结单
- 与 结单 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Located in Jingdezhen, Jiangxi Province, Bailu Bridge is a cable-stayed continuous 3-span harp shaped bridge with a single pylon and a single cable plane and without the backstay.
江西省景德镇白鹭大桥主桥系三跨连续独塔单索面无背索竖琴式斜拉桥,钢塔钢箱梁,塔梁墩固结。
-
The results indicate that the effect of anhydrous and un-hydroxyl resin is better than liquid paraffin and each of electrocast zirconia and monocline zirconia can promote sintering of magnesia-calcia brick,and the effect of monocline zirconia is better than that of electracast zirconia.
结果表明:作结合剂用时无水无羟基树脂效果好于液体石蜡;作为添加剂时电熔氧化锆和单斜氧化锆均能显著促进镁钙砖的烧结,其中单斜氧化锆的效果好于电熔氧化锆。
-
The primary studying works and characteristics:1 To summarize reinforcing theory of cement mixing pile composite foundation2 To analyze the primary mechanics characters and changing rules of cement mixing pile, based on analysis of test data both indoor and outdoor.3 To discuss siding frictional resistance, ending resistance, ultimate bearing capacity of simple mixing pile and effectiveness factor of grouped piles, loading ratio of soil between piles under cushion cap of grouped piles and stress ratio of pile and soil and so on, and use many computation method and experimentation method to ensure bearing capacity of mixing piles composite foundation.4 To point out and analyze eight sides flaws and problems of the bearing capacity calculation method of mixing pile compositefoundation which ensured by national and normative method/ formula.5 To apply test results of loading tests and a few settlement observation data, use gray theory to predicate ultimate bearing capacity of deep mixing piles, actual example demonstrate engaging between theoretical predicted value and actual value.6 To apply groovy layerwise summation method to discuss entity piles method, double foundation method, equivalent layerwise summation method and consolidation theoretical method and so on, especially by combination of engineering example, use FEM to calculate or discuss the settlement and changing rules of composite foundation.7 To discuss problems of critical length of composite foundation by combination of engineering example and numerical analysis method, and analyze the contrast of critical length between simple pile load and most area load of composite foundation, not only critical length of composite foundation is relative to modulus ratio between piles and soil, but also upside load distribution area of composite foundation.
主要的研究工作与特色为:(1)总结了水泥搅拌桩复合地基的加固原理;(2)在对室内外试验资料进行统计分析的基础上,系统分析了搅拌桩水泥土的主要力学特性及其变化规律;(3)探讨了搅拌单桩的侧摩阻力、端阻力、极限承载力及群桩效率系数、群桩承台下桩间土荷载分担比及桩土应力比等,提出用多种计算方法并结合试验方法来综合确定搅拌桩复合地基的承载力;(4)明确指出和分析了按国家有关规范的方法确定搅拌桩复合地基承载力所存在的八个方面的缺陷与问题;(5)利用过去没有加载至破坏阶段的载荷试验成果和较少的沉降观测数据,尝试了用灰色理论预测深层搅拌桩的极限承载力,实例表明理论预测值与实测值吻合较好;(6)在常规分层总和法的基础上,探讨了复合地基沉降计算的实体墩基法、双层地基法、等效作用分层总和法、固结理论法等,特别是结合工程实例,用有限元数值计算等方法计算和讨论了搅拌桩复合地基的沉降及其变化规律;(7)结合工程实例,用数值分析方法探讨了复合地基临界桩长的问题,指出和分析了单桩荷载下的临界桩长与复合地基大面积荷载下的临界桩长存在很大的差别,复合地基的临界桩长不仅与桩土模量比有关,而且与复合地基上部荷载分布面积有关。
-
Evapotranspiration value and transpiration indexes of the three types of soil microbiotic crust under different water content(including Bryum argenteum crust,Didymodon nigrescens crust and algal crust) were measured.
通过对3种土壤生物结皮在对照和3个不同水分条件下进行蒸散量以及蒸腾指标的观测,结果表明:①3种土壤生物结皮蒸散量日变化过程呈现单峰型,各个处理间峰值出现时间和蒸散量变化幅度差异较大;真藓对照组峰值为0.473 g/10 cm2,出现时间为11:00时。
-
In this paper, four sections located respectively in Yadong-ZhergerLa in central Himalaya, Pai-Zaqu reach of Yalung-Tsangpo River, west slope section of NamuLa and east slope section of DuoxiongLa in Eastern Himalaya Syntaxis were chosen, and conventional and laser ~(40)Ar/~(39)Ar methods were used to build the framework of thermal evolution history of central-east part of Himalaya orogen, for the purpose of revealing the secret of uplif of central-east Himalaya.In Yadong district in central Himalaya, a retro-metamorphic high-pressure granulite and its country rock were focused and conventional ~(40)Ar/~(39)Ar tests were done.
本文选择位于喜马拉雅中段亚东地区的亚东—哲古拉剖面以及位于东喜马拉雅构造结的雅鲁藏布江沿岸派乡—扎曲段、那木拉峰西坡以及多雄拉峰东坡等四条剖面,利用精细的阶步加温和单次全熔~(40)Ar/~(39)Ar年代学方法,试图构建喜马拉雅中段及东喜马拉雅构造结岩体热史演化的年代学框架,以期解开喜马拉雅造山带中东段的抬升之谜。
-
Please a process ■ The purchase please a style * Purchase payment practice week knot make, each Tuesday is transfer pay day, special circumstances next Thursday consider feeling arrangement transfer payment;* All purchase list is confirm signing by the general manager assistant →finance department the cashier examine →finance the manager examine →general manager approval →cashier payment and notice supplier →the accountancy recheck and statistics;* Cash on delivery from purchase specialist confirm incoming goods amount, on the receipt signature of the supplier confirm payment amount of money, and at purchase list top signature confirm method of payment is cash payment, confirm without any error empress notice cashier payment, the accountancy recheck.
请款流程■采购请款*采购货款实行周结制,每周二为转帐付款日,特殊情况下周四酌情安排转帐付款;*所有采购单由总经理助理确认签字→财务部出纳审核→财务经理审核→总经理批准→出纳付款并通知供应商→会计复核并统计;*货到付款时由采购专员确认来货数量,在供应商的收据上签名确认付款金额,并在采购单上签名确认付款方式为现金支付,确认无误后通知出纳付款,会计复核(区分现金支付与转帐支付,确保不重复付款)。
-
To study the effect of different types of web cleaner on the card sliver quality,we have done the comparison test between the guide plate web cleaner and the anti-teeth guided flat web cleaner under the condition of the same amount of air volume.
用USTER AFIS单纤维测试系统对上述条件所加工的生条进行了检测,结果显示:反齿导向盖板式棉网清洁器所生产的生条质量总体上要好于导板式棉网清洁器,其原因是反齿导向盖板排除短绒、杂质、棉结等的作用是一种&主动&作用,而导板式棉网清洁器对短绒、杂质、棉结等的排除是一种&被动&作用,梳棉机后罩板处棉网清洁器以采用反齿导向盖板式棉网清洁器为宜。
-
The main production facilities consist of four seafood production workshops (total building area is about 6950 square meters and storage capacity is about 4000 tons )and three quick freezing room which made up aluminum plate (10 tons /each batch) and one ice-making workshop (its daly output of 35 tons )and one ice storage (total building area is about 350 square meters)and two fresh-freeing installation (the processing capacity is 1500kg/h)and one tunnel quick-freeing installation (the processing capaciyy is 600kg/h)and two production lines for processing shrimp and two production lines for cooking seafood and two production lines for processing fish and one flake ice maker(its daiy output of 35 tons)The plant built a laboratory for testing product quality,which had equipped with all equipments and instruments.
主要生产设施有:生产车间有4间,面积共有6950平方米;冷库5间面积共有3000平方米,储存量约4000吨;10吨/次铝板冷结间3间,原料保鲜库2间约250吨,日产35吨冰的制冰车间10间,储冰库350平方米。主要加工设备有:1500kg/h双螺旋单冻机2套;600kg/k隧道式单冻机1套;虾生产线2条;熟虾生产线2条;鱼生产线2条以及日产10吨片冰机1台。工厂建设有独立的产品质量检验室,配套完善的检验仪器设备,并拥有一批多年从事出口水产品加工和贸易,具有丰富实践经验的技术人员,能够适应现代水产品加工发展的需要。
-
Results indicated that, with cotton varieties succession, in the primary factor of yield constitution, the number of bolls per plant, lint index and lint percentage increased obviously, in which the number of lint percentage in modern varieties was 7.5%~19.9% higher than old varieties, along the lint index increased the seed index obviously drops with cotton variety change; boll weight and the number of bolls per plant displays opposite tendency, there was a declined trend in boll weight, from 5.9g in old varieties to 5.3g in modern varieties.
结果表明:随着棉花品种的更换,在其产量构成的主要因素中,结铃数、衣分、衣指逐步提高,近期品种衣分比以往品种增加7.5%~19.9%;在衣指提高的过程中,子指却在随品种更替明显下降;单铃重表现出与单株结铃数相反的趋势,铃重逐渐减轻,从早期品种的5.9g下降到近期品种的5.3g。
-
B The climbing rope shall be tied to each competitor's climbing harness using a 'figure of eight' knot, secured with an extra knot
攀登绳应用双八字结和单结收尾,打在选手的吊带上
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。