英语人>网络例句>间歇 相关的搜索结果
网络例句

间歇

与 间歇 相关的网络例句 [注:此内容来源于网络,仅供参考]

Gliosis plays a critical role in post-traumatic epileptogenesis. The inhibition of the proliferation of astrocytes with 7β OHCH could influence synaptic plasticity, modulate the imbalance of excitatory and inhibitory systems in hippocampus and postpone the latency between injury and the occurrence of chronic spontaneous seizures, furthermore to some extent, reduce the occurrence of post-traumatic epilepsy.

星形胶质细胞增生在创伤性癫痫发病机制中起重要作用,抑制胶质细胞增生,可影响海马突触可塑性,有利于调整海马内兴奋性和抑制性功能系统之间作用的失衡,可延长损伤与发生慢性自发性抽搐之间的间歇期,在一定程度上降低创伤性癫痫的发病率。

Parallel indexing cam is a new indexing mechanism which is used to transfer intermissive motion between two parallel axes.

平行分度凸轮机构是用于两平行轴间传递间歇运动的一种新型分度机构。

Non-uniform deformation of ground surface was often aroused by frost heave, so, controlling the formation and development of frost heave was always of great importance. The mechanism of using intermissive freezing method to control frost heave was dealt in this paper.

土体冻胀容易引起地表不均匀变形,因此控制冻胀的产生和发展是人工冻结技术应用中的重要课题,针对间歇冻结模式控制人工冻土冻胀的机理问题。

Duffing equation has parameter and initial value sensitivity. It can generate chaotic state by adjusting the parameter and initial value, and it also can generate intermissive chaotic state, if the ideal signal and the measured signal applied to the system simultaneously. The actual measured signal can be measured by using this state.

Duffing方程具有参数敏感性和初值敏感性,通过调节Duffing方程的参数和初值可以产生混沌现象,且被测信号和理想信号如果共同作用在Duffing方程上,可以产生有规律间歇混沌现象,利用这种现象就可以实现周期信号的频率测量。

Intermissive freezing; expanded quasi-static; frost heave controlling;mechanism; final ice lens

间歇冻结;广义准静态;冻胀控制;机理;末透镜体

In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.

本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。

In order to solve those problems,this paper presents a signal conditioning method with the averaged value of the first harmonic and proposes an intermitted exciting mode.

为了解决这些问题,本文提出了基波平均值的信号调理方法和间歇激磁方法,检定结果表明了该种方法的有效性。

Intermitted aeration was used to grow the yeast cell to make a physiological condition adative for ethanol fermentation.

主要是利用间歇通气方式,使酵母菌能於酒精酦酵环境下增殖。

In this paper,the test results of a few high-yield irrigation models for rice planting in black grass soil of cold region are presented,they show that the optimum irrigation model is the dry-wet intermitted irrigation method.

对寒地草甸黑土稻作的几种高产灌溉方式进行了试验研究,结果表明:干湿交替不建水层的间歇过水灌溉方式为最佳。

When intermitted aeration was used, a dry cell weight of 2.62 g/L and an ethanol concentration of 28.9 g/L were achieved after 38 hrs of cultivation. Another fermentation was performed by feeding a 275 g/L glucose solution.

酦酵过程中,以间歇通气式批次酦酵培养(每通气3分钟停止通气10秒钟),经过38小时后,菌体乾重可达到2.62 g/L,酒精浓度为

第35/55页 首页 < ... 31 32 33 34 35 36 37 38 39 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?