隐
- 与 隐 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Therefore, it's necessary to solve the gradients of the limit state function by numerical methods.
因此,对于隐式的或复杂的显式功能函数,必须采用数值微分方法来求解功能函数的梯度。
-
This paper presents an efficient optimization algorithm and complicated code for Airciraft Landing Scheduling Problem,Based on Depth-first-search implicit emumeration algorithm,subject to MPS limiting,position lock limiting and optimization depth limiting.
以深度优先搜索的隐枚举算法为基础,结合 MPS约束、位置冻结限制、优化深度限制,使用复杂的软件编码实现了特定于飞机着陆调度问题的优化排序算法。
-
In the study area, the thinning-out line of albic horizon is coincident with the 55.74m contour line, and the maximum horizon error was less than 1m and the maximum vertical error less than 0.04m.
基于湿地边界标准的湿地的定义应为:湿地是陆地和水体之间的过渡带,是由于地表淹水/土壤水饱和而形成的一种隐域性自然综合体,其上界位于陆地土壤诊断层的尖灭点处,其下界是有根植物下界。
-
For Cain was before Abel and Seth in age and title; Jerusalem had precedence above all other parts of the earth, for in it were priests lineally descended from Aaron, and greater numbers followed the scribes, Pharisees, and priests, than unfeignedly believed and followed Christ Jesus and his doctrine; and yet no man of judgment, we suppose, will hold that any of the forenamed were the Kirk of God.
为该隐以前阿贝尔和Seth在年龄和职称;耶路撒冷排名高于所有其他部分的地球,因为在它被祭司线性下降,由亚伦,和更大的号码之后,文士,法利赛,和司铎,比unfeignedly相信并遵循基督耶稣和他的学说;仍未有任何人的判断,我们假定,将举行任何的forenamed人柯克的上帝。
-
And the reasonable proposal for the construction the region electrical power system was put forwardThe power load forecast is the basis of the power system planning.With the actual planning of regional development,uses a scientific and effective load forecasting methods forecast plans the local load electric quantity,is an important work to the regional power system planning.This dissertation uses the BP algorithm, proposed a double hidden layer structure artificial neural network to the forecast ultra-short-term power system load.After the simulation with the actual data,the method which this dissertation proposed compared to the traditional linear extrapolation Prediction method average absolute percent error of 2.5 percentage points,ten minute load forecasts achieve the average absolute percentage error are smaller than 2.5%accuracy.
本文利用人工神经网络BP算法,提出了一种双隐层结构的电力系统超短期负荷预测方法,经过对实际数据的仿真实验,本文提出的神经网络超短期负荷预测方法比传统的线性外推法预测平均绝对百分误差降低2.5个百分点,十分钟负荷预测达到平均绝对百分误差小于2.5%的精度。
-
By the method, the two-dimensional implicit method can be induced in soluting tridiagonal linear equation group.
这种方法可以将二维隐式方法归结为求解三对角线性方程组。
-
Methods Review and analyse the clinical statistics of 52 saphenectomy cases from October,1995 to October 2004 treated by subficialligature under local anaesthesia.
回顾分析1995年10月至2004年10月期间大隐静脉曲张术后52例下肢复发曲张静脉在局部麻醉下行贯穿缝扎的临床资料。
-
Before we start, let us look at another new feature in the C# version 3.0 called "implicitly typed local variable declaration".
在我们开始之前,让我们看看另一个在C#3.0的新功能称为"隐式类型的局部变量声明"。
-
In an implicitly typed local variable declaration , the type of the local variable being declared is inferred from the expression used to initialize the variable.
在隐型局部变量声明中,正被声明的局部变量的类型从初始化这个变量的表达式推导得来。
-
In an implicitly typed local variable declaration, the type of the local variable being declared is inferred from the expression used to initialize the variable.
For example:在一个隐式类型化的本地变量和声明中,本地变量类型的声明过程是由使用的表达式初始化变量来推断的。
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。