英语人>网络例句>铅丝 相关的搜索结果
网络例句

铅丝

与 铅丝 相关的网络例句 [注:此内容来源于网络,仅供参考]

Key words : revetment works ; inverted siphon ; local scour ; gabion ; decay model

关键 词:裹头工程;倒虹吸;局部冲刷;铅丝石笼;衰减模式

A City's Death by Fire Derek Walcott After that hot gospeller has levelled all but the churched sky, I wrote the tale by tallow of a city's death by fire; Under a candle's eye, that smoked in tears, I Wanted to tell, in more than wax, of faiths that were snapped like wire.

[size=2]死于大火的城市那个燃情的布道者把入了教会的天空外的一切都荡平之后,我在油灯旁边记述一个城市如何死于大火;在蜡烛被烟熏得泪水充沛的目光下,我想用比石蜡更多的话语,讲述铅丝一样崩断的信仰。

Concerning the planning, it was arranged to 120° groyne and the direction of flow diversion, in the construction, water jetting pile sinking was used in the experiment fixed concrete pile, and lead wire cage rubble was filled.

在规划布置时,宜布置成下挑式,顺水导流;施工时采用射水沉桩的方式固定混凝土桩,人工在混凝土桩间填置铅丝笼块石。

Rubberand drum at maximum force at A point of RADIUS R1 and minimum mechanical Department b. RADIUS R2 is different, rubber roller compression over C forms the convex hull, the radius of the highlast C is R3, point b is the radius of the lining of the RADIUS rubberand drum after three RADIUS R1 with the size of the change of Center distance drum to determine the ideal pressure: 0.5mm by Feller gauge or flattening of galvanized wire to precise tuning of two drums of hobber pillow gap, so that it is up to the required data.

橡皮滚筒在最大受力处A不面的半径R1和最小受力处B不面的半径R2是差别的,橡皮滚筒受不抬后转动在C处变成凹包,凹包最矮不面C的半径是R3,B不面的半径是包衬后的橡皮滚筒半径不一个半径的巨细的R1 用保留滚筒洋心距来猜测抱负不张力:用塞尺或0.5mm的铅丝不抬扁来大略不天调动二滚筒的滚枕间隙,使之符分规矩的数据。

With the Woolly Bugger, you'll use a jam knot, a fluffy piece of marabou, lead wire and so on.

与茫然bugger,您使用了拥堵死结,一蓬蓬一块marabou,铅丝等。

Adopting gabions set in the bottom of the revetment works to protect engineering from erosion is necessary.

试验数据分析表明裹头工程根部设置铅丝石笼防护带,对保护工程、减轻边岸冲刷非常重要。

The pile bridge riprap groin is engineering measures for diversion protection, consisting of precast concrete piles, lead wire cage rubble and firewood raft with deep foundation, strong capability of resisting impact, stability of structure, convenient construction, investment saving and so on, making up the easily breaking defects of the traditional ones.

桩式抛石丁坝是一种导流护岸工程措施,由预制混凝土桩,铅丝笼块石及柴排构成,它具有基础深,抗冲能力强,结构稳定,施工方便,节省投资等优点,弥补了传统铅丝笼抛石坝易折断毁的缺陷。

Electrolysis cloth, asbestos diaphragm cloth, asbestos cloth, cloth but woven with metallic asbestos yarn, asbestos yarn, twisted rope, braided round packing, braided asbestos square packing, asbestos round packing with PTFE, tape, glass fiber cloth, glass fiber rope,ceramic fiber cloth, ceramic fiber rope

保温隔热材料:陶瓷纤维布,玻璃纤维布,电解布,无尘电解布,隔膜布,普通石棉布、无尘石棉布,硅酸铝镍丝布,石棉铜丝网格布,石棉镍丝布,石棉铅丝布,石棉及无尘石棉制成的,电解及无尘电解材料,耐酸材料,陶瓷纤维,玻璃纤维制成的线、带、扭绳、编绳、圆绳

B.1.4 Plate zinc materials: flat steel, circle steel, wood screw, lead silk etc.

b.1.4 镀锌材料:扁钢、圆钢、木螺丝、机螺丝、铅丝等。

This involves binding the vines' branches to wires and is usually done in mid-April.

就是将树枝和铅丝绑缚在一起,通常在四月中旬进行。

推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?