货物
- 与 货物 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Inspection of imported and exported goods is the customs declaration in the declaration and audit certificate on the basis of actual import and export goods inspection proofing.
进出口货物查验是指海关在接受申报并审核报关单证的基础上对进出口货物进行实际校对检查。
-
Based on the RFID technology's air materials management system management system, through the RFID technology, the computer information technology, the networking and so on many technologies, builds the air materials company unified information platform, can realize the Airline various Functional departments's information sharing, the service conformity; Through the RFID technology, the monitoring technology, the entrance guard technology, realize to the air materials warehouse personnel and the cargo digitized management, comes in and goes out the management including the personnel, the cargo leaves the warehousing management, the automatic audit treasury or ware house, the storehouse position automatic assignment, the visualization warehousing management, consumes the material fine refinement management, when the long-lived management, the application course track; Realizes reasonably to the air materials, scientific, the highly effective management function, and had guaranteed the air materials manages each link information acquisition the speed and the accuracy, guaranteed that the Airline grasps the air material inventory accurately promptly the real data, maintains with reasonably the control air material inventory situation.
基于RFID技术的航材管理系统,通过RFID技术、计算机信息技术、网络技术等多项技术,建立航材公司统一的信息平台,能够实现航空公司各职能部门的信息共享,业务整合;通过RFID技术、监控技术、门禁技术,实现对航材仓库人员及货物的数字化管理,包括人员出入管理,货物出入库管理、自动盘库、库位自动分配、可视化仓储管理、耗材精细化管理、时寿件管理、应用历程跟踪;实现对航材合理、科学、高效的管理功能,并且保证了航材管理各个环节信息采集的速度和准确性,确保航空公司及时准确地掌握航材库存的真实数据,合理保持和控制航材库存情况。
-
Where goods other than bale d hay are to be fumigated in a chamber or container, the minimum head space must be 100 mm and a load mark should be applied to the walls to ensure that this head space can be achieved.
对于成捆干草以外的货物,如果在熏蒸室或集装箱内处理时,要求货物离熏蒸室的顶部有100毫米的距离,并在这100毫米处设置一个标志,以确保以后装货都以此为限。
-
Kunshan is located in Poplar Branch Bay Logistics Center Hospital, the main operations are as follows: First, from the less-than-truckload throughout Guangdong, vehicle cargo transport operations, with the City Star in Guangdong Province over the business outlets, this route has become our company Gold Line, for the various enterprises in Guangdong Province sent to less-than-truckload of goods to reduce the operating costs.
昆山分公司就位于白杨湾物流中心院内,主要经营业务有:一、往返广东全境的零担、整车货物运输业务,凭着城市之星在广东省营业网点的遍及,这条线路已成为我公司黄金线,为各企业发往广东省的零担货物降低了运营成本。
-
When you need to send cargo to a buyer overseas according to a sales contract, you must, after you have completed the necessary documentation for insurance, cargo survey, etc. as per the clauses in the Letter of Credit, book space on a ship either by yourself or via a freight forwarder.
当你需要向对方发送货物,买方按照销售合同的海外,你必须后,你已完成必要的文件为保险、货物调查等条款在信用证上的空间,本书可以通过自己的船或货运。
-
Then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
承包人在运送货物前应通知工程师或其代表有关货物的重量及其他特殊事项,还要告知他打算采取的保护,加固方法。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .
如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力