律性的结果。
-
Exhibiting excellent chemical V-sharped regulation ball valve- and corrosion-resistant capabilities the new valve is pressure-rated up to 225 psi at 68F and has a 10000 cycle life.
参展良好的化学和耐腐蚀能力,新的阀门压力,额定为68至225防扩散女,并有1.0万的循环寿命。
-
Nameplate rating is only a guide to transformer application, and should only be used as a first step in the selection process.
铭牌额定值仅是变压器应用的一个指导,只是选择过程的第一步。这无疑是摆脱混乱与愚昧的第一步。
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。