计算
- 与 计算 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Through field measurement for the contact pressure of box foundation with Ⅰ shaped plane of a high rise building on cobble subsoil, the distribution law of the contact pressure has been diagrammed. At the same time, the contact pressure has been calculated with finite compression layer model, which is well accordant with the measured result. The relative error of average value for the measured to the calculated contact pressure is 6.9%. This shows that the numerical calculation is right.
通过对西南交通大学某教学楼箱形基础基底反力的实测结果,得出了&Ⅰ&形平面箱基置于密实卵石层上的基底反力分布规律,又用有限压缩层地基模型对该箱基反力进行了计算,结果表明:实测反力与计算反力分布规律一致,实测反力平均值与计算反力平均值相对误差为6.9%,也说明此法计算箱基反力是可行的。
-
On the base of theory studying, aim at power flow calculation, the paper firstly develops a component library of transmiting and transforming electricity and a component of power flow calculation using CORBA, designs a visual flow calculation simulation software which finish the mostly work of modeling and simulation by calling for encapsuled components.
在理论研究的基础上,针对电力系统中最基本的计算——潮流计算,本文首先利用CORBA技术开发了输变电系统构件库和潮流计算算法构件库,然后开发了一个可视化的潮流计算仿真软件。
-
Furthermore, the present model is employed to compute the wave field in the inner area of the deepwater channel jetties in the Yangtze River Estuary. Results demonstrate that the present model, which takes into account energy dissipation and the partial reflection of waves, can be used in the relatively large harbor basin, not only simple and convenient to conduct but also provides enough accuracy to satisfy the demand of engineering design.
同时从对长江口深水航道一期工程导堤内侧水域波浪场的计算结果看,本文的计算方法能够应用于较大范围的港内水域的波浪数值计算,并考虑了底摩阻耗散和边界不完全反射的影响,计算简便,精度满足工程应用要求。
-
We integrate the problems of deduction of intersecting grooves and bases in the constructional engineering into the problem calculating the intersecting body volume of irregular polyhedrons, and put forward the stepwise decomposition algorithm of the intersecting body volume of irregular polyhedrons based on computer graphics.
在建筑工程量计算中,被称为扣减量的计算问题,是工程量计算中的难点,如电力工程中非标准的构架、梁柱、沟道、基础等两相交构件的重叠部分体积计算川。
-
When start, this algorithm first prognosticated the capability of the potential available resource nodes, then analyzed some factors such as network qualities or response times to acquire a set of optimal compute resources.
分配计算资源时,首先预测潜在可用节点的计算质量,然后根据云计算环境的特点,通过分析诸如带宽占用、线路质量和响应时间等因素对分配的影响,利用蚁群优化算法得到一组最优的计算资源。
-
According to the experiment results together with the existed strength equation of FRP tubesconfined concrete,the strength model of the GFRP tubed short reinforced concrete columnsand the ultimate beating capacity of the composite short columns are proposed.
根据试验结果及现有FRP管约束混凝土强度计算公式,提出了GFRP套管约束钢筋混凝土轴压强度的计算公式与组合短柱承载力计算公式,计算结果与试验结果吻合良好。
-
Through the comparative analysis of the earth pressure calculated by the different calculation methods, it is known that when the earth pressure behind the abutment of the integral abutment bridge under the action of rising temperatures is calculated, it is not proper to use the m method to calculate the resistance coefficients of the abutment back wall and column earth while the resistance coefficient of the abutment back wall earth can be calculated by the Broms method. It is proper that the resistance coefficients of the earth of the abutment and pier piles should be considered by the p-y curve.
通过对不同方法计算的台后土压力的对比分析,得知:在计算升温引起的整体式桥台桥梁台后土压力时,桥台背墙及台柱土的水平抗力系数计算采用m法是不适合的;桥台背墙后填土的水平抗力系数可采用Broms法计算;土对台桩及墩桩侧的水平抗力系数按p-y曲线来考虑是适合的。
-
Question: In 19th century people who used the bathing machine usually did the following things.
具体的计算题可以是对年代的计算、月份的计算或比例的计算等。
-
First, the computation theory of the anti-sliding pile has been researched including interaction between the pile and tho landslide, the mechanical model of the pile and the calculation method of the internal force of the pile with prestressed anchor cable. Second, the internal force status, the mechanical computation model and the design method of the foundation beam with prestressed anchor cable have been analyzed. Finally, by the example, engineering instance and the geology mechanical model test, the main results and conclusions deduced from the thesis have been compared and validated.
论文首先对抗滑桩的相关设计计算理论进行了研究,包括抗滑桩与边坡岩土体的相互作用,抗滑桩的力学计算模型以及预应力锚索抗滑桩的内力计算方法;其次对预应力锚索地梁的受力状态、计算模型以及设计方法进行了分析研究:最后结合工程实例和地质力学模型试验对相关结论进行了分析比较、验证。
-
Drainage system Design of drainage system is it discharge way drain off water the sureness of the system to include; Calculation of the flow of second of design of the sanitary sewage drainage pipeline of the building ; Is it in charge of sideways to drain off water , water conservancy in charge ofed to set up calculate and in charge of pipeline slope , pipe diameter and sureness of elevation sideways, set up calculation to in charge of pipe diameter , is it confirm pipe diameter size and position and sewage waste water design of the inspection shaft after discharging of breather pipe to come from this.
消火栓给水系统消火栓给水系统的设计内容具体包括:根据建筑物性质选择设计参数,包括每支水枪的射流量、消火栓的口径、水枪口径、龙带长度等;消火栓系统计算,具体包括消火栓的布置计算和消防立管和横支管的水力计算;减压孔板的计算;消火栓设施的确定,包括水泵结合起的设置、消防水泵和泵房的要求。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力