英语人>网络例句>管道 相关的搜索结果
网络例句

管道

与 管道 相关的网络例句 [注:此内容来源于网络,仅供参考]

Heating furnace of steel of Lai steel tape transforms nearly 6 years to come through type of accumulation of heat, in producing a course, because a variety of caustic medium such as SO2, H2S are contained inside flue gas conduit, after moving for a long time, conduit wall is rustily below these medium chemistry serious, cause conduit average ply is not worth 1mm, and occurrence bedding face of conduit of local flue gas accumulates rubiginous sodden phenomenon, air leak is serious, increased many and gas use up, and move to heating furnace safety cause menace.

莱钢窄带钢加热炉经过蓄热式改造近6年来,在生产过程中,由于烟气管道内含有SO2、H2S等多种腐蚀性介质,长期运行后,管道内壁在这些介质化学功能下锈蚀严重,造成管道平均厚度不足1mm,而且局部烟气管道出现大面积锈烂现象,漏风严重,增加了大量煤气消耗,且对加热炉平安运行造成威胁。

We carry on studying and designing of drainage pipe imaging testing system comparatively lately. Therefore, it is epoch-making and meaningful that I study the drainage pipe ultrasonic imaging testing system for our country"s online ultrasonic imaging testing system. And it is very much meaningful that we improve our country"s drainage pipe level.

由于我们国家对排水管道成像检测的研究起步比较晚,所以本课题研究的排水管道超声波成像检测系统对我们国家排水管道在线成像检测具有非常重要的意义,同时对提高我国的排水管道检测水平,也具有十分重要的意义。

The main factors affecting the filtration characteristics of perforated rainwater drainage pipe are studied by means of model test.

本文通过透水雨水管道模型试验,对渗透式雨水管道雨量入渗的主要影响因素进行了分析探讨,得到了判定管道开孔情况的临界面积公式,以及透水雨水管道在不同开孔条件下单位管长的雨水稳定渗透量计算公式。

Company's main products are standard transport mechanisms for FRP tank, FRP winding storage tank, storage tank, reaction tank, amino acids and special equipment cans, seafood fish transport tank; counter-flow cooling towers, a square cross-flow cooling tower; FRP winding pipes, composite pipes, pipe fittings, pressure pipes, ventilation ducts; legislative efforts in various models, axial fan, roof fan, regulating valves, fire dampers, modular water tanks, washing drums, wash trough, glass fiber reinforced plastic handicrafts, printing and dyeing cloth vehicles more than 200 varieties, and in accordance with user needs, to conduct non-standard design and production.

公司的主要产品有机制玻璃钢标准运输罐、玻璃钢缠绕储罐、贮罐、反应罐、氨基酸专用设备罐、海鲜活鱼运输罐;逆流式冷却塔,横流式方形冷却塔;玻璃钢缠绕管道、复合管道、管件、压力管道、通风管道;各种型号的立心机、轴流风机、屋顶风机、调节阀、防火阀、组合式水箱、洗鼓、洗槽、玻璃钢工艺品、印染布车等200多个品种,并可根据用户需要,进行非标设计和生产。

This paper introduces the optimum selection on pipe diameter of feed water system for Zhejiang Guohua Ninghai Power Plant PhaseⅡ 2×1 000 MW Extension Project.

介绍了浙江国华宁海电厂二期2×1 000MW扩建工程给水系统管径优化的情况,对高压给水管道管径优化进行了详细的计算和分析,在对给水系统管径的多方案进行技术经济比较后,给出了优选出的低压给水管道、高压给水管道以及给水再循环管道的规格。

In addition to the activated inner north, south western section of double-track lines, and have been implemented into the German line of gas pipeline and other projects, the oil will be in the "Eleventh Five-Year" period the building of gas pipeline, North Outer Ring Road project, South Route East security risks rectification works, Naxi - Abe gas pipeline project, Wei-Qing line 34 change line project type region, iron and hillsides gathering pipeline, gas pipeline Zhongqing Line renovation project and other projects.

除了激活内在北部,南部的西段复线,并纳入天然气管道等项目的德国行已经实施,石油将在&十一五&期间,建设天然气管道,北外环公路工程,南线地区的安全风险补救工程,纳西族-安倍的天然气管道工程,渭清线34线项目变更类型区,铁山坡和收集管道,中青线输气管道改造工程,其他项目。

Aiming at the uncertainty problem of crack character and location of concrete outside the penstocks,the cracking area of concrete outside the penstocks of the Three Gorges Hydropower Station under designed load is obtained by using nonlinear 3D-FEM.

针对三峡压力管道外包混凝土裂缝性状和位置的不确定性问题,通过对三峡压力管道的三维非线性有限元分析,得出了在设计荷载作用下三峡压力管道外包混凝土开裂区域位置,并给出了管道混凝土可能的最大裂缝宽度值。

Aiming at the uncertainty problem of crack character and location of concrete outside the pen-stocks, the cracking area of concrete outside the penstocks of the Three Gorges Hydropower Station under designed load is obtained by using nonlinear 3D-FEM. And the likely maximum width of crack of penstock concrete is also worked out.

针对三峡压力管道外包混凝土裂缝性状和位置的不确定性问题,通过对三峡压力管道的三维非线性有限元分析,得出了在设计荷载作用下三峡压力管道外包混凝土开裂区域位置,并给出了管道混凝土可能的最大裂缝宽度值。

Flow Accelerated Corrosion is an important aging mechanism for water and water/steam piping made of carbon steel or low alloy steel in both nuclear power plants and fossil power plants. Accidents in Surry Unit 2 in USA and Mihama Unit 3 in Japan, caused by pipe rupture due to FAC, led to severe casualties. The experience, mechanism and countermeasures about the aging management of FAC in nuclear power plants are summarized in this paper.

管道流体加速腐蚀是核电厂和常规电厂碳钢或低合金钢材料汽水管道的一个重要的老化机理,历史上曾发生过美国萨里核电站2号机组和日本美滨核电站3号机组管道破裂等导致人员伤亡的严重事故;本文简要总结了核电厂管道流体加速腐蚀的经验教训、机理及其老化管理的一些方法和对策。

Wavelet packet decomposition can decompose high-frequency part of signal. In order to obtain the energy rate index of each node this paper advances apply wavelet packet decomposition method to node response of pipe. And then use statistics method to analysis the energy rate index indicator of various nodes in pipe. Results show this method not only can detect the locations of damage in pipe, but also can get a preliminary study for quantify the damage degree damage of pipe.

本文提出将小波包分解方法应用于管道的节点响应,得出各个节点的能量率指标,并利用数理统计方法对管道上各个节点的能量率进行统计分析,结果表示该法不仅能确定管道的损伤位置,而且还能对管道损伤程度的定量分析作一个初步的研究。

第4/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。