英语人>网络例句>锚 相关的搜索结果
网络例句

与 锚 相关的网络例句 [注:此内容来源于网络,仅供参考]

Anchor coral, also called hammer coral, have anchor-shaped ends to their tentacles.

状珊瑚,也叫铁锤珊瑚,有状发展冷凝物到它们的触须。

Anchor coral, also called hammer coral, have anchor-shaped ends to their tentacles.

珊瑚,也称榔头珊瑚,有的外形末端是它们的触须。

HOME PAGE View Basket ANCHOR CROSS STITCH HOME PAGE Main links page for Anchor counted cross stitch kits.

首页查看篮子跨缝首页主要连结网页,为算交叉缝合包。

FLAC3D software is used for simulating anchor frame beam strengthening expansive soil roadcut slope. Main parameters such as length, range interval and angle of anchor frame beam, are investigated so as to acquire how to influence slope deformation.

为了研究杆框架梁的加固效果及其坡率对膨胀土路堑边坡的影响,采用了快速拉格朗日差分分析三维软件FLAC3D模拟杆框架梁加固膨胀土路堑边坡。

This paper introduces bolting technology with wire meshes,beam and cable anchor and parameter design of main support in 1113(3) conveying workface of zhang ji coal mine,through surveying to combined rock pressure of driving and coal winning,it proves feasibility about bolting with wire meshes,beam and cable anchor in large cross section composite roof roadway.

介绍了张集煤矿1113(3)综采工作面运输巷,采用梁网索支护技术解决巷道支护过程中的难点及确定合理支护参数,通过对掘进和回采期间的综合矿压观测,证明梁网索支护在大断面复合顶板煤巷中应用是可行的。

It shows that the action of bolt together with rock must be taken into consideration in order to correctly make computation of rock-bolt supporting parameters.

结果表明,合理的地下层状岩石杆支护参数设计应在考虑杆与围岩的共同作用条件下计算。

Compared disturbed values of the thick tail metal bolt and common bolt under the load action.

比较了金属粗尾杆和普通杆在不同载荷作用下的挠度值。

YG-30 construction drilling rig is used for drilling anchor holes in deep base pit of high building, anchor and reinforce side-slope for water conservatory project, water power station project, railways and highways .

yg - 30施工钻机是用于钻井孔在深基坑高层建筑,,并加强侧边坡水conservatory工程,水利电力站工程,铁路和高速公路。

YGQ-30 construction drilling rig is used for drilling anchor holes in deep base pit of high building, anchor and reinforce side-slope for water conservatory project, water power station project, railways and highways .

ygq - 30施工钻机是用于钻井孔在深基坑高层建筑,,并加强侧边坡水conservatory工程,水利电力站工程,铁路和高速公路。

The result of monitoring consequence of bottom tunnel in period of excavating and withdrawal reveals that the way of suitably increasing length and diameter of the anchor,and building the bottom anchor can effective.

通过对底板煤巷掘进期与回采期巷道变形现场监测表明:适当加大杆长度与直径,并在底板煤巷底帮增加布设底能够有效降低回采巷道变形量。

第24/100页 首页 < ... 20 21 22 23 24 25 26 27 28 ... > 尾页
推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。