英语人>网络例句>电站 相关的搜索结果
网络例句

电站

与 电站 相关的网络例句 [注:此内容来源于网络,仅供参考]

In order to realize the fast and reliable data communication between the PLC of marine power station monitoring system and upward processors, AT91R40008 high-proficiency ARM processor by AT-MEL and multi-line UART enlarged chip ST16C654 by EXAR are used to design the gateway device.

为实现船舶电站监控系统中底层独立的发电机控制单元与上层工控机之间有效快速的数据传输及可靠的数据通信,采用ATMEL公司的AT91R40008高性能ARM处理器以及EXAR公司的多路UART扩展芯片ST16C654设计网关设备。

Because of the particularity of this system and the complexity of the hydraulic phenomena of unsteady flow, it is essential to research its hydraulic transients in order to provide scientific basis for this type power station design.

鉴于跨流域引水水电站引水发电系统所具有的特殊性和引水发电系统非恒定流水力现象的复杂性,有必要对其进行水力过渡过程研究,为该类型电站设计提供科学依据。

For the sake of the research about hydroelectric interfere among machines, the article utilized the SIMULINK in MATLAB as simulating tool,meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank ...

在这种情况下,当其中一台机组由于某种原因处于大波动过渡过程,则其在电站上下游引、尾水系统中引起的压力变化必然会影响与其共用调压井和压力主管的其它机组,使其它机组也处于过渡过程,形成一种水力干扰。

Guangxi Yantan turbine diameter 8m 90s in the 20th century in operation, mainly due to the hydraulic design and manufacturing quality Runner and other reasons, put into operation a serious vibration, cracks, vibration tube into the door crack, power generation Floor Vibration machine layer. 10 years of annual repair cracks, cavitation, multiple blade line has been restored can not be guaranteed, for the more radical change in this situation, has on one desktop PC upgrades, replacement of the old wheel, replaced by a Taiwan new designs, new technology a new wheel, troubled years of generating station floor floor vibration problems are basically solved.

广西岩滩水电站直径达8m的水轮机在20世纪90年代投入运行,主要是由于水力设计和分瓣转轮制造质量等原因,投入运行后振动严重,裂纹产生,尾水管进入门振裂,发电机层楼板振动。10年来年年修补裂纹、空蚀、多次修复后叶片型线已无法保证,为较彻底的改变这种状况,已对其中一台机进行升级改造,更换了老转轮,代之以一台新设计、采用新工艺的新转轮,困扰电站多年的发电机层楼板振动问题得到基本解决。

Main production: diesel generating set, gasoline generating set, power stage of trail car, low noise generating set and automatic generating set, long range intelligence supervision system various model motors, sand wheel machine, water pump, the STC ?

主要生产:柴油发电机组,汽油发电机组,移动电站、低噪音机组、自动化机组、远程智能监控系统各种型号电动机,沙轮机,水泵,STC 、ST 、FKX-H 系列相复励、FTW-H 无刷系列发电机单机

This series of instruments for low-voltage, medium voltage, high-voltage switchgear and distribution systems, central station monitoring system, generator set systems, building automation systems, energy management system, such as factories, able to measure three-phase three-wire, three-phase four-wire system current, voltage, active power, reactive power, apparent power, active power, reactive power, power factor, frequency, voltage triangular openings, the largest open-shaped voltage power parameters, at the same time with a remote, remote control function.

该系列 仪表适用于低压、中压、高压开关和配电系统、中心电站监测系统、发电机组系统、楼宇自控系统、工厂能量管理系统等,能够测三相三线,三相四线系统的电流、电压、有功功率、无功功率、视在功率、有功电能、无功电能、功率因数、频率、开口三角形电压、最大开口形电压等电力参数,同时带有遥信、遥控功能。

Based on a thorough investigation of the engineering geological condition for the reservoir region of the Huizhou Pumped Storage Power Station, the in-situ trial pit water injection test, boring water injection test, and water pressure test were performed to study the permeability of rock and soil mass.

摘要在对惠州抽水蓄能电站库区工程地质条件进行详细调查的基础上,采用现场试坑注水和钻孔注水、压水试验等方法了解岩土体的透水性。

Calculations are carried out for the governing stability-limit curves concerning four hydroelectric plants, with and without a surge tank.

本文对四个水电站的调节稳定曲线进行了计算,考虑了水轮机特性和调压井断面积的影响,以及电站的各种布置。

As an example, the method was used to determine the boundary condition during transient calculation for a power station equipped with two Francis turbines and a surge tank.

将求得的结果用于我国某电站机组甩负荷过渡过程的计算,得出了变童随时问的变化规律,计算结果与实际情况相符合。

The ascertainment of surges in surge tank and waterhammer pressure in pipe systems is the key point of the design of surge tanks and the safe function of the water power station.

调压室中的水位波动以及压力管道水击压强的确定对调压系统的正确设计和确保电站调压系统的正常运行至关重要。

第47/51页 首页 < ... 43 44 45 46 47 48 49 50 51 > 尾页
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。