英语人>网络例句>线路 相关的搜索结果
网络例句

线路

与 线路 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on rail/wheel reaction and track/bride reaction theory and systems engineering theory, new vehicle-track and vehicle-track-bridge system dynamic models are established and discussed in details, including ballast track model and ballastless track model. The characteristics of the models are:(1) vehicle-track and vehicle-track-bridge system dynamic models are coupled in vertical and lateral;(2) track vibration on bridge is taken in account, track on bridge is considered as one or two layer continuous-point supported rail model, according to actual track structure, interaction between vehicle and bridge transfer from track structure;(3) three type of ballastless track models (tieembanked, elastic-tie-block, slab track) are presented;(4) models reflect the main feature of actual vehicle, track and bridge structure, the response computation frequency of models is relatively broad, which can be applied to analyze both low frequency and high frequency vibration.

基于轮轨相互作用和线桥相互作用特点,本文从系统工程角度出发建立了车辆、有碴轨道和无碴轨道、简支箱梁桥垂向和横向耦合系统动力分析模型,该系统模型具有以下特点:(1)车线、车线桥体系均考虑为垂向、横向耦合振动系统,车线间通过轮轨接触几何关系耦合,轨道与桥梁间通过轨道与梁体间的力与位移协调条件耦合;(2)充分考虑桥上线路在车线桥系统中参振作用,根据桥上线路轨道结构特点将桥上轨道结构模型具体化,即对桥上轨道结构视为多层支承体系,车桥间的动力作用通过轨道结构来传递;(3)建立了三种形式无碴轨道动力分析模型,即长轨枕埋入式、弹性支承块式和轨道板式无碴轨道模型;(4)系统模型详细,分析频带宽,适用范围较广。

Based on this context, this paper applies CCM to assess the accessibility of public bus network by introducing multiple bus lines in the certain road sections and considering the spatial distribution of population being assigned to each bus stop. The bulk bus line demand, as the substitution of original BLD, is therefore used to reflect the people,s convenience in taking public buses.

基于道路容量需求与可达性所表征的交通便捷程度意义相反的关系,以地面公交线网为对象,在已知城市人口分布的条件下,考虑公交线路重复数的影响,对CCM加以改进,提出通过计算公共交通线路容量需求来评价地面公交线网可达性的方法。

Decades, the system does not always produce pipes, tiles, cement products and other traditional rod, but the development should be high (high-strength, high pressure) and large, new (new building materials and products) as a key to develop new products In detail: to develop high-strength prestressed concrete pile; apply to set up more than 110 kilovolt high voltage transmission lines and electrified railway lines, etc. Catenary large t m poles; application of new high-speed heavy rail with pre-stressed concrete sleeper; high-pressure , large-diameter prestressed concrete cylinder pipe; steel concrete and prestressed steel-concrete composite pipe; new type of reinforced concrete pipes, such as the mouth and socket bearing steel reinforced concrete pipes, square pipes, short-shaped pipes, common drains ; reinforced concrete inspection and; urban and rural construction using a variety of hollow interior wall panels and composite wall panels, concrete hollow block.

不能几十年一贯制生产管、瓦、杆等传统水泥制品,更应把发展高、大、新作为重点开发新产品,具体讲:大力发展预应力高强混凝土桩;适用于架设110 千伏以上高压输电线路和电气化铁路接触网线路等的大吨米电杆;适用高速重载铁路用的新型预应力混凝土轨枕;高压、大口径预应力钢筒混凝土管;钢板混凝土和预应力钢板混凝土复合管件;新型钢筋混凝土排水管,如钢承口和承插式钢筋混凝土排水管、方型渠、短形渠、共同渠;钢筋混凝土检查并;城乡建设用的各种空心内墙板和复合外墙板、混凝土空心砌块。

The passenger transportation special lines cross sector seamless line fixed axle warm design, the bridge the seamless line design, the rail expand and contract the regulator, the glued joint insulated rail joint design are dissected.

对客运专线跨区间无缝线路的锁定轨温设计、桥上无缝线路设计、钢轨伸缩调节器、胶接绝缘接头设计进行详细研究。

After transformation,line protection can select phase correctly when cross country fault occurs,the transmission of protection signals can be more reliable and rapid in optic fiber channel,to provide more.

改造后,线路跨线故障时保护能正确选相,保护信号通过光纤通道能更可靠快速地传输,为500 kV线路更加安全稳定运行提供保障。

This paper, based on above analysis and research, suggests the insulation level of the main equipment in UHV system (including transformer, circuit breaker, disconnecting switch, reactor and MOA), which can be used as a references to research, manufacture of UHV equipment and design of power substation and transmission line.

在此基础上,对特高压系统的主要变电设备(包括变压器、断路器、隔离开关、电抗器和MOA)和输电线路的绝缘水平提出了建议,以供我国特高压设备研制和线路变电所设计参考。

Of these, 104,106,613 road alignments, no adjustment; 132,134 road alignments will be adjusted.

其中,104、106、613路线路走向不作调整;132、134路线路走向有所调整。

Modern alpinists try to climb mountains by a route which will give them good sport, and the more difficult it is, the more highly it is regarded.

现代登山运动员总想找一条能够让他们体会到运动乐趣的登山线路,并且线路越困难得到的评价就越高。

The application of transmission line arresters is one of efficient technology to lower lightning fails.

线路避雷器是降低雷击事故率有效措施之一,研制带外串间隙线路避雷器具有重要的实际意义。

Previously, a scholar proposed a scheme that used the number of n + 1's computers to integrate the number of n's load balancers for the load balance of circuit.

先前有学者提出一种机制,使用n+1台电脑整合n条ADSL线路,达到线路的负载平衡。

第27/100页 首页 < ... 23 24 25 26 27 28 29 30 31 ... > 尾页
推荐网络例句

But we don't care about Battlegrounds.

但我们并不在乎沙场中的显露。

Ah! don't mention it, the butcher's shop is a horror.

啊!不用提了。提到肉,真是糟透了。

Tristan, I have nowhere to send this letter and no reason to believe you wish to receive it.

Tristan ,我不知道把这信寄到哪里,也不知道你是否想收到它。