电气化的
- 与 电气化的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Indeed, most great cities of the united states achieved such status only by incorporating the communities along their borders.with the acceleration of industrial growth came acute urban crowding and accompanying social stress -- conditions that began to approach disastrous proportions when, in 1888, the first commercially successful electric traction line was developed.
今天很多美国的大城市其实就是靠吞并它们附近的边缘地区而变成大都会的。随着工业化的加速发展,城市里出现了严重拥挤和相伴而来的社会压力。当1888 年第一条商业上成功的电气化铁轨被制造出来时,压力开始接近危机的程度。
-
I'm with u,without ui'm with u,without udon't love me,don't leave medon't love me,don't leave medon't trust me,believe medon't trust me,believe merelease me,release me...release me,release me...i love u,then lose uso distance,so near me
最后一张是来自利物浦的电子乐队Ladytron的最新专辑Witching Hour,依旧是复古的电气化乐风,也许你会说这样的音乐太工业,没人情味,但你若是抛开生活中那些所谓的人情世故,好好投入到这样的音乐中,你会发现没有什么声音比这更单纯更人性化了。
-
With the development of rail transit in modern cities and the construction of OCS in the tunnel with low headroom ,rigid catenary system are used in broad, now parameters inspection and evaluation about it have become a new hot focus in exploitation and study of catenary parameters inspection system.
随着城市轨道交通的发展和电气化改造中低净空隧道接触网的架设,刚性接触网得到愈来愈广泛的运用,对其参数的检测与评价是接触网参数检测系统开发和研究中的一个新热点。
-
With the development of rail transit in modern cities and the construction of OCS in the tunnel with low headroom ,rigid catenary system are used in broad, now parameters inspection and evaluation about it have become a new hot focus in exploitation and study of catenary parameters inspection system.
摘要随着城市轨道交通的发展和电气化改造中低净空隧道接触网的架设,刚性接触网得到愈来愈广泛的运用,对其参数的检测与评价是接触网参数检测系统开发和研究中的一个新热点。
-
After more than five years to practice, we Special Bridge, fortes tunnels, urban subway Anwa and conflicting, design and construction of integrated technologies, and rail switch, structural steelwork, OK-mechanical manufacturing technology to maintain a leading domestic level, online, bridges, tunnel, electrification, and other professional key technologies to reach or approach the advanced world level, in high-rise buildings, high-grade highways, high-grade renovation, and new breakthroughs have been made in the field of high-speed railway technology, a person I have no, I have good people, people who I turn, and constantly develop innovative mechanisms, and markedly increase the core competitiveness of enterprises.
经过五年多来的实践,我们在特大桥、特长隧道、城市地铁暗挖和盾构等设计与施工综合技术,以及道岔、钢结构、轨行机械制造等方面的技术保持了国内领先水平,在线、桥、隧、电气化等专业关键技术上达到或接近了世界先进水平,在高层建筑、高等级公路、高档装修、高速铁路等技术领域取得新突破,形成了人无我有、人有我优、人优我转、不断创新的发展机制,明显提高了企业的核心竞争力。
-
It is about a new railway crane for special purpose. With the ability of hoisting, walking and tawing, the crane can be used in the work of seting up pole and tower for railway electrification , and also, it can be owned by enterprises of factories and mines.
由此说明16t铁路专用起重机是一款新型铁路专用起重机:它的实用性能好并具有一定的行走能力,有一定的牵引能力,主要适用于铁路电气化线路电杆、铁塔的架设与施工作业的维护,同时也适用于厂矿企业自备用车。
-
Two kinds of new on-line monitoring methods, which are based on measuring primary, secondary currents and voltages to calculate the short-circuit reactances of windings for detecting the deformation windings of power transformer, are proposed in the paper. The methods used for on-line measuring the short-circuit reactances of traction transformer in electric railways, are designed.
本文提出了两种在线监测变压器绕组变形的方法,通过在线监测变压器绕组原、次边的电压和电流量,实时计算变压器绕组的短路电抗来判断变压器绕组变形情况,并对电气化铁路主要接线型式的牵引变压器绕组变形的在线监测方案进行了设计。
-
In the near future, the Yangtze River Delta inter-city passenger line will be electrified with the existing, modified speed line together, constitute a major city in the region covered by the multi-function, multi-level, inter-city rapid-transit passenger Net, so as to the formation of Shanghai, Nanjing, Hangzhou as the center of the "1-2 hour traffic circle", radiation and medium-sized cities in the Yangtze River Delta to promote the integration of the city.
在不久的将来,长三角地区城际客运专线将与既有电气化、提速改造线路一起,构成覆盖区域内主要城市的多功能、多层次、公交化城际快速客运网,形成以上海、南京、杭州为中心的&1-2小时交通圈&,辐射长三角大中城市,推动城市间的融合。
-
Other programs not directed specifically at agriculture included rural electrification and the Tennessee Valley Authority, which attempted to bring modern industrial development to rural areas through more traditional infrastructure development and a new strategy of comprehensive regional planning.
其它的非针对农业的计划包括农业电气化和田纳西流域管理局,试图通过更加传统的基础设施发展和新的全面区域政策,来实现农业地区的工业化发展。
-
Due to the impact of the East Asian currency crisis in 1997 on the Korean economy, the initial plan to simultaneously open an all-new Seoul–Busan line was modified and the key features of the first-phase section were electrification, the opening of a new line from Seoul to Daegu, use of the existing line from Daegu to Busan, and the start of train services to Iksan, Gwangju, and Mokpo Stations to spread the KTX effects to the southwest Korean peninsula.
由于东亚货币危机的影响,1997年韩国经济,初步计划同时打开一个全新的汉城,釜山线修改,第一阶段的主要特点是条电气化,一个开放从汉城到大邱新线,从大邱到釜山现有生产线的使用,以及列车服务开始益山,光州,木浦站的高速铁路的影响传播到朝鲜半岛西南部。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力