采用的
- 与 采用的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The minimum principal stress criteria adopted in the new model ,compared with the minimum tangential stress criteria of traditional method ,illustrates the mechanism during hydraulic fracturing procedure more objectively.
新的理论模型采用了最小主应力破坏准则,与现有方法采用的最小切向应力破坏准则相比,更客观的表述了水压致裂过程中的力学机制。
-
The minimum distance method is used to match SVD feature extraction and the truncation error method is for PCA.
针对奇异值分解的特征提取采用的是最小距离分类法,针对主成分分析的特征提取采用的是截断误差分类法。
-
ChinaTraditional peer-to-peer or broadcast mode cannot meet the efficiency requirements of Internet routing,and most of the approaches used in current researches on the multicast mode to alleviate this problem are static ones,which cannot solve the variableness problem proposed by Internet.
在Internet路由方面,传统采用的点对点或广播方式不能满足网络信息传输的效率要求,而采用组播方式缓解这个问题的相关研究大多为静态方法,不能很好地解决Internet提出的动态问题。
-
In the air samples ,di(2-ethylhexy) phthalate,di-n-butyl phthalate and dioctyl phthalate were included,while diethyl phthalate,di(2-ethylhexy) phthalate,dipropyl phthalate,butyl benzyl phthalate,dioctyl phtha...
大气环境样品中邻苯二甲酸酯类化合物的预处理主要采用的是索氏提取、溶液提取和填充柱分离;水环境样品中采用的前处理技术较多,但大多数都是萃取技术;底质和生物试样目前用的较多是微波萃取、超声波萃取和索氏提取。
-
However, during borehole grouting pile construction of the present, round section piles are used universally. Generally speaking, the boreholes are drilled by a large diameter round piling bit. Because of the restriction of factors of the mud pumps, and drilling equipments, and drilling technique, it would result in such problems as fol lowing: a bigger cutting area and overlarge cuttings volume, and more hole bottom sediments, difficult cuttings discharging, and serverely repeat cuttings breaking, and using more concret grouting amount, and lower drilling speed, faster bit wearing, and longer working period, bigger material and labor ex haust, and higher engineering cost, unreasonable ratio of loading capacity to volume of pile foundation, and lower comprehensive economic benefits, and so forth.
然而,钻孔灌注桩施工中,目前最为普遍采用的是圆形断面桩基,一般采用大口径圆形基桩工程钻头,由于国内生产的泥浆泵、钻具及钻进方法等因素的限制,从而使钻孔破岩面积和体积过大,造成孔底沉渣过多,排渣困难且排浆量大,重复破碎问题突出,混凝土灌注量大,直接反映为钻进效率低、钻头磨损快、施工工期长、材料能耗和劳动消耗大、工程成本较高、桩基荷载能力与体积比不合理、综合经济效益不理想等,这些问题严重影响和制约着钻孔灌注桩施工技术的发展和进步。
-
But the Corvette's body panel is unsteel, the light weight fiber glass .
在刷漆之前,很多车的车身面板采用的都是生铁,但是 Corvette 的车身面板并不采用钢铁,而是重量轻的玻璃纤维。
-
That X series refresh we've been waiting on from Lenovo seems to have become imminent as the company's website has published the latest version of its maintenance manual, which now includes the models X201, X201s, X201i and X201si. The X201 will come with Intel CPU options ranging all the way up to the 2.66GHz Core i7-620M -- a true powerhouse with 4MB of cache that is already available on T410 and T510 models -- while the slimmer X201s will plump for the lower-volted Core i7-640LM, clocked at a reputable 2.13GHz but also consuming 10W less power than its chunkier sibling. The X201i and X201si will likely prop up the pseudo-affordable part of Lenovo's range with Core i3-330M parts.
如果说,ThinkPad Edge让你不知所措,那么联想官方网站透露出来的维修手册内容可能会让你稍微感觉好点,根据信息来源,我们将会看到X201, X201s, X201i以及 X201si, X201 系列笔记本将配置 Intel 处理器,顶配可以看到2.66GHz Core i7-620M(基于Arrandale双核心,集成45nm图形核心,2.66GHz频率,显示核心频率在500MHz,支持DDR3 1066,有4MB缓存和35W TDP),就是T410 和T510 型号上已经配置的;X201s则采用的是 Core i7-640LM处理器,频率有所降低到 2.13GHz,不过功耗可以少10W;X201i 和 X201si则采用的是 Core i3-330M 处理器,触摸板现在是可选配置,不知道你是否满意这个升级?
-
At the same time however the pressure to be factory rather than site based, militates in favour of lightweight buildings. In UK hours construction this has response environment with low thermal mass.
这就在英国房屋建造中导致了更多地采用,木框架和砖质外维护墙的组合或目前采用的钢框架结构,这两种建造趋势都缺少热惰性材料而使外界环境的变化对房屋温度有了更快的影响。
-
The PI controlling system with the ability of intelligent logic judging method, can decide to choose perfect controlling operations, according to the height of coal in the ball mill, entrance pressure and the exit temperature error, which can avoid to operate wrongly because of the inter-inference of different control.
带有智能逻辑判断功能的PID控制系统,采用智能逻辑判断方法,根据磨煤机入口负压及出口温度所处的偏差区域,确定应该采用的控制操作,可以有效地避免由于各控制过程之间的相互干扰而导致总体控制效果严重恶化甚至整个控制系统无法正常投入等问题。
-
In derivations of these equations, the discharges which flow through the check gate are calculated with the orifice equation for building the relationship between upstream pool and downstream pool of the gate.
在公式的推导过程中,过闸流量采用的是大孔口出流公式,没有采用工程中常用的闸孔出流公式,这是为了便于建立上、下游渠池间的联系。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?