英语人>网络例句>研究工程 相关的搜索结果
网络例句

研究工程

与 研究工程 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on the composing characteristics of materials(ATB-30) and the application practice of asphalt stabilized macadam base in Zhashui-Xiaohe expressway,the technical standard of raw and proce-ssed materials,materials composition design,the construction technique and construction quality control key points of ATB-30 were studied and analyzed.

根据ATB-30材料组成特点,结合柞小高速公路实体工程应用情况,从原材料技术要求、组成设计、施工工艺以及施工质量控制要点等方面对ATB-30沥青稳定碎石施工质量控制进行研究和分析,并提出ATB-30沥青稳定碎石施工工艺及质量控制方法,可供工程实践参考应用。

Anti-sliding pile especially the pile with prestressed anchor cable and the foundation beam with prestressed anchor cable including the single beam and the frame, are the new pattern structures of the pile-anchor system that have been widely used in the slide-resistant engineering.

抗滑桩尤其是预应力锚索抗滑桩和预应力锚索地梁是近年来较多地应用于抗滑工程的新型桩锚结构,这些结构的设计理论研究大大滞后于工程应用,其设计计算缺乏相应的规范作指导,存在的问题较多。

This thesis elaborates on the research and development ofthe production management information system of marine carriage engineeringsurpervision company of Guangzhou port by empl...

本文叙述的是利用计算机网络技术、软件工程规范和通信保密技术对广州港水运工程监理公司监理信息系统的研究与开发。

The research and analysis of the loess cave dwelling disaster not only has the engineering background,but also has important humanity and ecological significance.

黄土窑洞是目前世界上建筑面积最大的地下工程群体,研究黄土窑洞病害问题不仅具有工程背景,也有重要的人文和生态意义。

Focusing on this practical engineering problem and by researching on some relative enterprises, this article intends to describe the dust generation mechanism, diffusion rules, control technology of dust by means of theoretical analysis and numerical simulation in coal washery, and put forward a comprehensive plan of dust control which takes bag filter as main dust removal equipment, and make an optimal design of air delivery and positioning, to realize the optimal control of dust.

针对这一工程实际问题,通过对相关企业的调研,本研究对选煤厂中粉尘产生机理、扩散规律及控制技术进行理论分析和数值模拟;并提出以除尘器为主要设备的粉尘治理综合方案,并对其风量、安装位置等工艺参数进行工程设计,以实现对粉尘的最优化控制。

As the MSA Information System and the MSA Information System have put in operation, this paper is try to design and plan the electronic maritime endorsement system in Yangtze River Delta, emphasizing on the connection of the different information system.In principle, the Yangtze River Delta maritime endorsement system is a long project .It should be divided into several stages and set different objects for each stage .

鉴于交通部海事局全面启动和已部分实施&水监信息系统一期&工程和&水监信息系统二期&工程,本规划和设计选定长三角地区船舶电子签证系统规划和设计作为课题,着力研究在长三角地区率先实现不同海事机构签证信息系统的联网,从而使区域性海事一体化管理有了可能。

The Fen 1 Reservoir, as the short term regulating reservoir of SM Connection Works, also has the sedimentation problem. With the increasing sedimentation and the useful storage decreasing, the reservoir is losing the ability of regulating and a new reservoir will be needed to build upstream the river. In this case, in order to determine the operation mode of the reservoir in flood season, the joint operation of Fen 1, Fen 2 and Haoshuigou reservoir, the density flow desilting rule and the control mode of the Fen 1 reservoir, we analyze the disilting for the regulating reservoir of Wanjiazhai Yellow River Diversion Project Connection Works.

汾河水库作为引黄工程南干联接段的近期调节水库,也存在泥沙淤积问题;随着汾河水库泥沙淤积的加剧,兴利库容将逐年减少并逐渐失去对引黄水的调节能力,需要在上游修建新的调节水库,在这种情况下,进行了万家寨引黄工程联接段调节水库泥沙冲淤分析研究,主要目的就是确定南干调节水库汛期运用方式、汾河水库、汾河二库、好水沟水库联合运用的淤积形态,以及汾河水库异重流排沙规律和汾河水库的运行调度方式。

To the outside, we mainly study an offer model in which one indivisible civil-engineering project of unknown construction cost is tendered to n tenders. The offer is not the sole decisive factor which decides who will get the contract, the tendering plan and the offer can play an important combinatorial role in the competition, and the winner's offer via the procedure of competitive bidding tends to the symmetric Nash equilibrium in both the probabilistic sense and the economic sense.

对外主要研究完全不合作的投标竞争环境下的n人投标报价决策问题,考虑到报价不是得标的唯一决定性因素,施工方案和工程报价为赢得工程施工合同共同发挥组合效应,一定条件下,报价趋于Nash平衡。

In order to scientifically manage exploration data, three-dimensional database composed of rock mass quality indices is established under the geodetic reference frame. Those indices are obtained from adits, drill holes and outcrops.

大型水电工程往往积累有丰富的勘探资料,如何科学地管理这些资料并将其直观、准确地反映在工程地质图件上,即将岩体结构类型及岩体质量空间变化特征以图形展示,是当前研究的重点和难点之一。

Research methods: Based on the site geological survey information about water bursting of Cangling Tunnel, the concrete analyses are made for the scale, location, causes and geological conditions of water bursting and the explorations are made on the characteristics of composite of surrounding rock, geological structure, modern structural stress field and underwater from the view of geological engineering point in order to seek the regularity of water bursting and better treatment.

研究方法:根据发生突水事故的浙江苍岭隧道的现场地质观测资料,具体分析其形成的规模、位置、诱发因素以及地质条件,从地质工程的角度,对突水发生地段隧道的岩石组成、地质构造、现代构造应力场以及地下水等工程地质特征进行探讨,进而发现其规律和防治预测的特点。

第49/100页 首页 < ... 45 46 47 48 49 50 51 52 53 ... > 尾页
推荐网络例句

She gently rebuff ed him, but agreed that they could be friends

她婉言拒绝了,但同意作为朋友相处。

If in the penal farm, you were sure to be criticized.

要是在劳改农场,你等着挨绳子吧!

Several theories about reigniting and extinguishing of the arc have been refered.

本文综合考虑了几种电弧重燃和熄灭理论。