英语人>网络例句>项目 相关的搜索结果
网络例句

项目

与 项目 相关的网络例句 [注:此内容来源于网络,仅供参考]

Informatization project management is to adopt the basic methods of project management with the consideration of the characteristics specifical to the informatization project to carry out all-round planning, follow-up, and control in order to ensure the project per se and the outcome of project operation to meet their objectives.

信息化项目管理是针对信息化项目,采用项目管理的基本方法并结合信息化特点开发的管理方法,对信息化工程项目进行全面的计划、跟踪、控制,保证项目本身和项目的结果达到预期目标。

In this article is described the overview of Ling Ao Nuclear Power Plant Advanced Fuel Management project (1/4 core reload) Project, the first high burnup advanced fuel management project in China. The contents include the scope of the project, analysis and justification made for the project, licensing arrangement and site realization.

本文阐述了国内首个高燃耗先进燃料管理项目-岭澳先进燃料管理(AFM,Advanced Fuel Management project)1/4换料项目的总体情况,包括项目的内容和范围,项目分析和论证情况,项目的执照申请及安排,以及项目的实施情况。

These "problem properties" from the causes can be divided into seven categories: The first is caused by disordered development; second is not strictly project approval, business-to-project development funds are not implemented; third is absconding money led to real estate developers failed to materialize; four the project to rely on bank loans, the state tightened money supply, no follow-up support for the construction funds for construction; five real estate policy is due to gradually improve over the past administrative allocation of land are required to pay a large number of land transfer and value-added tax to pay the gap too big , developers can not afford to pay; Sixth, the lack of project feasibility study, sales difficult construction projects shall not be able to implement; Seven developers for other economic cases sealed by the court project.

这些&问题性质&的原因可分为七类:第一是所造成的无序发展;二是不严格项目审批,企业对项目的开发资金不落实;三是潜逃钱导致房地产开发商未能实现;四个项目依赖于银行贷款,国家收紧货币供应量,没有后续支持建设建设资金;五年房地产政策是逐步改善,在过去的行政分配土地都必须支付了大量的土地转让和增值税支付的差距太大,开发商无力支付;第六,缺乏项目可行性研究,销售困难的建设项目将无法实施;七开发其他经济案件由法院密封项目

Ie. Once the owner of the project discloses the project to the venture capitalist, the latter expropriates the project but not finance for him. If the venture capitalist does so, he needs to pay a certain amount of compensation to the project's owner.

其次,本文假设当项目持有人向风险投资家展示其项目时,虽然风险投资家知道这个项目是个有利可图的项目,但是风险投资家拒绝向其融资,而是对这个项目进行购买,支付相应的补偿数额,然后单独实施这个项目

The thesis reviews the fire power construction project and project quality management theories, analyzes the problem of fire power construction project quality management, shapes interrelated solution. The combining of fire power construction project and project quality management is guaranteed. So the application and development of project quality management in the fire power construction is more systematical.

本文主要是通过对火电施工项目以及项目质量管理理论的回顾,并通过对火电施工项目质量管理中存在问题的分析,制定相关的解决方案,保证火电施工项目项目质量管理进行了有机的结合,使项目质量管理在火电施工中得以更系统的应用与发展。

objective to assess the fulfillment of round 3 of global fund aids program in china in order to provide basis for selecting scientific preventive measures and making reasonable work plan.methods to analyze the core programs from reports of round 3 of global fund aids program in 72 counties of 7 provinces in mid part of china,and to assess it by combining specific investigated results.results up to dec 31,2006,fulfilling rate of receiving treatment for occasional infection,and the number of preventing aids patients as well as infected persons was 98.57%.the rate of other index overpassed rearranged objectives.of which,the rate of vct was 111.45%,the rate of receiving anti-virus treatment was 108.42%,the rate of programs activities of government and non-government was 133.83%.at least there was one teacher trained living skills about aids.the fulfilling rate of the number of middle schools of developing living skill education about aids was 125.73%.the fulfilling rate of the number of middle school students educated about living skills was 147.53%.conclusion the fulfillment of objective management of round 3 about aids,especially core index was effective.but there existed the problem that fulfilling rate of some index was too high,which would be corrected in the later phase.

对中国中部7个省72个县实施第三轮全球基金艾滋病项目的完成项目指标报表进行汇总,对其中10个核心项目进行分析。结果截至2006年12月31日,10个核心项目中,除接受机会性感染治疗和预防的艾滋病患者/感染者人数的完成率为98.57%,其他指标完成率均超过了预定目标。其中自愿咨询检测人次数的目标完成率为111.45%;接受抗病毒治疗的艾滋病患者数的目标完成率为121.37%;获得关怀与支持的hiv感染者/艾滋病患者及其家庭数的目标完成率为108.42%;政府部门与非政府机构主动开展的项目活动数的目标完成率为133.83%;至少有一位教师接受过艾滋病生活技能培训,并对中学生开展艾滋病生活技能教育的中学数的目标完成率为125.73%;接受生活技能教育的中学生数目标完成率为147.53%。结论第三轮艾滋病项目的目标管理,特别是核心指标的完成情况取得了比较理想的效果,但存在个别指标完成率过高的问题,将在后续阶段予以纠正。

So it is very important to make good decision before the project, and choose the location right, even to make good analysis so as to get the best scheme,which is a crucial problem to be responded and settled while many large real eatate corporation empolders the projects.

因此在项目开发前做好项目开发前期决策论证,选择起步区以及对起步区项目进行正确的产品定位和产品组合,做好项目投资分析并取得最优方案,对项目至关重要,是目前众多房地产开发企业在进行大型项目开发前应当首先回答好和解决好的极为重要的问题。

Continue to implement key projects on schedule, watch the quarter system, the implementation of key projects "trinity" of major projects tied accountability and "number one" straight grasping system, the leadership of district-level sub-system, improving the joint hearing the old system to the project, focusing on project publicity system, networking, presentation, the reported information, such as multi-level communication mechanism, information on key projects to achieve timely communication, accurate data.

继续实行重点项目月调度、季观摩制度,推行重点项目&三位一体&捆绑责任制和重大项目&一把手&直抓制、区级领导分包制,完善旧改项目会审制、重点项目进度公示制,建立网络、简报、专报等多层次的信息沟通机制,做到重点项目建设信息沟通及时,数据准确。

With the help of related economic theories, thethesis is trying to classify the environmental and sanitary infrastructure construction projects into three kinds: non-commercial projects, quasi-commercial projects and commercial projects. On the basis of the classification, in the process of the reform of the investing and financing system its advisable to specify the function of the government, to set up the guidance of the project classification and investing system, and to adjust measures to cope with different projects aecoding to their varied conditions.

本文运用相关经济学理论将上海的环卫基础设施项目分为非经营性项目、准经营性项目和经营性项目,指出在环卫基础设施投融资体制改革过程中,明确政府职能定位,建立环卫设施项目分类指导和投资制度,因地制宜地针对不同性质的项目采取相应的具体措施。

At the same time, the PFI2004 puts forward the investment that establish the exhibition meeting cooperation item guidebook for the very first time, and 《PFI2004 investment cooperation the item gathers》, that that volume register the point to investment to join the exhibition the business enterprise to cooperate item and technologies creative item, market development foreground good, the technology contains the high item in deal, also will include to usher in the intelligence item.

同时,PFI2004首次提出创办展会的投资合作项目指南,及《PFI2004投资合作项目汇总》,该册将重点收录参展企业的投资合作项目及科技创新项目,市场发展前景好、科技含量高的项目,同时也将包括引智项目

第4/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。