英语人>网络例句>调查地质 相关的搜索结果
网络例句

调查地质

与 调查地质 相关的网络例句 [注:此内容来源于网络,仅供参考]

Engineering geological environment evaluation relation to naturalism, economy, environment, engineering etc and various factors have variant influence degree. Presently, most of cities in China use method of qualitative analysis in engineering geological environment evaluation and this method has many shortcomings, such as need great investigation workload, difficultly unified standards, lowly spatialization accuracy, quantitative study is not easy and with great subjectivity in city planning.

城市工程地质环境评价涉及到自然、经济、环境、工程等多方面,且各因素对评价目标的影响程度也不同,而目前我国大部分城市在进行工程地质环境评价时多采用定性分析的方法,这种方法的调查工作量大,标准较难统一,空间定位精度较差,不易进行定量研究,使城市规划工作带有较大的主观性。

Based on the field deposit-geological investigations, structural analysis and petrochemistry studies, this paper presents a Miocene intraplate thermo-upwelling extensional metallogenic model of the Zhunuo porphyry copper deposit which is tectonically controlled by the nearly east-west and north-south extensive faults related to lower crustal flow. The ore-bearing porphyries have the characteristics of typical adakitic rock.

野外基础地质和矿床地质调查、构造分析和岩石化学的研究表明,朱诺斑岩铜矿床在构造上受近EW向和近SN向伸展断裂控制,时间上属于中新世青藏高原南部板内构造过程,含矿斑岩具有典型的埃达克质岩特征。

Tunneling engineering ; fault ; crush zone ; geological survey ; deformation measurement ; geology prediction ; information construction

隧道工程;断层;破碎带;地质调查;变形量测;超前地质预报;信息化施工

This paper expounds the geology disasters of the strip mine,and investigation for the flood control and drainage management in the mine district and surrounding area,the city flood control plan and geology disaster control plan and executing,and compares their reason formed and rainfall inducement and watercourse transmission flood,and put forward the existing issues.

本论文对西露天矿地质灾害情况,矿区防、排水及矿区周边河道防汛安全情况进行了调查,同时考察了城市防洪预案和地质灾害预案的编制及执行情况。

Fujian Geology Mining Group Co., Ltd is affiliated with Fujian Mining Association, with the status of an independent legal entity.

目前,福建地质矿业集团有限公司在青海开展16000㎞2矿产调查,完成了1:50000的地质普查工作,可申请探矿权40个。

Here I reported new structural data to answer above question, including field section observations and geologic map with large scale in a key area, accompanying with detail microstructural observations, quartz C-axial fabric analyses, and tectono-thermogeochronology (40Ar/39Ar and zircon SHRIMP U-Pb method). Taking available previous data into account, following progression is achieved:1. Completely rebuilding the post late-Paleozoic deformation history of the Harlik MountainFive stages of deformation were identified:(1)pre-Permian compression deformation which may have resulted from pre-Permian subduction;(2) earlier Permian post-collision extension;(3) middle Permian west-east directed dextral slip shearing;(4) later Permian nearly N-S compression deformation; and (5) later Cenozoic intra-plate N-S compressional deformation.

本文选择新疆东部哈尔里克山为研究对象,通过详细的野外路线地质构造调查和关键地区大比例尺地质填图,以及室内显微结构观察、石英岩组分析和构造热年代学(Ar-Ar和锆石SHRIMP U-Pb定年)研究,结合前人研究成果,取得了如下新进展:1、系统重建了哈尔里克山晚古生代以来的变形历史识别和确定了该区板块俯冲碰撞阶段的二叠纪以前挤压变形,后碰撞阶段早二叠世伸展变形、中二叠世近东西向右行走滑变形和晚二叠世近南北向挤压变形,以及板内演化阶段的晚新生代南北向挤压变形等5期构造变形事件。

However, the mathematical study of the geology of this area is still lacking. On the basis of geological field survey, we have made systematic sampling and geochemical analyses of the rocks, and systematically studied the relationship between the Cu-Ni variable and the rock-forming element variables by the method of multi-variate...

文中在系统的野外地质调查基础上,进行了系统采样和岩石地球化学分析,应用多元线性回归和逐步回归分析相结合的方法,借助SPSS数学统计软件系统的研究Cu-Ni变量与造岩元素变量的关系,建立Cu-Ni变量与其他变量的回归方程,验证与解释白石泉Cu-Ni硫化物矿床的成因、岩浆来源等问题,对指导找矿勘探有重要作用,对应用数学地质方法有指引作用。

This U.S. Geological Survey map depicts earthquake risk in the continental United States.

这幅美国地质调查图显示了在美国大陆发生地质的危险因素。

These stations, located throughout the world, are maintained by the U.S. Geological Survey, State geological surveys, universities, research institutions, and foreign governments.

这些监测站,分布在全国各地的世界,是由美国地质调查局,国家地质调查,大学,研究机构,以及外国政府。

These stations, located throughout the world, are maintained by the U.S. Geological Survey, State geological surveys, universities, research institutions, and foreign governments.

这些分布在世界各地的地震监测站由美国地质调查局,国家地质调查,大学,研究机构,以及国外政府负责维护。

第6/17页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。