英语人>网络例句>钢筋混凝土的 相关的搜索结果
网络例句

钢筋混凝土的

与 钢筋混凝土的 相关的网络例句 [注:此内容来源于网络,仅供参考]

As a result of its lower cost and simpler operation method,the mechanical connections promote the quality of concrete structural steel bar connection,accelerate the construction progress and reduce the project cost.

近年来,钢筋机械连接技术发展迅速,国内外均已开发出能充分发挥钢筋母材强度的等强级机械连接接头,施工速度快,成本低,从而为提高混凝土结构钢筋连接工程质量,加快工程进度,降低工程成本创造了条件。

Concrete three point bending notched beams with reinforcing bar placed at three different positions are used to study the effect of reinforcing bar on crack propagation of concrete.

4通过在跨中预制缝的混凝土三点弯曲梁内的三种不同位置分别布置钢筋,研究了钢筋在混凝土裂缝扩展过程中的限裂作用。

Category III new steel (400 MPA rolled ribbed bar) straighten cutter, cold-rolled and twisted steel machinery, drawing spiral steel machinery, steel stripping rib straight thread rolling machine, concrete pipe machinery, and more varieties and more models available for users Choice, quality, reliable, affordable, timely service, the establishment of a sound quality management system to ensure product quality and stability control, and through the China Quality Certification Center certification.

新III级钢(400MPA热轧带肋钢筋)调直切断机,冷轧扭钢筋机械,冷拔螺旋钢筋机械,钢筋剥肋直螺纹滚丝机,混凝土制管机械,多品种多型号可供用户选择,质量可靠,价格低廉,售后服务及时,建立了完善的质量管理体系,确保产品质量得到稳定控制,并通过了中国质量认证中心的认证。

The endplate bolted SC beam and CCSHRC column joint and the bar passing force's joint of SC beam and CCSHRC column are the same with SC beam and CCSHRC column structure system, the bar passing force's joint of SC beam and CCSHRC column is audacious innovation of joint types.

端板螺栓连接的组合梁、连续复合螺旋箍混凝土柱节点和连接钢筋传力的组合梁、连续复合螺旋箍混凝土柱节点就是适用于这种体系的节点类型。其中连接钢筋传力的组合梁、连续复合螺旋箍混凝土柱节点更是节点类型中的大胆创新。

Prismoid specimen shall adopt horizontal type molding; when pour concrete and tamp down the specimen with hidden steel bar, concrete between steel bar and specimen mould shall be taken particular care so as to keep right condition of pouring and tamping compaction.

棱柱体试件宜采用卧式成型,埋有钢筋的试件在灌注混凝土及捣实时应特别注意钢筋和试模之间的混凝土能保持灌注密实及捣实良好。

According to the three-dimensional finite element analysis, the graph of axis force on steel, the graph of Z displacement on steel and the graph of whole transmogrification on girder are drawn.

通过模型分析计算得出的结果,得到钢筋轴力的分布图,相应的钢筋Z向位移曲线和梁的整体变形图,钢筋应力及混凝土平均应力曲线图,最后根据分析结果推导出钢筋应力与荷载的关系公式。

So, the evaluation and prediction of bearing capability of reinforced concrete structures is a impendent issue in civil engineering.

本文结合省教委研究课题&在用混凝土结构承载能力研究&,以现场浇筑的17根试验梁为基础,研究了钢筋锈蚀后钢筋与混凝土粘结性能下降对结构极限承载能力的影响。

The inhibition effects of di-(2-ethylhexyl)-sebacate on the corrosion behavior of reinforcing steel bar were investigated by electrochemical polarization curves and electrochemical impedance spectroscopy in simulated pore solution.

采用动电位极化曲线和电化学阻抗谱研究了癸二酸二异辛酯在模拟混凝土孔隙液中对钢筋的保护作用。癸二酸二异辛酯的加入导致混凝土钢筋的腐蚀电位正移,对钢筋的阳极电化学过程有抑制作用。

Again, I maintain that we should use the flexural-tensile strain and the vertical shearing stress of the bottom of cover of the joint as the target for the design of the cover structure of asphalt on the old cement concrete. In addition, on the basis of much theoretical analysis, I preliminarily put forward to a designing methods to anchor the old cement concrete road by using dog irons made of iron bars and then covering it using asphalt concrete structure. Finally, through selecting the plan of the cover of the road to be experimented, and making a detailed introduction to the techniques of construction according to the result of theoretical analysis, I know that after anchoring the slabs close to each other with dog irons made of iron, and then cover them using asphalt cement concrete has an obvious effect on preventing and slowing down the reflection cracks in the bituminous concrete skin coat over the old road.

在大量分析的基础上提出了马钉锚固罩面结构中相邻两块水泥混凝土板接缝处的相对水平位移、相对垂直位移、接缝处沥青层底部的弯拉应变和剪应变的计算公式;再次,提出了采用接缝处罩面层底部的弯拉应变、垂直剪应变作为旧水泥混凝土路面上沥青混凝土罩面结构的设计指标,并在大量理论分析的基础上,初步提出了马钉锚固旧水泥混凝土板后沥青混凝土罩面结构的设计方法;最后,根据理论分析的结果,选定试验路的罩面方案,并对其施工工艺进行了详细的介绍,表明采用钢筋马钉锚固相邻混凝土板后,再进行沥青混凝土罩面的方法在防止或减缓罩面层反射裂缝方面具有明显的效果。

The paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects,such technologies as:manufacturing and fixing of reinforcement,steel reinforcement fixing baseplate,web plate and top plate respectively and lifting the steel skeleton into form,requirements of design and manufacturing and way of utilization for dismantling-erection type formwork and hydraulic formwork,optimization of concrete ratio,concrete pouring process of two ends of beam in priority over the middle,in sequence of first baseplate followed by web plate and top plate at last,concrete pouring in inclined section and in horizontal layer,concrete vibration mainly byexternal vibrator in assistance with internal vibrator,methods and regulation for steam curing of concrete,dual controls over stress and strain to ensure quality of prestressing workmanship,construction method of effective beam moving by heavy-weight special moving facility,some regulations and key notes about construction of grouting under pressure,beam ends sealing,water-proof layer on the bridge surface system,protective coating.

文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力~应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。

第55/65页 首页 < ... 51 52 53 54 55 56 57 58 59 ... > 尾页
推荐网络例句

It has been put forward that there exists single Ball point and double Ball points on the symmetrical connecting-rod curves of equilateral mechanisms.

从鲍尔点的形成原理出发,分析对称连杆曲线上鲍尔点的产生条件,提出等边机构的对称连杆曲线上有单鲍尔点和双鲍尔点。

The factory affiliated to the Group primarily manufactures multiple-purpose pincers, baking kits, knives, scissors, kitchenware, gardening tools and beauty care kits as well as other hardware tools, the annual production value of which reaches US$ 30 million dollars.

集团所属工厂主要生产多用钳、烤具、刀具、剪刀、厨具、花园工具、美容套等五金产品,年生产总值3000万美元,产品价廉物美、选料上乘、质量保证,深受国内外客户的青睐

The eˉtiology of hemospermia is complicate,but almost of hemospermia are benign.

血精的原因很,以良性病变为主。