英语人>网络例句>附录 相关的搜索结果
网络例句

附录

与 附录 相关的网络例句 [注:此内容来源于网络,仅供参考]

In the event of any repeat of a performance test failing for reaso imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in A endix up to a maximum of% of the Contract Price.

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。

In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue retesting, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。

The word index is an appendix in this book.

单词索引是这本书的附录

A key word index is an enlargement to the Book.

主题词索引是这本书的附录

APPENDIX 附录 One way of estimating an initial value for the reactance of the CLI and of knowing how different inductive reactance magnitudes perform in a particular bus or line is to plot these values against the fault current at a particular bus.

估计CLI电抗的初始值和了解不同感抗幅值在一条特定的母线或线路中表现如何的一种方法是将这些数值针对特定母线的故障电流绘制成图。

Prior to issuing the Taking-Over Certificate for the Works, the Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would be less than the minimum amount of Interim Payment Certificates

但是,在颁发工程的接收证书之前,若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

The maritime labour certificate, the interim maritime labour certificate and the declaration of maritime labour compliance shall be drawn up in the form corresponding to the models given in Appendix A5-II.

海事劳工证书、临时海事劳工证书和海事劳工符合声明的格式应与附录A5 II中所列的范本相符。

However, prior to issuing the Taking-Over Certificate for the Works, the Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would (after retention and other deductions) be less than the minimum amount of Interim Payment Certificates stated in the Appendix to Tender.

但是,在颁发工程的接收证书之前,若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

The Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would (after retention and other deductions) be less than the minimum amount of Interim Payment Certificates stated in the Appendix to Tender.

若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

1 The Document of Compliance, the Safety Management Certificate, the Interim Document of Compliance and the Interim Safety Management Certificate should be drawn up in a form corresponding to the models given in the appendix to this Code.

16.1 "符合证明"、"安全管理证书"、"临时符合证明"和"临时安全管理证书"应当按照本规则附录所示格式制作。

第13/36页 首页 < ... 9 10 11 12 13 14 15 16 17 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。