进度
- 与 进度 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
City leaders should grasp owing on the loan at the progress in the mayor called "management center" for the recovery of a loan one day reported daily summary owing on the loan data provide the "recovery of loans table" in order to master the city's leading timely repayment progress, take corresponding measures.
市领导要随时随地掌握还贷工作的进度,分管市长要求&管理中心&对贷款回收情况实行一天一报,每天汇总还贷数据,填报《贷款回收情况表》,以便市领导及时掌握还款进度,采取相应措施。
-
The phone numbers of service institutions, list of linkmen and schedule of exhibition will included in the service guide of attending exhibition, at the same time will appear in exhibition websites. To ensure the success of pre-work of exhibition, attending enterprises have to contact with relevant institutions in time based on requirements of schedule.
承办单位将委托有关的承建商、承运商等服务机构为参展商提供各项服务,各有关服务机构的联系电话、联系人和展览会的进度安排都将登载在《参展商服务手册》和展览会网站上,参展商应根据进度安排及时与有关机构取得联系,以确保展览会前期准备和布展工作的顺利进行。
-
Gages/testing equipment requirements may also be identified at this time and should be added to the Timing Chart. Progress should then be monitored.
量具/试验设备要求也可在这一时间识别,产品质量策划小组应将这些要求增加到进度图表中,然后监测进展,以保证满足所要求的进度。
-
Show the current progress graphically by displaying progress lines on your Gantt Chart .
通过在&甘特图&上显示进度线,能以图形方式显示当前进度。
-
Construction progress chart compiled with flow process without steps is difficut to show the critical path. The construction period is long and difference is large.
摘要]现行的无节拍流水进度编制方法编制的施工进度计划表难以反映关键路线,得出的工期长而且偏差大。
-
Access to on-site supervision to do the actual progress of the construction situation shall be reported monthly to the Project Management Office, in a chart the progress of the actual progress and plans for the project management well informed of the actual progress.
监理办在获得现场工程进展的实际情况后应每月向项目管理处上报一份实际进度与计划进度图表,以便项目管理处了解工程的实际进展情况。
-
This article embarks from the project time management, and unifies the characteristic of railroad engineering construction, conducts the research on Huang family slope first tunnel section (DK1603+080 ~ DK1603+184) engineering project time management and optimization.
本文从项目时间管理出发,结合铁路工程建设的特点,就中国铁路工程第十六局承建的武汉至广州客运专线长石村铁路隧道——黄家坡一号隧道标段(DK1603+080~DK1603+184)工程项目时间管理及优化进行了研究,文中对本项目工程计划、进度、时间管理和优化进行了阐述,在工程进度计划上进行了分析,并使用关键链法对项目计划进行了时间优化研究。
-
Consequently, it leads to a lot of problems which could cause the imperfect procedure of new products introduction, delay of marketing and quality problems for new products which finally results in the customers' dissatisfactions, degradation of enterprises brands and decline of competitiveness. Some research data show that Chinese company may have some problems in their new product introduction process: the product can't meet customers requirement in the market; don't design or introduce new product to meet customers' requirement; many times rework in the introduction process, and redesign the new product after introduction; without timely introduction plan, the new product introduction cycle is slow compare to the transnational Corporations and new technology.
研究资料表明,中国企业在进行产品导入的过程中经常会出现以下问题:上市的产品有诸多质量毛病,不能满足客户的需求;新产品开发和导入过程中,仍然奉行技术导向的思路,自己能做什么就做什么,而不是千方百计满足顾客的需要;产品导入过程经常出现返工,不断地从生产甚至是从市场返回到设计部门重新设计,导致大量的重复劳动;产品导入速度相对市场中的跨国企业以及行业的技术更新,显得非常缓慢,新产品开发和导入项目在开展时缺乏精确的进度计划,因此缺乏进度控制等等。
-
Besides, engineers can process time management more flexible and maximize the effect of construction project with use of the modified PERT schedule.
以改进的PERT网络进度计划为参照,也有利于工程师在工程施工中灵活地进行进度控制,实现最大效益。
-
This system dynamically manages the construction information of progress, resources, cost etc., manages and analyzes visually the engineering construction layout, and makes it easy and direct to see the constr...
系统实现了对施工项目中的进度、资源、成本等信息的动态管理,工程施工场地布置可视化管理与分析以及施工进度的形象直观展示。
- 推荐网络例句
-
The concept of equivalent rotationally rigidity is offered and the formula of rotationally rigidity is obtained.
主要做了如下几个方面的工作:对伸臂位于顶部的单层框架—筒体模型进行分析,提出了等效转动约束的概念和转动约束刚度的表达式。
-
Male cats normally do not need aftercare with the exception of the night after the anesthetic.
男猫通常不需要善后除了晚上的麻醉。
-
Its advantage is that it can be used in smaller units.
其优点在于可以在较小的单位中应用。