配电系统
- 与 配电系统 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
KLE lighting busway is originally imported from Schneider Electric Europe. KLE lighting busway only need 4 components to complete the lighting system: straight length, feeder units, hangers and tap-off units.
KLE照明母线为施耐德电气旗下欧洲原装进口的先进照明配电产品,只需四种部件即可完成照明系统:直线段、馈电单元、固定卡件、可选相支接单元。
-
Substation automation is the secondary substation equipment (including measuring instruments, signal systems, relay protection, automatic devices and remote devices, etc.) through a combination of functions and optimize the design, use of advanced computer technology, modern electronic technology, communication technology and signal processing technology, on all major substation equipment and transmission and distribution lines of automatic monitoring, measurement, automatic control and computer protection, and integrated communications and scheduling automation features.
变电站综合自动化是将变电站的二次设备(包括测量仪表、信号系统、继电保护、自动装置和远动装置等)经过功能的组合和优化设计,利用先进的计算机技术、现代电子技术、通信技术和信号处理技术,实现对全变电站的主要设备和输、配电线路的自动监视、测量、自动控制和微机保护,以及与调度通信等综合性的自动化功能。
-
Switch should match sequence of lighting fixture control.
照明系统通电,灯具回路控制应与照明配电箱及回路的标识一致;开关与灯具控制顺序相对应,风扇的转向及调速开关应正常。
-
From the burden increased aspect clarify set upthe necessity of station, then pass to drew up to set up generalizeof transformer substation and line direction to consider, and passto analysis of carry the data, safety, economic and dependableconsider and made sure the 110 kV, 35 kV, 10 kV and station useelectricity of lord connect line, then again through burdencalculation and power supply scope made sure main number, capacityand model number of the transformer set, also in the meantime makesure the station uses capacity and model number of transformer,end, according to biggest keep on work electric current and shortcircuit calculating of calculation result, to the high pressureRong break a machine, insulate a switch, female line, insulate sonand wear a wall set tube, electric voltage with each other feelingmachine, electric current with each other the feeling machinecarried on choose a type, thus completed a 110 kV electricity apart of design.
本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。
-
The distribution management information system that based on Java and GIS technology describes the function of the dist...
提出了GIS 的应用在Java开发环境下配电管理系统的应用解决方案,对应用GIS中出现的数据共享、冗余性的消除以及空间数据和属性数据相关联等问题提出了解决方法。
- 推荐网络例句
-
However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.
然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。
-
Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.
镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。
-
A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.
付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。