组合方法
- 与 组合方法 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
It also eliminates the invalid paths between statuses considering the restriction of minimum continuous time of on and off , and tamps rates , thereby reducing the number of paths in dynamic programming and attaining the aim of reducing dimensions . After confirming the running or suspended status of units , the approach is used to distribute powers among units , thereby increasing the efficiency of dynamic programming greatly .
通过比较各时段负荷及机组参数,剔除各时段下不满足要求的组合状态,从而减少动态规划中的状态点数;根据机组的最小连续运行,停运时间限制,计及机组功率上升,下降速度的约束,剔除了状态点间的无效路径,从而减少了动态规划的路径个数,达到降维的目的;在确定机组启停状态后,再采用解析法进行机组的功率分配,可以大大提高动态规划方法的效率。
-
A combination of the two therapies is often an effective method of treatment for most people.
两者的组合疗法,往往是一个有效的治疗方法对大多数人来说。
-
A simulation for the actual data proved that the method is important to the decision of transacting combination for power enterprise.
最后通过实例计算,验证了本方法对于发电企业的交易组合决策具有重要的指导作用。
-
Theoretical analysis and forecasting examples all show that the new technique has strong universalized capabilities an d the ability to adapt to the changes of function. With respect to combined modeling and forecasting of economic time series in nonlinear syste ms, which have some uncertainties, the method are feasible and effective.
理论分析和大量的应用实例表明:本方法具有很强的泛化能力与自适应数据和函数变化的能力,在处理诸如经济时间序列这种具有一定程度不确定性的非线性系统的组合建模和预测方面有较高的应用价值。
-
Training method,relative to teaching method,is an important way to improve professional technical capability of trainees.
多年来的培训实践证明,有效的培训方式一定是多种培训方法和技术的组合与并用。
-
The methods introduced above are applied to the stability analysis of the Xiaowan high arch dam abutment and rock foundation. Thus, the deformation characteristics of the rock masses and the safety factors of the block combinations are obtained, which provide important data to the engineering design.
运用上述方法对小湾高拱坝的坝肩和坝基岩体进行了稳定分析,得到了正常工况下坝肩和坝基岩体的变形规律,以及各滑动岩块组合的强度储备安全系数,从而为工程设计提供了依据。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
In this part, the thesis change the study point from theory to actuality .
在这部分中,论文将研究重点由理论转向实务,以实证分析方法考察了我国证券市场股票和国债两种资产组合中马克维兹模型、哈洛模型和VaR模型的应用效率比较,从而验证理论分析的有关结论。
-
Secondly, two stage method is adopted in the selection of development strategy. In the first stage, combine the development strategy group with the result of SWOT to select the proper strategy. In the second stage, use AHP and QSPM to evaluate the spare development strategy project, then present the final combination strategy of "BOM to continue existing strategy, BOB and Twist web with contractile strategy; No-woof blanket and Asbestos blanket with giving up strategy".
采用两阶段法进行发展战略的选择,第一阶段结合战略群模型和SWOT分析结果对公司各产品可能采取的发展战略进行初次选择;第二阶段利用AHP分析结果和QSPM方法评价第一阶段备选的发展战略,提出了&BOM毛毯采取集中发展现有业务战略,BOB毛毯和螺旋干网进行战略收缩,无纬毛毯和石棉瓦毯采取放弃战略&的战略组合方案。
- 推荐网络例句
-
Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".
歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。
-
This is Kate, and that's Erin.
这是凯特,那个是爱朗。
-
Articulate the aims, objectives and key aspects of a strategic business plan.
明确的宗旨,目标和重点战略业务计划。