铺设
- 与 铺设 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
It was a wonder that there was not a tramline in such an important thoroughfare.
奇怪,这样一条重要的通衢大道,竟然没铺设电车路。
-
BLOOM:(In alderman's gown and chain) Electors of Arran Quay, Inns Quay, Rotunda, Mountjoy and North Dock, better run a tramline, I say, from the cattlemarket to the river.
406布卢姆:(身穿高级市政官的长袍,挂着链子)阿伦码头、英斯码头、圆堂、蒙乔伊和北船坞的选民们,我认为应该从牲畜市场铺设一条电车道,一直通到河边。
-
If I see just a glimmer of a color on television or there's a wet trash bag laying in a gutter somewhere, really, the sky's the limit.
如果我看见的仅是一个彩色微光电视上或有湿的垃圾袋,在一水沟铺设地方,真的,天空的极限。
-
A jet trencher is the necessary equipment for ocean pipeline installation .
挖沟机是铺设海底管线的必备设备。
-
Between Thanksgiving and Christmas of 2003, the tunnel kiln was demolished and removed, and the site was prepared for the new kiln.
与2003年感恩节与圣诞节期间,隧道窑被拆除以腾出位置将铺设新窑。
-
Apart from being available for practice and matches, day in and day out, artificial turf can be laid in alternately shaded stripes that enhance the appearance of the pitch.
人造草皮除了能够不分白天黑夜地进行训练和比赛以外,还可以铺设成明暗相间的条纹赛场,增强草皮的观赏性。
-
T-P-001 series plastics pipe material production line is mainly used in producing diameter and various wall thickness plastics PVC pipe materials for water-supply and drainage of industry and agriculture;water-supply and drainage of buildings,wire laying and xxxxx machine unit is composed of cone double-screw-stem extruder,vacuum shaping table,tractor,cuter,turn-up frame and others.
茶多酚- 001系列塑料管材生产线主要用于生产直径和各种壁厚塑料聚氯乙烯管材用于供水和排水系统的工业和农业;水厂供水和排水的建筑物,电线铺设xxxxx机组组成锥形双螺杆挤出机干,真空成型表,拖拉机, cuter ,把行动框架等。
-
Since the original Trombe wall is single-functional and unaesthetic, a novel concept of BIPV/T, i.e. PV-Trombe wall (short for "PV-TW") is presented in this thesis bases on the idea above. It is constructed by affixing PV cells back of the glass panel. It not only provides space heating in winter and reduces indoor cooling load in summer while generating electricity, bust also improves the visual comfort of building envelop and makes buildings more eye-catching.
针对Trombe墙的功能单一和美观性差的缺点,结合在光伏电池模块的背面铺设流道、通过流体带走热量的思想,我们提出了一种新的太阳能光伏光热建筑一体化方案:在Trombe墙的玻璃盖板的背面贴上光伏电池就构成了新型的带有光伏电池的Trombe墙,即PV-Trombe墙。
-
The criterion for residual deformation of Substructure of unballasted track on railway passenger dedicated line is extremely strict in order to satisfy the safety and comfort requirements of the high-speed train.
中文摘要:为满足高速列车安全、舒适性的需要,保证线路的高平顺性,无碴轨道的铺设与运营对路基、桥涵、隧道等线下结构的工后沉降要求非常严格,追求"零沉降"理念。
-
We always seem to be laying an unbarred passage to welcome the arrival of 'zero distance'.
我们似乎一直在无意中铺设着迎接它到来的无障碍通道。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?