英语人>网络例句>装运港 相关的搜索结果
网络例句

装运港

与 装运港 相关的网络例句 [注:此内容来源于网络,仅供参考]

5 For cargo lots over 1,000 M/T each, or any other lots less than 1,000 metric tons but identified by the Buyer, the Seller shall, at least 10 days prior to the date of shipment, inform the Buyer by telex or cable of the following information: the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name, telex and cable address of the carrier.

15.5、一次装运数量超过1,000吨的货载或其它少于1,000吨但买方指明的货载,卖方应在装船日前至少10天用电传或电报通知买方合同号、商品名称、数量、船名、船龄、船籍、船只主要规范、预计装货日、预计到达目的港时间、船公司名称、电传和电报挂号。

Dog paddle:a prone swimm in g stroke in which the arms and legs rema in submerged and each limb paddles in alternation.

进口旧机电产品在启运港装运之前,依据我国国家技术规范的强制性要求

We take the responsibility of chartering a ship.

我们可以负责租船装运。12、装货港是上海港吗?

But the shipment has not reached the port of destination of vessels, after inquiries by the multi-party, the carrier was originally found in a small company, and the ship set sail soon have closed down, the carrying vessel is an old boat, its cargo were missing.

但装运船只一直未到达目的港,后经多方查询,发现承运人原是一家小公司,而且在船舶启航不久已宣告倒闭,承运船舶是一条旧船,船货均告失踪。

LOADING IN CHARGE: CHINESE PORT FOR TRANSPORT TO FELIXSTOWE/ LONDON.

装运:从中国港转往佛列斯敦或伦敦。

For the first shipment loaded in 2008, the buyer shall open an irrevocable, transferable, documentary letter of credit at sight, quantity 25,000 MT per shipment, that is the amount US$,000, issued by prime bank to seller' s nominated bank account, after goods is inspected by SGS for the quality, quantity surveying and goods loading.

2008年月前装运的第一批25,000吨,其货值为US$,000,以不可撤销,可转让的即期跟单信用证,当全部货物到达卸货港,由国际SGS检验合格后支付货款给卖方所指定受益人的帐户。

2We regret our inability to comply with your request for shipping the goods in early Jan.,because the direct steamer sailing for Basrah calls on our port only around the 20th every month.

我们遗憾不能按您的求于一月初装运此货,因为到贵方巴士拉港的直接船每月在20号左右抵达我港。

2We regret our inability to comply with your request for shi ing the goods in early Jan.,because the direct steamer sailing for Basrah calls on our port only around the 20th every month.

我们遗憾不能按您的要求于一月初装运此货,因为到贵方巴士拉港的直接船每月在20号左右抵达我港。

E regret our inability to comply with your request for shipping the goods in early Jan.,because the direct steamer sailing for Basrah calls on our port only around the 20th every month.

O们遗憾不能按您的要求于一月初装运此货,因为到贵方巴士拉港的直接船每月在20号左右抵达WO港。

As the only direct steamer which calls on our port once a month has just departedgoods can only be shipped next month.

由于每一次抵港的直接船已启航,货只能下月装运。

第7/8页 首页 < 1 2 3 4 5 6 7 8 > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。