英语人>网络例句>预热 相关的搜索结果
网络例句

预热

与 预热 相关的网络例句 [注:此内容来源于网络,仅供参考]

Mix in a little honey. Spread on a baking sheet and place in a 350?

平摊在烤盘上幼儿营养食谱,烤箱预热至350?

Spread on a baking sheet and place in a 350 oven and bake for approximately 15 minutes. Stir a couple of times during the baking time.

平摊在烤盘上,烤箱预热至350,大约烤15分钟,在此期间须打开烤箱搅动数次。

The main contents of the present paper include: 1、The mechanism of fouling accumulation and the effects of fouling and slagging on boiler performance are analyzed. The model of fouling increasing is developed on the basis of sediment rate and denudation rate. The fouling monitoring models for boiler furnace and convective sections based on heat balance, the ones for air heater based on converted pressure difference are given. The implement results show that these models can reveal the cleanliness of boiler heat transfer surface. 2、The disadvantages of the model for boiler furnace fouling and slagging monitoring based on heat balance are discussed, and the calculation of radiant heat flux is considered as the primary difficulty.

主要包括以下内容: 1、分析了锅炉受热面污染形成的机理,从灰污的沉积率和剥蚀率角度出发,推导了受热面灰污增长的基本模型,分析了灰污热阻随积灰时间和烟气流速变化的规律,并通过大量现场试验,得到了沉积常数与时间常数的取值范围; 2、针对炉膛、对流受热面和空气预热器等不同受热面的传热特性,分别建立了基于热平衡和折算压差的污染在线监测模型,经实践验证,其监测结果能够满足现场工程应用的精度要求; 3、分析了基于热平衡原理的辐射、半辐射污染监测模型的不足之处,指出了机理模型因对炉内辐射换热量计算不准确,导致对以辐射换热为主的炉膛和以半辐射半对流的屏式过热器监测效果不够理想。

Power on BGA system, Control unit, monitor and PC. Set the Pre-heater mode selector switch to

3.4.1。打开 BGA 系统,控制单元,显示器,及 PC 的电源开关,将 BGA-3500 系统的预热模式设置到加

Preheating system of the die set of swaying tray is heated by adopting Cr20Ni80 resistance wire, as diameter d is 1.5mm, node-pitch D is 36mm, screw-pitch h is 4mm, spiral column L' is 0.91m, 220V single-phase contacting is adopted.

摇盘模具预热系统采用Cr20Ni80 镍铬合金材料电阻丝加热,直径d 为1.5mm,节经D 选用36mm,螺距h 选用4mm,螺旋柱长度L'为0.91m,采用220V 单相接法。

For the proposed project the waste gas emission locations include: preheating furnace of hard alloy parts line (when natural gas is used for heating while excess heat heating system goes wrong), melting furnace, refining furnace, heat treatment furnace for machining unit and steam boiler. The pollutants are SO2, NOx and smoke dust contained in the smoke generated from the above locations. All the above pollution generating facilities use the most clean energy, natural gas, for burning. Meanwhile, on melting furnace and refining furnace low nitrogen combustion technology such as low NOx burner is applied, and the generated smoke is discharged via chimney.

拟建项目之废气排放部位为硬质合金件生产线的预热炉(余热加热系统故障采用燃天然气加热时)、熔化炉和精炼炉及机加工机组热处理炉和蒸汽锅炉,污染物为以上部位产生的烟气中含有SO2、NOx以及烟尘,以上各产污设备均采用最清洁的能源——天然气为燃料,同时熔化炉和精炼炉采用低NOx烧嘴等低氮燃烧技术,产生的烟气由烟囱排放。

When making a white sauce, the process is so much quicker when you preheat the milk.

白酱油时,这个过程是如此快时预热牛奶。

When it is over temperature, the bypass flue's gate valve open a few, and air preheating chamber gate valve shut down a few.

主烟道和加热腔烟道上的闸板阀受预热箱内温度控制,超温时,主烟道闸板打开一定开度,加热腔闸板适当关闭,实现温度调节。

A transistorize radio takes no time to warm up.

晶体管收音机不需要预热时间。

Fill the piping with stuff, line to define the length and position for heating tube, daub tube, warm-up, make the role touch the piping by pressing the push-bike, heat up the piping to the necessary temperature, cut off power supply, one-off complete the process in the bending model.

在管坯内装填填充物、划线确定管坯加热的长度和位置、涂抹润滑剂、管坯装卡、预热、通过脚踏机构加压使电极与管坯紧密接触、采用二次加热工艺将管坯加热至所需温度、切断电源,在弯曲成形模具上一次性完成管坯的弯曲成形加工。

第42/43页 首页 < ... 35 36 37 38 39 40 41 42 43 > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力