项目
- 与 项目 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Considering thd weak preferencde, incomparability and unclear future of the projects in multi-criteria decision-making, we introduce the PROMETHEE algorithm and use the concept of triangular fuzzy numbers to modify it.
考虑到科技成果转化项目多指标决策中普遍存在弱优先性和不可比性的客观现实,引入了PROMETHEE法,基于项目评价指标具有模糊性和不确定性的特点,用三角形模糊数的概念对其进行改进,同时给出了相应的算法。
-
Traditionally, the insurance on offer has covered political violence, nationalisation and expropriation of assets and currency inconvertibility.
传统的保险项目覆盖了政治爆力、资产没收及征用、限制货币自由兑换等项目。
-
CCDI's portfolio shows a history of working for the progress of the public. Our projects have been recognized by both the public and the consultancy industry, most recently with the design of the "Watercube", the National Swimming Center and other six sport facilities for the Beijing 2008 Olympic Games. Incus the past, we have provided project management services for the Shanghai International Exhibition Center, using our experience to achieve an optimized control of time, cost and quality of the project. At present, our work in the Healthcare industry is helping to raise the quality of Chinese medical facilities to international standards and our Environment and Energy division has begun an ecological preservation effort at Dongli Lake in Tianjin….. At CCDI, we care about the environment we are living in and we are here to help resolve challenges presented in the progress of China urbanization.
CCDI为2008年北京奥运会主持设计了国家游泳中心"水立方"、网球中心、沙滩排球馆、射箭场、曲棍球场、小轮车场等六个场馆;意识到城市可持续发展的迫切性,我们正在推进天津东丽湖全生态城镇方案以及河南、安徽、山东等地区新能源项目的实施;在医疗领域,我们关注人们的医疗和健康,将国际标准应用于医院设计,引领国内医疗行业设施建设的发展方向;通过国际经验的运用,为上海国际会展中心提供全程项目管理服务,实现了时间、成本、质量的更优控制……在CCDI,我们珍爱我们生活的城市环境,为此我们将一如既往地担负起企业的社会责任,为中国城市建设提供高标准的专业服务。
-
Some indetermination factors are brought in a large software item development,which could result in the risk of failure.
进行大型的软件项目开发过程中,由于种种难以预见的不确定性因素,会给软件项目带来造成失败的风险。
-
The development of modern project management presses for integrated risk management and life cycle risk management,using systemic and dynamic measures to weigh and appraise risk thoroughly,and taking corresponding measures to control it,so as to reduce the indetermination in the process of project.
现代项目管理行业的发展迫切要求集成化风险管理和全寿命风险管理,用系统的、动态的方法对风险进行全面的衡量和评价,采取相应的措施加以控制,以减少项目过程中的不确定性。
-
In the decision of exclusion each other group of projects investors select the different evaluation indicatrix, so it is not identical that investors get priority order of projects.
投资主体在排它型项目群的决策中,由于选择的评价指标不同,从而导致评价的项目优先次序不一致。
-
Every four years thousands of athletes from all over the world take part in individual and team sports.
每4年,都会有成千上万的运动员从全世界各地赶来参加个人项目和团体项目的角逐。
-
Another way to describe other events which are not team sports is individual sports / individual sports.
描述不是团体项目的方法是 individual sports /个人项目。
-
The above 12 industrial real estate projects are the large scale projects in Shenyang, with value of indicators.
上述12个工业地产项目是目前沈阳地区规模比较大的项目,具有指标参考价值。
-
However the ineffectiveness of traditional tools and techniques in dealing with project risk dynamics calls for new approaches.
然而项目风险的动态复杂性使得传统方法与技术不能有效地识别和应对项目风险。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力