运行
- 与 运行 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This text introduces the principles and functions of three-position disconnecting switch of 31.5 kV GIS in Liuliping substation, analyzes the secondary control mode of the device through the diagrams of logical relation and table of status, points out that the equipment safety operation is affected by incorrect design for adopting false status table and additional 4 illegal control modes to 4 normal control modes on switches.
沈世忠,黄东红摘要:本文介绍了六里坪变电所31.5 kV GIS三工位开关的原理和作用,并对该设备的二次控制方式运用逻辑关系图和状态表进行了分析,指出由于设计中采用了错误的状态表,运行中除了4种正常开关控制方式以外,增加了4种非法控制方式,影响了设备安全运行。
-
The question existed in traditional diving pattern of high-power submersible pump in drainage at mine inclined shaft was analysed,the scheme was introduced,overall design and system architecture of new non-diving apttern,and go on extend thinking.
分析了在矿山斜井追排水工作中大功率潜水电泵的传统潜水运行模式存在的问题,介绍了新型非潜水运行模式的方案、总体设计和系统结构,并进行了拓展思维,对于目前我国大多数煤矿矿山斜井追排水工作具有一定的借鉴意义。
-
Although sound levels at some frequencies increased when the dust remover was working,yet there was no significant difference.
无论吹尘器是否运行均有次声存在,虽然运行时有些频段有所增加但不显著。
-
Through the analysis about the measure data of three-phase, four wires electric meter in the different modes, we can know that whether the electric meter is connected to earth wire or not, the error is different.
本文通过对三相四线有功电能表在不同方式运行中的计量分析,可以知道接入零线与未接零线在运行中出现同样故障时,其计量的误差不同,会造成计算错误。
-
In addition, in order to improve the control system response speed for fire control linking signal and elevator calling signals, interruption technique is applied to process these signals.
根据电梯的运行方式在初始级设计了3个模块:集选、消防和检修。在各个模块下,按照电梯运行动作进一步分级,程序的级与动作相对应。
-
The electric elevator controlling has adopt two kinds way at present commonly, one being to adopt PC to control an element as the signal, accomplish electric elevator signal acquisition , operation state and functional setting up, that the automation controller and collection selections realizing an electric elevator run a function , drag moving is to come to be completed from the frequency transformer under the control of; The selections controlling way second kinds using programming controller to substitute PC realizing signal collection is controlled.
目前电梯的控制普遍采用了两种方式,一是采用微机作为信号控制单元,完成电梯信号的采集、运行状态和功能的设定,实现电梯的自动调度和集选运行功能,拖动控制则由变频器来完成;第二种控制方式用可编程控制器取代微机实现信号集选控制。
-
At present the elevator control generally has selected twomethods, one is uses the microcomputer to take the signal controlunit, completes the elevator signal gathering, the running status andthe function hypothesis, realizes the elevator automatic dispatch andthe collection chooses the movement function, drives the control tocomplete by the frequency changer; The second control modesubstitutes for the microcomputer realization signal collection withthe programmable controller to choose the control.
目前电梯的控制普遍采用了两种方式,一是采用微机作为信号控制单元,完成电梯信号的采集、运行状态和功能的设定,实现电梯的自动调度和集选运行功能,拖动控制则由变频器来完成;第二种控制方式用可编程控制器取代微机实现信号集选控制。
-
Effects of energy storage on the operation of cogeneration system areexamined through a numerical study on a gas engine-driven cogenerationsystem installed in a hotel and office building.
建立了带蓄能装置的热电冷系统的运行模型并给出相应算法,分别以办公楼和旅馆为例,对热电冷联产系统运行方式进行优化。
-
The difference between the national "Code for design of metro"(GB50157-2003) and the NFPA130 "Standard for Fixed Guide-way Transit and Passenger Rail Systems" on calculation method for person evacuation time in the metro station fire is compared.
针对地铁车站火灾人员疏散时间计算方法的问题,比较研究国内现行《地铁设计规范》(GB50157-2003)和美国专门针对有轨交通系统的NFPA130标准的异同,其结果说明:国内设计规范关于人员疏散时间的计算方法存在不足;对区间隧道内列车着火的情况进行分析讨论,指出对列车在区间隧道内着火,且还能继续运行的情况,着火列车的运行速度对火势的发展以及人员疏散时间的影响是不可忽视的。
-
Inclusive bases answer in fee crossing a net was being discussed in article, 2 when transmission network moves and invest namely reclaim cost, network block and optimize attempered 2 opportunities cost, and move to reserve and send electric control automatically (cost of 2 of AGC) auxiliary services, these 2 auxiliary services are to trade the center buys what generate electricity from library affiliation and offer through transmit electricity net.
文中论述了过网费中应包括的 6项主要成分,即输电线路运行和投资的 2项回收成本,网络阻塞和优化调度的 2项机会成本,以及运行备用和自动发电控制的 2项辅助服务成本,这 2项辅助服务都是交易中心购自库联营发电并通过输电网提供的。
- 推荐网络例句
-
And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.
同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。
-
Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.
运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。
-
If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.
如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。