锚筋
- 与 锚筋 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The welding of sleeve and steel plate, anchor bar and sleeve all adopt the intermittent welding.
套筒与钢板的焊接,锚筋与套筒的焊接均采用间断焊接。
-
It studied the traditional pressure plate bolt anchoring system ,filling and drainage system,and the model of dam-side layout in the rubber dam.After repeated calculation,proposed the new pressure plate bolts anchoring component using pairs of anchor bars and connect the anchor plate and the platen with high-strength bolts,compared and analysis with the traditional pressure plate bolt anchoring system.
小 摘要:通过对现行橡胶坝设计中传统螺栓压板式锚固系统、充排水系统及坝端布置模式的研究,运用对比分析的方法,经过反复计算提出采用双锚筋及用高强螺栓连接锚固垫板和压板的新型螺栓压板式锚固构件,并与传统锚固型式进行对比分析。
-
YM-tensioned anchor client 1, YM strand tensioned anchor client system includes: YM15 anchor (for §15.2,§15.7mm strand) YM13 anchor (for §12.7,§12.9mm Steel Stranded) BM15, BM13-type flat anchor YMZ15, YMZ13-ring anchors (applied to the structure of cyclic stress) 2, YML Series connectors include: single as used prestressing tendon lengthening, usually with in pre-tensioned law; porous as the next long prestressed beam, normally used in the continuous beam. 3, P-type anchorage system for P-type anchorage system includes extrusion anchor (from compression set and a triangle composed of copper wire extrusion spring), anchor anchor plate, spiral reinforcement, constraint circle bellows.
YM张拉端锚具1、YM钢绞线张拉端锚固体系包括:YM15锚具(适用于ф15.2、ф15.7mm钢绞线)YM13锚具(适用于ф12.7、ф12.9mm钢绞线)BM15、BM13型扁锚YMZ15 、YMZ13 型环锚2、YML型系列连接器包括:单孔作为接长预应力筋用,通常用于先张法中;多孔作为接长预应力束,通常用于连续梁中。3、P型锚固体系P型锚固体系包括挤压锚具(由挤压套和三角形铜丝挤压簧组成)、锚固锚板、螺旋筋、约束圈、波纹管。
-
During tests and analysis, the influence of bond length and the slope of inner wall of the outer steel tube have been studied.
对于夹片式锚具,通过对传统的夹片式锚具进行改造,改善了碳纤维筋在夹片式锚具作用下的受力性能。
-
Both break through the rules which request that the bore diameter should be bigger than the steel bar diameter trebly or not smaller than the steel bar diameter adding 50mm.
4设计锚孔直径50,锚筋直径28,突破了规范关于锚孔直径需大于锚筋直径3倍或不小于锚筋直径加50mm的规定。
-
Fine physical models of plunge pool with regard to Xiluodu Water Power Station were made in these experiments.
结合溪落渡水电站工程,制作了水垫塘精细物理模型,采用先进的模拟方法和测量手段,研究了在底板块止水完全破坏、锚筋失效,其四周及底部完全贯通的情况下,反拱水垫塘拱圈3个活动底板块的运动特性。
-
To arrange the prestressed tendons and anchor devices on the web of box girder conveniently, a theoretical analysis, numerical calculation and model test on local stresses in concrete under anchor devices were performed separately using a typical segmental model, a subrange model and a similar model for the scheme design of Hutiaomen major bridge.
为便于箱梁腹板预应力筋及锚具的布置,结合虎跳门连续刚构桥的方案设计,对特征节段模型、子区域模型和试验模型锚下混凝土局部应力分别进行了理论分析、数值计算和试验研究。
-
And, the design of grouted helix anchor can adopt the partial material safety factors method.
FRP螺旋锚杆若采用分项安全系数法进行设计,能充分地考虑FRP筋对锚杆安全性能的影响。
-
Through analyzing the work characteristic and the work mechanism of the interface in this research paper, bonded rebar technique is applied to the bonding treatment of the interface, the reformative method of enlarging sectional areas is proposed, and the work mechanism of the anchor bar in the interface is analyzed. The work mechanism of the reformative method of enlarging sectional areas and the interface mechanical performance have be more systematical analyzed and studied with the finite element numerical simulation method, the structural testing method, and combing project practice. Based on that, the suggestion formula of shear and tension bearing capacity for the old and new concrete is put forward.
本研究论文通过分析新旧混凝土界面的工作特点及工作机理,将化学植筋技术应用于新旧混凝土界面的粘结处理,提出改进的加大截面加固法,分析了锚筋在新旧混凝土界面上的工作机理;运用有限元数值模拟方法和结构试验方法,并结合工程实践,对改进的加大截面法的工作机理及界面受力性能进行了较为系统的研究分析,提出了新旧混凝土抗剪、抗拉承载能力的建议公式;根据研究结果,提出了改进加大截面法的设计原则和施工工法,并在工程应用中取得了良好的效果。
-
CThe overall design process as follows: According to the size and other data, combining the design result of pile and anchor, got the number of the piles along long margin, short margin and the overall number of piles, gave the furnished tables the anchor and the layout map of the pile, the profile and node map of the anchor.
c、整体设计过程如下:根据基坑的尺寸等一些原始资料,结合设计的桩径、桩长、桩中心距、配筋以及锚杆的设计结果得出了基坑长边、短边以及整体布桩数目,给出了锚杆设置情况统计表以及桩的平面布置图和锚杆的剖面图、节点图。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?