空载
- 与 空载 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The author made a simulation model in Matlab/Simulink, and did simulation in several conditions such as no load, integrating with power grid, independently modulation of the active and reactive power and capture of the maximum wind power. The simulation results show that analysis is right and have very important guidance signification on experimental systems.
在此基础上,以Matlab/Simulink为工具,建立了系统仿真模型,进行了发电机空载运行、并网、有功、无功功率独立调节、最大风能捕获运行等工况的仿真研究,仿真结果证明理论分析正确,对系统的实验研究具有一定的理论指导意义。
-
When stator circuit is open, according to grid voltage and rotor speed, rotor excitating current is adjust...
仿真和实验结果表明,本文所提出的空载并网方式是变速恒频风力发电的一种较理想的并网方式。
-
Based on this, we analyzed the no-load model of DFIG (doubly-fed induction generator), rectifying control model and grid-connection control of inverter, and set up the whole connecting system.
研究双馈电机的空载模型、变频器的整流控制模型和并网控制模型,建立整个并网发电系统,并通过完整的仿真验证系统建模与控制的有效性。
-
The 5mV of the audio signal which comes from the microphone to linear amplificated by the audio signals amplifier,then mixes with music signals from other sound sources(eg:the tape 、CD) by the hybird amplifier . By the control of the digital volume controller the mixed signal ,then amplificated again by the preamplifier,when integrated power amplifier for idling time realizes the signal enlargement factor respectively is 10、100、1000 times;moreover is capable of delivering 3V of output to a 600%26Omega; load. the amplificate signal makes the loudhailer work at last.
该音频信号放大器能够将来自话筒5mV的音频信号进行线性放大,然后和来自其他音源的音乐信号通过混合放大器来混合,混合后的信号经数字音量控制器对高低频的增益进行提升与衰减,再通过前置放大器放大,当集成功率放大器为空载的时候实现信号的放大倍数分别为10、100、1000倍;另外再实现当负载为600%26Omega;的时候,输出幅度为3V,最后经扬声器发出悦耳的声音。
-
The MV winding shall be provided with tappings that allow a regulation of the no-load voltage in the range + 5% and - 7.5%, by means of + 2 and - 3 steps of 2.5 % each.
中压线圈应带有分接头,允许空载电压有+ 5%至- 7.5%的适应范围,通过每级2.5%进行+ 2 、- 3调节。
-
Test tasks: to check whether the loose connector; hand plate coupling the rotor to move a few laps to see whether rotation and flexible unit, whether there is uneven sound and light and heavy feeling, to determine whether pump or foreign body axis is curved seals, such as the installation is correct; inspection seal on the 20th cavity clean lubricants are added 1 / 2 cavity space; pump unit surface is clean; unit no-load test shift.
试车工作:检查连接件是否松动;用手盘动联轴器使转子转数圈,看机组转动是否灵活,是否有响声和轻重不匀的感觉,以判断泵内有否异物或轴是否弯曲,密封件安装正不正等;检查密封腔内的清洁20号润滑油是否加注1/2腔内空间;泵机组表面是否干净;机组转向空载测试。
-
Test job: to check whether the connections loose; hand plate coupling the rotor to move a few laps, watch crew rotation is flexible, it has the sound and feeling of the severity of Unevenness to determine whether there is foreign body pump or shaft is bending, sealing the installation is not correct, etc.; inspection seal cavity clean lubricants on the 20th whether or not add 1 / 2 cavity space; pump unit surface is clean; crew turned no-load test.
试车工作:检查连接件是否松动;用手盘动联轴器使转子转数圈,看机组转动是否灵活,是否有响声和轻重不匀的感觉,以判断泵内有否异物或轴是否弯曲,密封件安装正不正等;检查密封腔内的清洁20号润滑油是否加注1/2腔内空间;泵机组表面是否干净;机组转向空载测试。
-
The operation staff should test all the running parts, connection, fixed parts, track and wire rope, etc. everyday before operate the machine, then vacancy load for 3 times to confirm reliable. When using it ,pay attention to the conditions of hoisting machine, sliding wheel, wire rope, hang coop. Make
6.5操作人员应在每天操作前检查各运行部分,各连接,固定部位、轨道及钢丝绳,无异常情况,然后,操作运行空载上下三次,确认安全可靠后,方可使用,使用中要随时注意卷扬机记录,下班时检查各部件,并清扫吊笼内灰渣,锁好护栏门,将总电源关闭
-
In the actual manufacturing with NC machine, in order to check whether the parts design and the cutting route are right or not, generally it is tested by examing how the tool and work plane will move with the input NC programme and without an actual part. Once the movement does not match the prescribed process, there must be a change to the design graphics and the NC programme, and then test again, until the tested one matches the requirements. This inevitably leads to the waste of manpower and time, so it is necessary to make a computer simulation to realize the fastness and preciseness of the movement and path of the machine.
哈尔滨工程大学硕士学位论文实际数控生产中,为了验证图纸的设计及其工艺路线是否正确,在正式加工前,经常让机床在输入编制好的NC程序后空载运行,以观察刀具及工作台是否能按预期的要求运动,一旦不合乎要求,则须反复对程序和图纸进行修改,这势必造成人力、物力的浪费,因此有必要对刀具和工作台的运动过程及其轨迹进行仿真,以便及时、准确地进行正式加工。
-
Integral in the design of three-dimensional structure of the storage shelves, with particular attention to the following two of the most adverse combination of loads: the role of wind load at the time of a state-wide database of no-load power; when the level of seismic action of the whole library full of force.
在设计整体式立体仓库的货架结构时,尤其注意下列两种最不利的荷载的组合:风载起作用时的全库空载状态下的受力;水平地震作用时全库满载下的受力。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。