英语人>网络例句>评定的 相关的搜索结果
网络例句

评定的

与 评定的 相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper discussed the application of computer vision technology in evaluation of carcass classification and chilled meat quality, which includes marbling distribution and meat color .

本论文初步探讨了计算机视觉技术在胴体分级、肉质评定两方面的应用研究,其中肉质评定涉及肉中大理石花纹分布和肉色评定两个方面。

All patients were assessed with tendon total active motion, Minnesota manual dexterity and Purdue pegboard assessment systems, at the end of 1st、 2nd and 3rd month post hand injury respectively. Result: The function improvement in treated group was better than that in control group.

对于每例患者在发病后1、2、3个月时分别进行手关节总主动活动度评定、明尼苏达手灵巧度评定、普渡手精细运动评定系统进行手功能的评价。

Methods One hundred and fifty-six children with confirmed ADHD were rated with Swanson, Nolan, and Pelham, Version ⅣScale before treatment, then methylphenidate extended-release tablets were orally administered 18 mg once daily for 1 month, and children were rated again by means of SNAP-Ⅳ Scale and detailed function improvement questionnaire.

156例确诊为ADHD的患儿,治疗前完成SNAP-Ⅳ量表评定;随后给予盐酸哌甲酯控释剂18 mg口服,1次/d,连续1个月;治疗后进行SNAP-Ⅳ量表的二次评定,同时完成细化功能改善问卷评定。

Then the working principle of Falling Weight Deflectometer and Dynamic Cone Penetrometer as well as both advantages and disadvantages are introduced respectively.

提出了现行路基承载力评定方法存在的问题,通过介绍落锤式弯沉仪和动态圆锥贯入仪使用原理及各自优缺点,运用FWD和DCP结合工程实例对路基承载能力进行对比评定分析,得出了两者评定路基承载能力的可靠性和相关性。

By study of the statistic characteristics of flood forecasting errors and their confidence intervals for Nushi watershed at Sanhuajian of the Yellow River and on the basis of a comparison of the precision criterion currently used for flood forecasting with the result of the error confidence interval method, it is concluded that the error of flood forecasting is of the characteristic of skew probability distribution, and that the evaluated results of forecasting errors are different by the above two methods.

因此,本文在三花间伊河卢氏流域洪水预报的基础上研究了误差置信限及误差置信限评定方法,并将误差置信限评定结果与现行水情预报精度标准[1]评定结果进行了比较。1 现行洪水预报评定方法流域洪水预报精度评定内容包括洪峰流量、峰现时间和洪量等。洪水预报误差指标有绝对误差、相对误差和确定性系数3种。预报误差小于许可误差时为合格预报。

The 352 valid samples were analyzed by SPSS. The results showed there was no distinct corresponding relationship between the product attributes and reaction time. The different key attributes from questionnaire importance rating and the shortest reaction time standards were used to regressively analyze the results of customers' overall rating (such as overall satisfaction,objective quality, recommend intention).The results indicated that the coefficiency of regression of the special attributes chosen from reaction time to overall rating was distinct, while the coefficiency of the special attributes chosen from importance rating to overall rating was not. The main conclusions are: 1. Regarded attributes can be obtained by the reaction time of brand performance rating.

本实验的有效样本为352个,通过SPSS软件进行分析统计,数据统计结果显示,在品牌表现评价反应时与其重要性问卷评定结果的相关系数的检验中,并未发现品牌表现评价反应时与品牌属性重要性评定结果之间的显著相关;将由问卷重要性评价最高标准所得到的关键属性与通过品牌表现评价反应时最短的标准所选取的关键属性的品牌表现分别对消费者的总体评价结果(如&总体满意度&、&主观质量&、&推荐意向&)进行回归分析,发现通过品牌表现评价反应时方法选取的特殊关键属性(与问卷重要性评定法选取不一致的关键属性)的品牌表现对总体评价结果的回归系数显著,而重要性评定问卷法选取的特殊关键属性(与品牌表现评价反应时法选取的不一致的关键属性)的品牌表现对总体评价结果回归系数不显著。

This method is about which bridge engineering quality is integrally evaluated by using the fuzzing mathematical, hi the course of fuzzy integrated evaluation, firstly, the specialists weight coefficient is defined and the score of qualitative indexing is calculated. Moreover according to the practical situation for project, the specialists present the weight coefficient for subdivisional project and partitioned project.

在建立模糊综合评定模型的过程中,首先确定专家的权重,计算定性指标的得分;再由专家根据工程实际情况给出分项、分部工程的权重,根据分项工程的评分,计算其隶属于评定等级的隶属度;最后由模糊数学模型对桥梁工程质量进行模糊二级综合评定,得出最终的评定结果。

For the nobler plants are valued for the fruit they bear at last in the air and light, far from the ground, and are not treated like the humbler esculents, which, though they may be biennials, are cultivated only till they have perfected their root, and often cut down at top for this purpose, so that most would not know them in their flowering season.

因为那些更高贵的植物的价值是由远离地面的、最后在空气和日光中结成的果实来评定的,而不是像对待那低卑蔬菜的那样。蔬菜就算是两年生的植物,那也只是被培植到生好根以后,而且常被摘去顶枝,使得许多人在开花的季节都认不得它们。

On the basis of wide investigation and research on oil derricks, combined with the practical use of oil derricks on the spot, a comprehensive statement is made in this paper about the basic conditions, the structural features and its practical uses of oil derricks on the spot, a comprehensive statement is made in this paper about the basic conditions, the structural features of oil derricks and its practical use.

本文的主要内容可以归纳为:(1)、本文在对石油井架进行广泛调研的基础上,结合石油井架在现场使用的实际,对石油井架的基本情况、石油井架的结构特点以及石油井架在油田生产中使用的实际进行了综合的论述。提出了有关石油井架承载能力评定的理论和实际的方法。

Such is a parent, concern the future of kid, the affirmation will not ignore a score;Is a school, entering higher school the rate is the main standard which measures school quality, is draw on parents to choose a school to mainly sell a point for the kid;To teacher, own labor can receive real results, also with the student's result main still score to assess of, the high and low pass of score teaching quality of high and low.

如此以来作为家长,关心孩子的未来,肯定不会漠视分数;作为学校,升学率是衡量学校质量的主要准绳,是吸引家长们为孩子择校的主要卖点;对老师来说,自己的劳动能否收到实效,也是以学生的成绩主要还是分数来评定的,分数的高低关乎教学质量的高低。

第10/100页 首页 < ... 6 7 8 9 10 11 12 13 14 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?