载台
- 与 载台 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The measurement is simulated by ""regular icosahedron "" method, utilizing the direct current moment electric motor and the photoelectrical axis angle encoder, the rotation of the shot carrier and the CCD camera is completed, and can orientation the rotating angle, so that the system can make the CCD camera to measure the square diagraph in 16 independent projections.
该系统的研制是利用"正二十面体"方法进行模拟,直流力矩电动机和光电轴角编码器配合使用,完成载物台和CCD相机的旋转运动和角度定位,使CCD相机能够实现对十六个独立方向上的投影测量。
-
The socket in java was used to achieve the connecting of computers in Computing environment at discretion . Computing assignment has been accomplished. The self-defining classLoader in java actualize the interface of biology algorithm.
使用java中的套接字实现了任意多台计算机加入计算环境,并取得计算任务,运用java中自定义的类加载器实现了挂接生物算法的接口。
-
The edge character of the reference surface is obtained by machine vision method and the coordinates of tangency points on the horizontal and vertical direction are found.
采用环形参考物面,提出一种基于数字图像处理的方法调节光轴与载物台的垂直性,避免额外的光学器件和机械装置。
-
Dimensions and positions of holes for stage clips and attachable mechanical stage on microscope stage
显微镜。载物台装压簧和移动尺用孔的尺寸和位置
-
You can simply start Keryx from any Internet machine, load the default project that fits your offline Ubuntu installation (karmic 32bit, karmic 64bit, etc), and you're ready to begin downloading software.
你可以很容易地在任何一台连接互联网的机器上启动Keryx,加载那些适合于你的离线Ubuntu系统(Karmic 32bit,Karmic 64bit等)的默认工程,然后开始软件下载。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
As for the WTC, I would say bigger is better than smaller in this case, as decreasing the size of the ballast tank on a 3.5 should be easy enough to do.
对于世台会,我会说,大总比小在这种情况下,作为降低大小的压载水舱上3.5应该很容易做的不够。
-
The aft ballast tank sits just forward of the aft battery in between the WTC's.
该尾部压载水舱坐在刚才提出的尾部的电池之间的世台会的。
-
I have designed a 'Modular WTC' made up of 3 distinct interchangeable sections:- battery, ballast tank and motor sections.
我曾设计了一个模块化世台会'成立的三鲜明的可互换的部分:-电池,压载舱和机动部分。
-
The hardware design of the belt-driven experiment instrument.
2.2.3带传动实验台加载功能电路设计。
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。