蓄水的
- 与 蓄水的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The results of water quality monitoring conducted in the period of one year after three-gorge reservoir impoundment up to EL.
三峡水库135 m蓄水后1年来的水质监测结果表明:三峡水库135 m蓄水对库区干流江段未造成明显影响,但对库区部分支流局部区域的水质造成了较为明显的影响。
-
The normal water level of a reservoir is a key parameter for hydropower station operation. A multi-objective decision-making model is developed by grey correlation analysis, which can effectively treat unquantifiable grey evaluating indicators.
水库正常蓄水位是水电站的主要参数之一,用灰色关联分析建立起多目标决策模型,有效处理了不可量化的灰色评价指标,对三峡水库正常蓄水位方案进行了选择。
-
The sluice of the reservoirs may cause the upraise of the underground water in the grottoes'area and influence the protection of the grottoes'cultural relic, also it may influence the entironment and the microclimate of the earth's surface in the area, whereas the bedrock joint and the shatter crack are developed in the area.
鉴于该地区基岩节理和其他形式的破碎发育,水库蓄水有可能是造成窟区地下水位上升的原因,并有可能影响到石雕文物的保护,而且水库蓄水对研究区地表生态环境和小气候也会产生一定的影响。
-
It was shown that the algal species composition and cell densities in the reservoir varied markedly among the three periods. At present, the algal community in mainstream was dominated by Bacillariophyta, and then Chlorophyceae.
数据显示,蓄水前(2003年1月~2003年6月)、蓄水1周年(2003年6月~2004年5月)和蓄水1.5年(2004年6月~2004年12月)3个时间段之间,被调查水域的浮游藻类群落结构、细胞密度和水质状况均存在一定的差异。
-
The research mainly includes:(1) As for some existing problems in simplified graded-evaporation calculation anddescription of catchment impoundage, in the dissertation, taking Dahuofang Runoff Model foran example, the function of membership grade was used to fuzzily describe the evaporationand impoundage. It can solve parameter sensitivity resulted from original graded-evaporationcalculation and get a reasonable evaporation result.
主要研究内容和成果如下:(1)对产流模型中采用分级简化计算蒸发和流域蓄水容量描述存在的问题,以大伙房模型为例,首先利用隶属度函数对蒸发和蓄水容量进行模糊描述,解决了原分级计算导致蒸发参数敏感,蒸发量计算不合理的问题。
-
The amount of acreage supported by the Ogallala in six states fell from its peak in 1978 by nearly 20 percent in less than a decade; despite efforts to limit use of Ogallala water, substantial withdrawals continue.
不到十年,美国六个州內靠奥加拉拉蓄水层维持灌溉的农田英亩数,比1978年的最大值下降了近20%。尽管各州努力限制用量,该蓄水层的储量仍大幅减少。
-
Sabaigrass planting improves the soil water conservation functions. The study results indicated: vegetation influenced the soil water conservationfunctions of the purple sloping fields greatly. Pure and mixed stands of Sabaigrassvegetation not only improved the soil water conservation functions in purple soilsloping fields, but also has the better effect than wild vegetation.
2龙须草种植可明显改良土壤蓄水性能本研究结果表明:植被的存在与否对紫色土荒山坡地土壤蓄水性能影响很大,龙须草纯种植被和龙须草-林木复合种植植被不仅极显著地改良了紫色土荒山坡地土壤蓄水性能,而且其改良效果显著好于野生自然植被。
-
Ahead impounding water of Three Gorges reservoir is an important problem of getting more benefit of Three Gorges Project, but it will inevitablely increase the risk of flood control. It is necessary to put forward an effective scheme to meet the flood control requirement.
三峡水库提前蓄水是充分发挥三峡水库效益的重要课题,而提前蓄水必然会提高三峡大坝的防洪风险,有必要提出一个有效的调度力案解决。
-
If the natural land reclaimed to garden or slope land, the saturation capacity of the top-soil will fall by 31.2%, non-capillary water storage capacity fall by 65.5%, and capillary water storage capacity on slope land fall by 34.3%.
当自然利用土地改为园地、坡耕地以后,其表层土壤的最大蓄水能力下降31.2%、非毛管蓄水能力下降65.5%、坡耕地的毛管蓄水能力下降34.3%。
-
Li Yong'an, Three Gorges Project welcomed in three milestones in 2003, namely water filling of the reservoir, operation of the ship lock and power production of the generating unit; and further in September 2005, the 14 sets of hydro-turbine generating unit (700MW each) of the left-bank powerhouse were all connected on-line for power production; and in May 2006, approximate 10 months ahead of the preliminary design schedule and 2 years ahead of the expectation of the flood control performance, the Three Gorges Dam was completed and fully reached to its designed crest elevation of 185m, able to impound water with the whole structure of dam.
历任清江水电开发公司总经理兼湖北省人民政府副秘书长,中国三峡总公司副总经理。在李永安先生的领导下,长江三峡工程于2003年实现了蓄水、通航和发电三大目标,2005年9月左岸电站14台700MW水轮发电机组全部投产发电,2006年5月三峡主体工程大坝全线到达185米设计坝顶高程,具备全线挡水能力,工期比初步设计工期提前约10个月,提前两年发挥防洪能力。2006年10月,三峡水库蓄水至156米。
- 推荐网络例句
-
As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.
每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。
-
Maybe they'll disappear into a pothole.
也许他们将在壶穴里消失
-
But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.
但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。