英语人>网络例句>肋内的 相关的搜索结果
网络例句

肋内的

与 肋内的 相关的网络例句 [注:此内容来源于网络,仅供参考]

And beyond the Jordan to the east of Jericho, they appointed Bosor, which is upon the plain of the wilderness of the tribe of Ruben, and Ramoth in Galaad of the tribe of Cad, and Gaulon in Basan of the tribe of Manasses.

在约但河东岸,耶里哥东面,在旷野高原里,勒乌本支派内指定了贝责尔;在加得支派内,指定了基肋阿得的辣摩特;在默纳协支派内,指定了巴商的哥蓝。

In accordance with the needs of solving problems, mold experiments carried out are as follows:(1) Testing flexural normal stress, shearing stress and shearing force stagnant effect of molds of organic glass and load's lateral distribution coefficient of beam's ribs;(2) Testing rigid torsion and distortion effect of molds of organic glass;(3) Testing cap plates' vertical and lateral efficient load working breadth of molds of organic glass;(4) Testing lateral frame's bending moment of molds of organic glass within the range of their working breadth;(5) Experiment on respondency of dynamic force of molds of organic glass.

根据解决问题的需要,所作的模型试验有:⑴测试有机玻璃模型的弯曲正应力、剪应力、剪力滞效应和箱梁梁肋荷载横向分布系数;⑵测试有机玻璃模型的刚性扭转和畸变效应;⑶测试有机玻璃模型顶板纵向、横向荷载有效工作宽度;⑷测试有机玻璃模型载荷在工作宽度范围内的横向框架弯矩;⑸有机玻璃模型的动力响应试验。

On the ship center line of the dock, a laser equipment (this laser equipment only can turn in same vertical face)is put on someplace between the Fr –3# and the Fr 7.5#.

在船坞底船体中心线上,-3#肋位与艉轴管后端面所在肋位之间某处放一激光仪(此激光仪只能在同一重垂面内转动),然后分别用激光打-3#肋位及艉轴管后端面两处的钢丝心,确定这两点在船中心面的内,及已确定了整根轴线在同一中心面上。

Methods clinical data of 26 patients were retrospectively analyzed, including 15 with atrial septal defect, 10 with ventricular septal defect and one with mitral value replacement and the middle of the right lung resection. the intersection was at the right midaxillary line and the third rib as the upper margin of incision, and that of the midaxillary line and the sixth rib as the lower margin, going through the third or the fourth intercostal space.

回顾分析了26例经右腋下小切口行心内直视手术的临床资料,切口取右腋中线与第3肋的交点为上缘,腋中线与第6肋的交点为下缘,经第 4或第 3肋间入胸,其中房间隔缺损15例、室间隔缺损10例、二尖瓣置换+右肺中叶切除1例。

The screen at least partially circumscribes the non-perforated section of the base pipe, and the ribs extend longitudinally in an annular space between the screen and the non-perforated section.

筛管至少部分地围绕基管的未穿孔部分,且肋在筛管与未穿孔部分之间的环形空间内纵向延伸。筛管组件的柔性部件卷绕在肋周围并设置在筛管与未穿孔部分之间的环形空间内。

On the project background of Rongzhou Bridge, a half through CFST arch bridge in Yibin crossing Jinshajiang, the optimizing theory is applied to the calculation of the stayed-buckle-cable forces in the process of craning construction of the steel-tube arch segment and construction error adjusting. The calculated optimum cable forces with high precision can guarantee the inner forces and the structuredeformation in safe state, and ensure the line shape of the arch ring in accordance with design requirements as well.

以宜宾金沙江戎州大桥(主跨260m的中承式钢管混凝土拱桥)为工程背景,将优化理论引入到钢管混凝土拱桥拱肋架设和扣索索力调整计算,这样计算出的索力精度较高,既能确保结构的受力状态和变形始终处在安全范围内,又能保证架设和调整后的拱肋线形符合设计期望。

The highest heat transfer coefficient for air flowing in the nine 3-D IFT with staggered arrangement fins is No9 tube. In the turbulent region, the heat transfer coefficient of No9 tube is a factor of 10.36 compared with smooth tube, and its thermodynamic performance coefficient is as high as 6.49; The average Nusselt number in the most superior 3-D IFT with staggered arrangement can be increased by about 1.04 times in the laminar flow, and 6.38 times in the transitional flow as compared with that in the smooth tube. The friction factor between fluid and tube wall can be 0.96 times in laminar flow, and 12.68 times in transitional flow as compared with that inside the smooth tube.

在进行实验的九根肋叉排三维内肋管中,换热最强的No9管与光管相比,在紊流区的换热强化比平均可达10.36倍,阻力增大比约为4.06倍,其热力性能系数高达6.49;在过渡流区的换热强化比平均可达6.38倍,同时阻力增大比约12.68倍;在层流区的换热强化比为1.04倍,而阻力增大比仅约0.96倍。

The nonlinear finite element models are also used to analyze the hysteresis behavior of the joints under reversed cyclic loads using ANSYS 8.0. The influences of the stiffener length and the infilled concrete are analyzed. Analytical results show that the stiffener length and the infilled concrete are critical for the joints. Furthermore, the skeleton curves of the finite element models are in good agreement with those of experiments.

运用ANSYS8.0对各节点试件在低周反复荷载作用下的滞回性能进行非线性模拟计算,分析内填混凝土、加劲肋长度等因素对节点受力性能的影响,结果表明:内填混凝土和加劲肋长度对节点受力性能的影响较大,有限元所得的骨架曲线与实测曲线吻合较好。

Numerical simulation was conducted to investigate the flow field of internal cooling passages with both rib-roughened walls and film hole suctions and discharge coefficients of film holes,with rib angles 45°,60°,90°,120°respectively.

利用有限体积法对三维不可压缩的N-S方程进行离散,对同时带肋和气膜孔出流的内流冷却通道在45°,60°,90°,120°肋的结构下进行了数值模拟。

Multi-ribbed slab structure is composed of multi-ribbed slab wall embedded in the hidden frame, which is a brand new structural system.

密肋壁板结构是由密肋复合墙板内嵌于隐形框架而形成的一种新型结构体系。

第2/6页 首页 < 1 2 3 4 5 6 > 尾页
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。