英语人>网络例句>管 相关的搜索结果
网络例句

与 管 相关的网络例句 [注:此内容来源于网络,仅供参考]

Results The successful rates of single puncture were 82.3%,two-times puncture 93.7%,three-times puncture 100%.The effects of all cases were good.

结果 UPTCD一次置成功率82.9%,二次置成功率93.3%,三次置成功率100%,全部病例引流通畅,效果明显。

Company Profile of Tianjin Feilong Tube Co., Ltd., is a good faith enterprise and one of famous enterprises in Tianjin, Tianjin Dagang is the backbone of the enterprise; founded in 1995 and currently employs 1300, of which 36 were in professional and technical personnel, Eight senior titles, and the factory covers an area of 600 mu, building area of 50,000 square meters, fixed assets 140 million yuan, the existing 19 high-frequency welded pipe production lines, four heat zinc production lines, four expanded pipe production line, as well as acid washing, annealing kiln, large slitting, 4, and assorted rolling production lines.

天津市飞龙制有限公司,是全国诚信企业和天津市知名企业之一,属天津市大港区骨干企业;始建于1995年,现有员工1300名,其中专业技术人员36人,中高级职称8人,厂区占地面积600亩,建筑面积5万平方米,固定资产1.4亿元,现有19条高频焊生产线,4条热度锌生产线,4条扩生产线,以及酸洗、退火窑、大纵剪、4连轧等配套生产线。

With the aid of aniline blue staining, pollen tube growth in pistil tissue was observed in Arabidopsis thaliana, and the growth speed of pollen tubes in style and ovary were calculated, the results showed that the pollen tube grew faster as time goes on.

以模式植物拟南芥为供试材料,利用脱色苯胺蓝染色的方法观察了拟南芥花粉在雌蕊组织中的生长情况,获得了花粉从萌发到进入花柱和子房不同时期的生长速率,结果表明,花粉在不同时期的生长速率呈现出逐步加快的趋势。

The pollen living ability declined with time prolonging and the best condition for pollination was 22~28℃and fresh pollen appearing .By means of benzidine- hydrogen peroxide reaction and aniline blue fluorescence method, showed that the stigma receptivity could teach to 12 days since flowering. Compared with self pollination, the pollen was easily adhered into sigma and the pollen tube was easily entered into style in cross pollination experiment.

通过联苯胺—过氧化氢反应法和苯胺蓝荧光法观察了柱头的可授性、花粉在柱头的黏附、萌发及花粉的生长情况,结果表明:非洲菊柱头发育初期就具有可授性,可授期达12d ;杂交和自交相比,杂交的花粉比较容易黏附、花粉进入柱头比较容易,二者存在花粉黏附数量和花粉进入数量的差异。

A rotisserie comprising a housing defining a cooking chamber, a rod member adapted to hold food in said cooking chamber for roasting, and a rotary motor drive provided at one side of said housing and adapted to rotate said rod member in said cooking chamber, wherein said rotary motor drive comprises: a motor case holding a motor, said motor case having an axle hole into which said rod member is inserted and coupled to said motor; coupling means adapted to secure said motor case to one side of said housing; a lighting fixture mounted on said motor case and adapted to illuminate said cooking chamber; and wherein said lighting fixture comprises a bellows support tube, said bellows support tube having a bottom end fixedly fastened to said motor case and a top end, and a lampshade fastened to the top end of said bellows support tube.

一个烤肉馆组成定义一间烹饪室的一个住屋,一个竿成员适应为烘烤在说的烹饪室中支撑食物,和一个旋转的马达发动提供了在边说居住而且适应在说的烹饪室中替换说竿成员,在何处说旋转的马达发动包含:一个马达的情形举行被说进入哪一个说竿成员被插入而且加倍说马达之内有一个轮轴洞的马达的情形的一个马达;联结方法适应说保护对边说马达的情形居住;一个照明固定物展开了在被说的马达情形上而且适应照明说烹饪室;而且在何处说点固定物包含风箱支持,说固定有一个底部的结束的风箱支持拴紧说马达的情形和最上面的结束,而且一个灯罩对说的风箱最上面的结束拴紧了支持

Aiming at the two structural features of axle shaft sleeve on the basis of analyzing various forming technologies applied in domestic and overseas in recent years,two new hot extrusion forming technology of axle shaft sleeve are worked out.

针对半轴套的两种结构特点,在分析了国内外近年来所采用的各种成形工艺的基础上,分别开发了用镦粗-反挤压和扩径-正挤压两道复合工序相结合成形分体式半轴套和用两次复合镦挤的方法成形整体式半轴套的两种热挤压成形新工艺,通过物理模拟实验证明了成形工艺的可行性、实用性。

Option One: a multi-polar set of ordinary water pipe installation balancing valve hole ① in charge of water pipe line and the 20-hole HVAC balancing valves installed ② Install a balancing valve in the shaft exit ③ air box installed in each balancing valve ④ In each of the tenants on the installation of balancing valve outlet Option Two: Using the Dynamic Balance valve ① fan coil unit installed in the end of the balancing valve ② air-condition the box at the end of the balancing valve is installed After the economic comparison, the final adoption of the balance valve program ① air box end of the installation of balancing valve and the automatic control valve ② retail and office space within the District, a combination of two or three fan coil balancing valves and automatic control valves, each fan coil outside the district office for personal use of a balance valve and automatic control valve 3, balance valve application summary ① long pipeline DRS installation of large multi-level system price higher than the end of the normal balance valve device a dynamic balance valve.

方案一:多极设置普通水井间安装平衡阀①在主线与20个暖通水井间安装平衡阀②在竖井出口位置安装平衡阀③在每个空调箱上安装平衡阀④在每个租户的出水口上安装平衡阀方案二:使用动态平衡阀①在末端装置风机盘上安装平衡阀②在末端装置空调箱上安装平衡阀经过经济比较,最终采纳的平衡阀方案是①空调箱末端安装平衡阀及自控阀②零售和内区写字楼两或三个风机盘合用一个平衡阀及自控阀,外区写字楼每个风机盘自用一个平衡阀及自控阀 3、平衡阀应用总结①长线异程大系统多级安装普通平衡阀价格高于末端设备一级动态平衡阀。

Option One: a multi-polar set of ordinary water pipe installation balancing valve hole ① in charge of water line and the 20-hole HVAC balancing valves installed ② Install a balancing valve in the shaft exit ③ air box installed in each balancing valve ④ In each of the tenants on the installation of balancing valve outlet Option Two: Using the Dynamic Balance valve ① fan coil unit installed in the end of the balancing valve ② air-condition the box at the end of the balancing valve is installed After the economic comparison, the final adoption of the balance valve program ① air box end of the installation of balancing valve and the automatic control valve ② retail and office space within the District, a combination of two or three fan coil valves Valves and Controls, for personal use outside the district office for each fan coil unit and automatic control valve of a balance valve 3, balance valve application summary ① long pipeline DRS installation of large multi-level system price higher than the end of the normal balance valve device a dynamic balance valve.

方案一:安全阀多极设置普通水井间安装平衡阀①在主线与20个暖通水井间安装平衡阀②在竖井出口位置安装平衡阀③在每个空调箱上安装平衡阀④在每个租户的出水口上安装平衡阀方案二:使用动态平衡阀①在末端装置风机盘上安装平衡阀②在末端装置空调箱上安装平衡阀经过经济比较,最终采纳的平衡阀方案是①空调箱末端安装平衡阀及自控阀②零售和内区写字楼两或三个风机盘合用一个平衡阀及自控阀,外区写字楼每个风机盘自用一个平衡阀及自控阀 3、平衡阀应用总结①长线异程大系统多级安装普通平衡阀价格高于末端设备一级动态平衡阀。

Pipeline cleaner launch /receiving ball barrel is the essential process device for pipeline cleaning operation in terms of launching and receiving pipeline cleaning equipment.

器收、发球筒是线清扫线作业时发送和接收清设备的重要工艺装备。

A process for continuously preparing nm carbon tubes on fluidized bed include such steps as carrying the transition metal oxide catalyst on carrier, putting it in catalyst-activating reactor, reduction reaction by introducing the gas mixture of nitrogen gas and hydrogen or CO gas to the reactor, loading the catalyst into fluidized bed, and introducing mixed reaction gas to its to grow said nm carbon tubes on the catalyst by chemical gas-phase deposition.

本发明涉及一种流化床连续化制备碳纳米的方法,首先将过渡金属的氧化物催化剂载于担体上,然后将其放在催化剂活化反应器内,通入流动的氢气或一氧化碳与氮气的混合气体进行还原反应,最后将催化剂送至流化床中,通入反应混合气体,流化床的下部则得到碳纳米。本发明的方法和装置,在流化床中经过化学气相沉积,在催化剂载体上生长出碳纳米

第78/100页 首页 < ... 74 75 76 77 78 79 80 81 82 ... > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力