进度
- 与 进度 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This is a progress can enhance the function of a class, he can progress to the various characteristics of the...
这是一个可以增强进度条功能的一个类,他可以对进度条的各个特征进行修改,比如说方向,颜色,是否显示数字等等。
-
This is a progress can enhance the function of a class, he can progress to the various characteristics of the changes, such as the direction, color, whether the numbers.
这是一个可以增强进度条功能的一个类,他可以对进度条的各个特征进行修改,比如说方向,颜色,是否显示数字等等。
-
Doing so will extend the lockout period by the same amount of time as the original lockout i.e.
可将进度扩展与原始进度最大限额相等的时间。
-
Control the quality of clothing production and master production schedule, technical personnel track the progress of supervision, to ensure that the fabric, accessories and apparel design, sewing in full accordance with customer requirements And inform customer of production.
售中服务:控制服装生产的质量和掌握生产进度,我方有专门的技术人员对质量、进度等进行跟踪监督,确保面料、辅料及服装造型,缝制完全按照客户要求,并及时将生产情况告知客户,使客户时刻了解生产情况。
-
Any continuous series of schedule activities connected with Logical Relationship s in a Project Schedule Network Diagram .
在项目进度网络图中,通过逻辑关系连接起来的任何连续的进度活动序列。
-
The collection of schedule activity dependencies that makes up a Project Schedule Network Diagram .
项目进度网络图中各进度活动之间的依赖关系的总称。
-
A calendar of working days or shifts that establishes those dates on which schedule activities are worked and nonworking days that determine those dates on which schedule activities are idle.
规定开展进度活动的工作日或班次和不开展进度活动的非工作日的日历。
-
Considering the characteristics of chain production of Germu Oil Refinery ,taking Catalytic Reformulating and Diesel Hydrogenating Unit as an example, collecting various influential factors, and applying SE basic theory and ISM methods, the paper made a deep analysis to the operation progress influential factors, and found out four crucial factors: the number of people, quality of overhaul, the frequency of doing over again and the factor of environment,.
目前企业在编制进度计划时由于沿用传统的思想方法,缺乏新理论、新方法、新手段的运用,致使计划进度与实际进度背离较大,造成了时间和资源的严重浪费,也影响了企业效益目标的实现。
-
And by then, the windages of the schedule and cost were calculated, the reasons there of were analyzed and measures to correct them were taken in time in order to control the schedule and cost of project.
在项目实施过程中,采用挣值分析法对工程进度进行控制,定期对项目进展情况进行全面核查,计算进度偏差和成本偏差,分析偏差产生的原因并及时采取纠正措施,实现对项目进度和成本两个方面的动态控制。
-
Methods The contents and requirements of the evaluation occupational hazard of project schedule were identified. According to the principle of the Gantt chart, project progress management plan was made for the project schedule management in evaluation of occupational hazard of a project.
明确建设项目职业病危害评价项目活动的内容和进度要求,根据甘特图的原理,以某建设项目职业病危害控制效果评价的项目进度管理为例,绘制出一张项目进度管理工作计划表。
- 推荐网络例句
-
The concept of equivalent rotationally rigidity is offered and the formula of rotationally rigidity is obtained.
主要做了如下几个方面的工作:对伸臂位于顶部的单层框架—筒体模型进行分析,提出了等效转动约束的概念和转动约束刚度的表达式。
-
Male cats normally do not need aftercare with the exception of the night after the anesthetic.
男猫通常不需要善后除了晚上的麻醉。
-
Its advantage is that it can be used in smaller units.
其优点在于可以在较小的单位中应用。