项目
- 与 项目 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
So the projects were large, they produced a lot of talent, one of the largest projects for instance was the Lavie Project, which is not named after me, but this was the name of a jet fighter wholly designed and manufactured in Israel and the decision was to cancel the project some time around the early '80s which immediately released to the market 14,000 engineers and technicians that were looking, were hungry, for what to do with their talent .
因此,项目大,他们制作了大量的人才,最大的一个项目,例如是拉维项目,这不是我的名字命名的,但这是名称的喷气式战斗机设计和制造完全在以色列和决定被取消的项目一些时间约80年代初立即释放到市场的14,000名工程师和技术人员说,正在寻找,都饿了,对如何处理他们的才能。
-
Since 2000, the project I had/have been responsible for include:Health Effects of Fine/Ultrafine particles in ambient air of Beijing founded by Natural Science Foundation China and also cooperated with GSF, Germany; Energy Selection and Health Benefits in Beijing and China funded by IES program of USEPA, Study of Environmental Cost Model in China funded by USEPA, Risk Assessment for health Effects of Biological Indoor Air Pollutants and outdoor air pollution funded by China Ministry of Science and Technology; Health Effects of Fine Particles from the Dust Storms in China funded by NSFC and also cooperated with NIER, South Korea, etc.?
目前有在读的博士生2人、硕士生6人,MPH5人。主要研究方向为室内外空气污染对人群健康影响的定量评价及方法、环境污染健康风险评价及方法学。目前主持承担的科研项目有:国家自然科学基金重点项目"大气细颗粒和超细颗粒的环境行为。界面过程和健康效应",国家"十一五"科技支撑计划项目"建筑室内生物污染控制与改善关键技术研究"和"环境污染的健康风险评估与管理技术研究",欧盟课题"健康与环境网络建设"、韩国环科院合作项目《亚洲沙尘污染对儿童健康影响的比较风险研究》等
-
Because risk factor and the project participant's complexity involved in one's own characteristic and allocation of risks, BOT project risk is become BOT difficult point.
由于BOT项目本身的特点及风险分担涉及的风险因素和项目参与方的复杂性,BOT项目风险的分担因此也成为BOT项目理论研究中的难点。
-
In the study on allocation of risks in BOT project, have broken through and is limited to the research in the legal meaning that BOT is practiced, explore the method that BOT project risk shares reasonably and effectively, has designed and set up the mechanism of allocation of risks of BOT project on the system aspect, and has arranged many kinds of measures to different systems, has guaranteed the practicability of this mechanism, have offered the new thinking and method for solving the problem of allocation of risks in BOT project.
在对BOT项目风险分担的研究中,突破了限于BOT实践而在法律意义上的研究,探索BOT项目风险合理、有效分担的方法,在制度层面上设计并建立了BOT项目的风险分担机制,并针对不同的制度安排了多种措施,保证了该机制的实用性,为解决BOT项目风险分担问题提供了新的思路。
-
An export item is presented.
以具体进出口贸易项目为主线,经过导学项目及知识准备,教师开始引导学生自主地交替进行各种真实业务背景下的操作和训练,学做合一,教师配合指导、答疑、评价、测试,将理论知识的运用置于一个真实的项目中展开,项目完成后学生能够牢固掌握相应进出口业务单证的制作与使用技能。
-
First, after elaborating the implication, characteristics and process of venture capital, this paper expounds the essence of venture capital appraisal and its significance in venture capital and materially distinguishes between the venture capital appraisal and traditio
首先,本文在介绍风险投资涵义、特点和流程的基础上,阐述了风险投资项目评价的本质特征,以及项目评价在风险投资过程中所处的重要地位,分析了风险投资的项目评价与传统项目评价的本质区别。
-
Nowadays, real estate companies mainly gain the commercial loans from domestic banks and the returns of the properties sold and presold. The resources of the developing funds from the monetary trust, IPO and private financing are limited and it is only a small proportion of the sources of the developing funds. Every commercial bank all strengthens the attention of the loan risk and is strict with the process of examining and approving loans. At the same time
现在国内房地产开发项目主要依靠商业银行贷款和项目销售回款,资金信托、上市融资和私募融资都占有房地产项目开发融资资金来源的极小比例,在商业银行强化风险意识,各大银行逐步严格对房地产开发项目的建设贷款的审批,同时国家不断的通过土地政策和开发政策,对房地产行业进行宏观调控,在新的形势下的房地产开发企业在大型房地产项目开发的过程中,拥有足够的融资能力和融资渠道,就显得极为重要了。
-
Six conclusions have been drawn from the study:(1) WWF Yangtze Programme in Xipanshanzhou Polders has resulted in four outcomes, including more income, increased wellbeings, reduced vulnerability, more sustainable use of the natural resource base.
得出6个结论:①WWF在西畔山洲垸的替代生计示范项目增加了农户的收入和福利,降低了脆弱性,增强可持续利用的自然资源基础;②妇女、老人以及低收入群体从项目中获益;③参加项目的农户比未参加项目的农户拥有更多的收入和财产;④与2000年项目开始时相比,生计水平有了持续的改善;⑤生计改善的原因是当地社区的积极参与、国家政策机遇、伙伴关系的建立、社区基层组织建设以及适应性管理方法的应用;⑥鱼类和水鸟等返回已恢复的湿地。
-
Methods The contents and requirements of the evaluation occupational hazard of project schedule were identified. According to the principle of the Gantt chart, project progress management plan was made for the project schedule management in evaluation of occupational hazard of a project.
明确建设项目职业病危害评价项目活动的内容和进度要求,根据甘特图的原理,以某建设项目职业病危害控制效果评价的项目进度管理为例,绘制出一张项目进度管理工作计划表。
-
The content covers the four phases of project management - initiation, development, implementation and finalisation - with a focus on the early planning stages of project management.
项目管理四级证书课程先用2天时间为刚接触项目管理工作的学员提供基础项目管理知识。特别适合那些从事低价值,低风险的项目,或多重的、独立的项目管理。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。