确定方向
- 与 确定方向 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
From the burden increased aspect clarify set up the necessity of station, then pass to drew up to set up generalize of transformer substation and line direction to consider, and pass to analysis of carry the data, safety, economic and dependable consider and made sure the 110 kV, 35 kV, 10 kV and station use electricity of lord connect line, then again through burden calculation and power supply scope made sure main number, capacity and model number of the transformer set, also in the meantime make sure the station uses capacity and model number of transformer, end, according to biggest keep on work electric current and short circuit calculating of calculation result, to the high pressure Rong break a machine, insulate a switch, female line, insulate son and wear a wall set tube, electric voltage with each other feeling machine, electric current with each other the feeling machine carried on choose a type, thus completed a 110 kV electricity a part of design.
本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。
-
Then the inauguration function is designed as five child modules: the determination of the leading vehicle, the assignment of the UIC address, the determination of node reference direction, the determination of NADI state and the integration of nodes.
其中初运行函数模块又被详细划分为五个子模块:头车辆的确定、UIC地址分配、节点参考方向确定、节点的整合、NADI状态的确定。
-
The newly ascertained path for oil migration, which is accurately southeastward instead of coarsely southward, indicates the directions for further explorations on the compound Lukeqin block zone.
通过分析进一步确定了成藏期的油气运移方向,即鲁克沁构造带的油气运移路径和方向是由北西向南东,为鲁克沁构造带复杂断块区油气藏的进一步勘探指明了方向。
-
Firstly, need some geometric information which include the vanishing line of the ground plane, a vanishing point for the vertical direction and a known vertical height.
该方法首先根据单幅图像提供的一些几何信息———地平面(或者是与地平面平行的平面)上两对不同方向的平行线和竖直方向的一对平行线———在图像上求得地平面的消影线和竖直方向的消影点;然后,用一个已知的参考高度来确定高度测量方程中的比例因子α;最后只要输入待测高度的端点坐标就可以获得该高度的实际值。
-
Further, the paper develops conceptual design patterns for deploying internal facilities of a logistics yard based on forecasts of goods movements which determines the size of the.
在对物流和物流节点进行分类研究的基础上,根据规划年各货物品种流动路线及其他外部条件,确定备选物流节点位置,并对其进行比选,最终确定物流节点规划布局方案;同时,根据物流方向预测结果,科学合理地确定各个物流节点的规模,并专门针对物流园区内部设施的布局提出概念性设计模式。
-
The anisotropical characteristics of metal rubber elements performed under loadings in different directions were researched, and physical hypothesis were provided for the analysis of inner structure of metal rubber material The main parameters for the analysis of anisotropical performance were confirmed according to the previous hypothesis and tested experimentallyThe results show that variety of the relative heights and the radius of MR elements affect the radial stiffness of MR isolator When isola...
研究了金属橡胶构件在不同方向的载荷作用下表现出来的各向异性,提出了用于分析金属橡胶材料内部结构的物理假设,并根据假设确定了各向异性研究的主要参数,然后通过实验研究进行了验证。实验结果表明,如果改变金属橡胶元件的相对高度,增加径向尺寸可以在很大范围内改变金属橡胶隔振器的径向刚度;要使金属橡胶隔振器的力学特性更近于线性,应让隔振器在径向范围内工作;如果隔振系统中含有多个承受压载荷的金属橡胶隔振器,则可以使其工作在与成型压力方向相垂直的方向。当相同结构和尺寸的钢元件和金属橡胶元件在承受剪切载荷作用时,这两种材料表现出了相同的刚度变化趋势。
-
This law needs to watch the trend of the step on face of CdSe crystal cleavage only, can determine the C axis direction of CdSe crystal, namely the C axis direction that the direction with the outspread step on cleavage face is CdSe crystal, used law of X ray diffraction to undertake test and verify to the result.
此法只需观察CdSe晶体解理面上台阶的走向,便可确定CdSe晶体的C轴方向,即解理面上台阶延伸的方向为CdSe晶体的C轴方向,并采用X射线衍射法对结果进行了验证。
-
Early in 1995, in his "Desire" series where red and blue lines come in strong contrast with each other, Ma Yiping instinctively used his personal experience to drop a hint of the transcendence of life. From 1996 to 2001, his "Images" series established the development direction of his art, owing to its artistic expression_r_r of overloaded psychological priori images. In his works before or after 2003, dream-like symbolic images presented perplexed feeling of human beings about the universe and the physical world. In his "images" series in 2006, uncertain images stood on black cube-shaped objects and ambiguous edges pointed to various uncertain directions with the accompaniment of silver light and shadow. At this point, the intuitive perception of the essence of nature made his artistic style gradually take shape. In his later "fetish" series, in which he gradually became mature in spiritual and symbolic expression_r_rs, Ma Yiping fully grasped the eternal sense of the spiritual world.
在早期,1995年的《欲望》马一平用对比强烈的红色、蓝色层层涂盖、本能地运用自身感受以暗示的手法表达对生命的超越。1996-2001年以物象为主题的系列作品对超载心理先验物象的表达方式确定了他艺术作品的发展方向,2003年前后的作品中,梦一般的暗示性物体程现了生命本体对宇宙物理世界的茫然,在2006年的《物象》系列中,黑色的方体上不确定的物状、模糊的边缘在泛着银色光影的衬托下,泛生着各种不确定的指向感,此时对本质直观的感知性的把握使作品艺术风格基本形成,到后来的《神物》已经充分地把握了精神世界里的永恒感,画面中所能达到的精神性和神密暗示意义的表现手法已近成熟。
-
Vertical and horizontal surrounding rock pressure can be determined by the statistic analysis of actual measured data.
依据实测围岩压力的垂直与水平分量沿隧道跨度与高度方向的统计规律,确定垂直方向与水平方向围岩压力的计算图式。
-
From the burden increased aspect clarify set upthe necessity of station, then pass to drew up to set up generalizeof transformer substation and line direction to consider, and passto analysis of carry the data, safety, economic and dependableconsider and made sure the 110 kV, 35 kV, 10 kV and station useelectricity of lord connect line, then again through burdencalculation and power supply scope made sure main number, capacityand model number of the transformer set, also in the meantime makesure the station uses capacity and model number of transformer,end, according to biggest keep on work electric current and shortcircuit calculating of calculation result, to the high pressureRong break a machine, insulate a switch, female line, insulate sonand wear a wall set tube, electric voltage with each other feelingmachine, electric current with each other the feeling machinecarried on choose a type, thus completed a 110 kV electricity apart of design.
本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。
- 推荐网络例句
-
The absorption and distribution of chromium were studied in ryeusing nutrient culture technique and pot experiment.
采用不同浓度K2CrO4(0,0.4,0.8和1.2 mmol/L)的Hoagland营养液处理黑麦幼苗,测定铬在黑麦体内的亚细胞分布、铬化学形态及不同部位的积累。
-
By analyzing theory foundation of mathematical morphology in the digital image processing, researching morphology arithmetic of the binary Image, discussing two basic forms for the least structure element: dilation and erosion.
通过分析数学形态学在图像中的理论基础,研究二值图像的形态分析算法,探讨最小结构元素的两种基本形态:膨胀和腐蚀;分析了数学形态学复杂算法的基本原理,把数学形态学的部分并行处理理念引入到家实际应用中。
-
Have a good policy environment, real estate, secondary and tertiary markets can develop more rapidly and improved.
有一个良好的政策环境,房地产,二级和三级市场的发展更加迅速改善。