This review is planned once in every two or three weeks so the customer can easily steer the development.

这样的评审一般计划2、3个礼拜进行一次,这样客户可以非常容易的了解、掌控开发的进度

As a onlooker , I don't care about the progress of the project.

作为旁观者,我不在意工程进度

In the construction, supervising and urging the contractor to work out the detailed prospectus of construction and quality administration, carry out the material inspection and formulate the flow chart of such administrative operations for public works as stipulating the suspension and check points of construction and carrying out the management of construction progress(3)after the construction,assisting the owners to work out the flow chart of administrative operations for acceptance(4)Fulfilling the quality plan examining operations and working out the windows of construction checking procedures.

研究成果包括:(1)建立施工前,审查承包商提送资料之工务行政作业流程图(2)建立施工中,工程进度管理、材料检验及施工检验停检点查核等工务行政作业流程图(3)施工后,协助业主办理验收之行政作业流程图(4)探讨监造单位於设计阶段之困难点、业主与监造单位权责区分因素及影响监造单位审查期程之因素探讨,并研拟解决方案。

Senior Merchandiser-Refrigerator – Shenzhen Position Description: 1. In charge of order contact and follow up the company's customers order.

职位名称:质检员/ QC职位描述:负责公司出口产品的检验,监督工厂产品质量,及时汇报产品上线进度及产品的质量保证。

But now we have to analyse the schedule and see if we can organise the fixtures properly.

但现在我们要分析的进度,看看是否可以安排适当的固定装置。

In this view, you can find out the number of assignments, and the completion status for each.

在这个视图中,你可以看到有多少任务和每件任务的翻译进度

Pane where you want to create your progress bar, the second and third are the

窗格您要创建自己的进度条,第二和第三是

Before starting, it is important to note that this project, as it was submitted to PEC, was worth 30% of the students grades with the research worksheet worth 10% and the final poster worth 20%.

开始前强调这一点是非常重要的:这份作业将记入你的体育课成绩,将占学年成绩的30%,其中,研究进度报告占10%,制作简报占20%。

There are many the methods of progress control, and the PERT is common one.

进度控制的方法有不少,其中非肯定型网络计划PERT是常见的一种。

In this paper a case of network planning software based on PERT technology in electromechanical project is given.

PERT技术的网络计划软件是基于编制工程进度计划要求而开发的一种新兴的工程管理技术软件。

第22/60页 首页 < ... 18 19 20 21 22 23 24 25 26 ... > 尾页
推荐网络例句

Do you know, i need you to come back

你知道吗,我需要你回来

Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.

1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。

Chapter Three: Type classification of DE structure in Sino-Tibetan languages.

第三章汉藏语&的&字结构的类型划分。