英语人>网络例句>距 相关的搜索结果
网络例句

与 距 相关的网络例句 [注:此内容来源于网络,仅供参考]

Every indicatrion has statistics difference after six mouthstreatment of Two rattan mixture which include body function, activity index number of pathogenetic condition, total swelling arthrosis, total self-assessment, rachialgia, rachiodynia rhachitis, activity of thoracic skeleton, schober, distance between fingers and ground, left flection of antisternum, right flection of antisternum, antisternum hypsokinesis, distance between head and wall, ESR, C reactive protein: every indicatrion has statistics difference after the treatment of Sulfasalazine except the indicatrion of distance between head and wall.

二藤合剂组治疗6个月后其各项观察指标(包括躯体功能、病情活动指数、肿胀关节总数、总体自我评价、脊柱痛、脊柱炎症,胸廓活动度、Schober、指地、脊椎左屈、脊椎右屈、脊椎后仰、枕墙、血沉、C反应蛋白)与治疗前相比,均有统计学差异(P<0.05);柳氮磺吡啶组除枕墙外,其余观察指标亦均有统计学差异(P<0.05)。

Using numerical simulation, 102 schemes were designed and calculated in rhomboidal and rectangular well patterns. A theoretical plate of reasonable ratio of space between wells and rows in different well patterns were studied, and different anisotropy degree formations of low permeability reservoirs we...

通过 10 2种方案的设计,在相应的地质模型基础上,运用数值模拟方法,对合理井排比进行了研究,得到确定低渗透油藏合理井排比理论图版,利用图版可以确定对低渗透油田不同各向异性程度下合理井排比,低渗透油藏的经济有效地开发具有重要的理论意义和实用价值。

The company is located in "the magne sium capital of china"-Dashiqiao city.liaoning province,covering a land of 40000 square meters.building area 24000 square meters,which including workshop and wareh ouse area 21900 square meters,office building,teseing building 2100 square meters,The company are away from Shenda highway 1 kilometers,from Dashiqiao train station 2 kilometers,from the Bayuquan port 50 kilometers with a good tran sport condition,the advan tageous geographical position has provided the broad developments pace for the company.

企业位于&中国镁都&—辽宁省大石桥市官屯镇,厂区占地面积4万平方米,建筑面积2.4万平方米,其中厂房、库房面积2.19万平方米,行政办公楼、监测化验楼面积2100平方米。工厂沈大高速公路1公里,大石桥市火车站2公里,鲅鱼圈港50公里,交通运输十分方便。

The company is located in "the magne sium capital of china"-Dashiqiao city.liaoning province,covering a land of 40000 square meters.building area 24000 square meters,which including workshop and wareh ouse area 21900 square meters,office building,teseing building 2100 square meters,The company are away from Shenda highway 1 kilometers,from Dashiqiao train station 2 kilometers,from the Bayuquan port 50 kilometers with a good tran sport condition,the advan tageous geographical position has provided the broad developments pace for the company.

企业位于&中国镁都&—辽甯省大石桥市官屯镇,厂区占地面积4万平方米,建筑面积2.4万平方米,其中厂房、库房面积2.19万平方米,行政办公楼、监测化验楼面积2100平方米。工厂沈大高速公路1公里,大石桥市火车站2公里,鲅鱼圈港50公里,交通运输十分方便。

It is 18 kilometers from Leshan Giant Buddha, 50 kilometers from Emei Mountain and 9 kilometers from the Spinulose Gorge.

小西湖&景区位于五通桥中心城区,北乐山大佛 18公里,峨眉山 50公里,西桫椤峡谷景区9公里。&

The distance from accessory nerve to the great auricular nerve was about 1.24±0.51cm, to clavicular midpoint 10.72±1.67cm, and 12.46±1.19cm to sternoclavicular joint after leaving the posterior edge of sternocleidomastoid muscle.

副神经在胸锁乳突肌后缘穿出点耳大神经在胸锁乳突肌后缘穿出点上方(l.24±0.51)cm,锁骨中点(10.72±1.67)cm,胸锁关节(12.46±1.19)cm。

When planting trees, from building should be in 5 meters, from underground pipe 2 meters away from buildings, shrubs and underground pipeline 1 meter ~ 1.5 meters.

栽植时,乔木建筑物应在5米左右,地下管网2米左右,灌木建筑物和地下管网1米~1.5米。

All in all, we had made good progress for day 2 -- 25 of 34 pitches, with only 9 to go for day 3. Nonetheless, day 2 was the hardest. We flailed on the traverse. We waited a lot for parties ahead of us. And we had the embarrassment of asking for a rope to be thrown down to us on the 25th pitch. We were really looking forward to topping out the next day.

总而言之,我们两天共爬了二十五个绳,第三天只剩下九个绳了,尽管如此,第二天是最难的,我们在横渡时很惨,等待前面的队伍,还在第二十五绳还很不好意思的叫人家丢绳子下来,我们真的想在明天就登顶下山。

The anchor anchoring depths could be regard as critical value for concrete edge failure and anchor failure. When the anchor edge distance was shorter than anchor anchoring depth, the failure mode was concrete edge failure and anchor space length had some influence on cracking load. When anchor space length was longer than anchor anchoring depth, the failure mode was anchor failure.

锚栓的锚固深度可以认为是混凝土边缘破坏以及锚栓破坏的临界边,对于锚栓边较小的情况,以混凝土边缘破坏时的承载力为标准,锚栓间对于试验的开裂荷载有影响;对于锚栓边较大的情况,以锚栓的破坏为标准。

Quality of sliver forming is tested using Uster AFIS single fiber testing system under different integrated conditions for the rear hood of the card A186F equipped with back teeth guided flat with cotton web cleaner for the 3-step gauges and cotton web cleaner for 4-step wind throughput. Test shows that gauge excess small or excess large will result in poor quality of sliver forming.

为了研究棉网清洁器反齿导向盖板隔大小和风量大小组合对生条质量的影响,采用Uster AFIS单纤维测试系统,对A186F梳棉机后罩板采用棉网清洁器的3档反齿导向盖板隔和4档棉网清洁器风量,在不同组合条件下生产的生条质量进行了检测,检测结果显示,过大与过小的反齿导向盖板隔对生条质量均有不利影响。

第8/100页 首页 < ... 4 5 6 7 8 9 10 11 12 ... > 尾页
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。