顺序地
- 与 顺序地 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
By contrast, article puts forward concept, type, principle and method of control cincture ,and carries on a controlling planning to aim at dispersion and concentration This will play a positive role in pushing sustainable development of small towns in forest zone in frigid area.
借鉴古代城墙在控制用地集约的优势,采用统计与比较的分析方法,通过对比,提出城镇建设顺序控制带概念、方法、类型、原则与内容,并针对我国寒地林区分散与集中的城镇形态进行控制带规划,这对寒地小城镇可持续发展将起到推动作用。
-
Results The clouds can be effectively removed by applying the Convolution Operation、Fourier Transform, Fourer Transform Editor、Inverse Fourier Transform and Tasseled Cap; The cloud shadow can be removed by applying the Haze Reduction and Principal Components Analysis.
结果 利用空间卷积运算、傅立叶变换、傅立叶图像编辑、傅立叶逆变换组合和缨帽变换的方法有效地去掉了试验区图像上的云层;利用去霾处理和主成分分析方法按一定顺序组合将有效地去除云层的阴影。
-
As a result, dry road temperature should order from low to high, let solvent methodically, evenly by volatile external fully, within flusher.
因此,烘干道温度应由低到高顺序递增,让溶剂有序地、均匀地由内向外完全挥发,不留异味。
-
Based on two kinds of control strategies of VSR under unbalanced grid condition,the introduction of a new VSR control strategy featuring undamped -oscillation that simplifies the controller structure and effectively improves VSR"s performance under unbalanced grid condition.· A systematic description of the state switching in trilogic PWM signal generation of three-phase CSR by using the conversion between bilogic and trilogic switching functions.· Referenced to the CSR"s trilogic PWM signal generation, an approach to achieve low-stress natural commutation of switching devices by reshuffling the vector composition sequence, resulting reduced switching loss.
在研究了两类电网不平衡时的VSR控制策略基础上,提出了一种新型的基于无阻尼振荡控制器的VSR不平衡控制策略,在简化控制结构的同时,有效地改善了电网不平衡时的VSR控制性能;·通过二、三值逻辑开关函数间的转换,系统地描述了三相CSR三值逻辑PWM信号发生中的状态切换;·结合三相CSR三值逻辑PWM信号发生规律,提出了通过调整矢量合成顺序而使功率管获得自然换相的低电压应力SVPWM控制,从而有效地降低了功率管的开关损耗。
-
Referenced to the CSR's trilogic PWM signal generation, an approach to achieve lowstress natural commutation of switching devices by reshuffling the vector composition sequence, resulting reduced switching loss. With the background of and well instanced by the Xinjiang Autonomous Region's Key SciTech Project"Solar Photovoltaic grid-connected inverter", the dissertation work implemented the new approach of a grid-connected PV inverter that was of single-phase VSR topology and with MPPT .
在研究了两类电网不平衡时的VSR控制策略基础上,提出了一种新型的基于无阻尼振荡控制器的VSR不平衡控制策略,在简化控制结构的同时,有效地改善了电网不平衡时的VSR控制性能;通过二、三值逻辑开关函数间的转换,系统地描述了三相CSR三值逻辑PWM信号发生中的状态切换;结合三相CSR三值逻辑PWM信号发生规律,提出了通过调整矢量合成顺序而使功率管获得自然换相的低电压应力SVPWM控制,从而有效地降低了功率管的开关损耗。
-
According to the surface electromyogram to statistically analyse IEMG and knee joint in different phases, we can find the relationship among the main work muscle in swinging of hurdle step, the cooperative muscle of crura muscle in doing act, the change of angle in pressing and touching down, and skill action.
根据表面肌电图,对IEMG及不同阶段膝关节角度进行统计分析。结果发现,在跨栏步摆动腿动作中的主要工作肌,在完成相应动作的肌肉发力顺序,在完成动作过程中下肢肌肉表现出来的协作肌和对抗肌以及蹬地和着地时角度变化跟技术动作的关系。
-
The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.
富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。
-
Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.
通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。
-
In the CDMA cellular system based on SIC, the numbers of possible rate modes and decoding orders grow exponentially with the number of users. How to efficiently allocate rates is an NP problem, which involves the joint optimization of rate allocation and decoding order adjustment.
在基于SIC的CDMA蜂窝系统中,可能的速率模式与译码顺序随着用户数的增长而指数增长,如何有效地分配用户速率是一NP问题,需要考虑速率分配与译码顺序调整的联合优化。
-
With all the information provided, the text can be properly rendered on output devices, as well as accessed by the cursor despite the difference between logical and rendering order in some scripts like Indic, Hebrew and Arabic.
利用这些信息,文本可以在输出设备上正确地显示,也可以正确地处理光标位置,而不用管像印地语、希伯来语和阿拉伯语这样的语言中不同的逻辑和显示顺序。
- 推荐网络例句
-
They weren't aggressive, but I yelled and threw a rock in their direction to get them off the trail and away from me, just in case.
他们没有侵略性,但我大喊,并在他们的方向扔石头让他们过的线索,远离我,以防万一。
-
In slot 2 in your bag put wrapping paper, quantity does not matter in this case.
在你的书包里槽2把包装纸、数量无关紧要。
-
Store this product in a sealed, lightproof, dry and cool place.
密封,遮光,置阴凉干燥处。