英语人>网络例句>计算时间 相关的搜索结果
网络例句

计算时间

与 计算时间 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on the definition of desertification from the United Nations Convention to Combat Desertification,the potential extent of desertification in China was revised by employing Thornthweite's and Penman's formulae to calculate humidity index using the records of 671 meteorological stations from 1950 to 1990,and the biogeographical features of the climate types were clarified.

为了客观反映中国荒漠化发生区域,按照联合国防治荒漠化《公约》的定义,利用1950—1990年间全国671个气象站的长时间序列气象数据,分别采用Thornthwaite和Penman计算可能蒸散量的方法计算了湿润指数的分布,然后根据中国气候区划和中国植被区划以及中国荒漠化发生的特点等对计算结果进行了调整,对中国荒漠化潜在发生范围进行了修订,明确了荒漠化各气候类型区的地理涵义。

In order to assort with antinomy of computation cost and computation precision in ordinary Monte Carlo methods,multi-Monte Carlo method is promoted to simulate general dynamics equation for deposition of polydisperse particles.

为了解决普通Monte Carlo算法计算精度和计算代价无法协调的矛盾,发展了一种新的多重Monte Carlo算法求解考虑多分散性颗粒沉积的通用动力学方程,该算法引入加权虚拟颗粒的概念,基于时间驱动MonteCarlo技术,模拟过程中保持虚拟颗粒数目和计算区域体积不变。

At first, this algorithm obtains rough similar series by clustering the broad moving average; Second, based on this, we can construct the similarity degree of time series trend, by using this similarity degree of time series trend, the users can do riddling secondly. At last, through calculating the distance of the residual time series, accurate similar time series are reached.

该方法首先利用对时间序列广义移动均值的聚类进行相似搜索的粗匹配;然后通过构造时间序列趋势的相似度,利用用户对趋势相似度的要求可以进行第二次筛选;最后对剩余的时间序列进行距离计算,就可以获得最终符合用户需求的相似时间序列。

Because EDF algorithm with a unified scheduling periodic and sporadic tasks in real-time is optimal. By analyzing and calculating EDF scheduling process of idle time and the maximum time can be stealed, Put forward a schedulability test of unified scheduling periodic and sporadic tasks with EDF policy.

通过分析和计算EDF算法调度偶发任务所占用的空闲时间和挪用时间,以及调度后对空闲时间和最大可挪用时间的影响,提出一种采用EDF算法统一调度硬实时周期任务和偶发任务时的可调度性充分判定算法。

First, calculates the fast moving average (usually 12 days) and slow moving average (usually 26 days) by exponential calculation method; second, make fast line value minus slow line value to gain the difference of relative distance. In order to make the trend signals more clear and less influence exerted by of excessive price fluctuation, the difference should be smoothly calculated (general elect 9 days) to get average of difference value. Chart the difference and its average in a coordinate with time for horizontal axis and MACD for vertical axis. Then we can apply the identical, contrary or cross signals through observing their direction, relative and absolute positions.

它首先以指数平滑计算法计算出快速移动平均线(一般选12日)慢速移动平均线(一般选26日),再以快速线数值减慢速线数值即得到快慢线相对距离的差离值,为使趋势信号更明显并且不受股价过分波动的影响,对差离值也进行平滑计算(一般选9日),得到差离值的平均值,把差离值和差离平均值画在以时间为横轴,以MACD为纵轴的坐标上,通过观察差离值和差离平均值的方向、绝对位置和相对位置关系,把它们的同向、异向和交叉现象作为买卖信号的提示。

This action of charging the capacitor is shown in the following equation: ADC Clock resistor RSW 式决定的:(1 K ) and RIN for the period S1 is closed; this period is controlled by ACQ_PS setting.

时间。然而这个时间远远大于外部的电阻和电容电路所消耗的时间,同时在计算电阻和电容电路时候的时间常数时,要考虑到外在附加的贴片电容和插针电容,对ACQ_PS 是一个非常高的值,而系统需要低采样频率。

What's apparently effed, as speculation goes, is when the internal GMT-tracking rolls over to 3/1. It's either not rolling, or rolling to 2/29, at which point a system tries to add/subtract from 2/29, which it can't do because the front-end calendar doesn't have a 2/29/2010, and shit explodes. Seemed to happen around 4PM PDT, which I think is 12AM GMT, so.

目前PS3的问题是,当GMT时间到3/1/2010 0AM GMT的时候,PS3内部时钟不能到达3/1/2010或者2/29/2010因为不能到3/1/2010,所以PS3就在往死里寻找2/29/2010,但是内藏的日历表自然是么2/29/2010的所以始终就爆发了……时间就回到了12/31/1999仔细调查出错的时间就是在3/1/2010 0AM GMT(其它区域时间请自己计算

What's apparently effed, as speculation goes, is when the internal GMT-tracking rolls over to 3/1. It's either not rolling, or rolling to 2/29, at which point a system tries to add/subtract from 2/29, which it can't do because the front-end calendar doesn't have a 2/29/2010, and **** explodes. Seemed to happen around 4PM PDT, which I think is 12AM GMT, so.

目前PS3的问题是,当GMT时间到3/1/2010 0AM GMT的时候,PS3内部时钟不能到达3/1/2010或者2/29/2010因为不能到3/1/2010,所以PS3就在往死里寻找2/29/2010,但是内藏的日历表自然是么2/29/2010的所以始终就爆发了……时间就回到了12/31/1999仔细调查出错的时间就是在3/1/2010 0AM GMT(其它区域时间请自己计算

The surface on the steel bridge is easy to damage early than estimate years.The distress types in steel bridge surfacings include permanent deformation,cracking,formation of mounds and disintegration.The text analyses the vertical section strain under tire location by use of the finite element method and calculates the influence of stiffness variance of translate bonding layer on the surfacings of steel bridges.

中文摘要:钢桥面沥青铺装层在使用一段时间后容易出现开裂、脱层以及车辙等早期破坏现象,采用空间有限元分析方法对车轮荷载位置处的截面竖向应变进行分析,计算了过渡粘结层刚度变化时对钢桥面铺装层受力变化的影响,计算结果说明对传统的弹性层状计算理论的假定与实际受力情况存在较大差异。

Main program have a two-calculation process N = 36 Fibonacci sequence, and then statistical process to the ac...

一个主程序产生两个子进程计算N=36的Fibonacci数列,然后统计进程各自的实际时间,CPU时间,用户时间和内核时间。

第30/100页 首页 < ... 26 27 28 29 30 31 32 33 34 ... > 尾页
推荐网络例句

In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.

。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。

Go down on one's knees;kneel down

屈膝跪下。。。下跪祈祷

Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.

Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。