英语人>网络例句>电压 相关的搜索结果
网络例句

电压

与 电压 相关的网络例句 [注:此内容来源于网络,仅供参考]

Computation of the kilowatt-hour meter,"WF" series of electric saver can improve the scale of the inblanced voltage or current efficiently, and brings considerable electric saving effect.

线路中的三相不平衡电压和电流会造成电度表的过度计量,WF系列节电器可有效改善不平衡电压电流的程度,带来可观的节电效果。

Triphase inbalance voltage and electric current of the circuit will cause over computation of the kilowatt-hour meter,"WF" series of electric saver can improve the scale of the inblanced voltage or current efficiently, and brings considerable electric saving effect.

线路中的三相不平衡电压和电流会造成电度表的过度计量,WF系列节电器可有效改善不平衡电压电流的程度,带来可观的节电效果。

Example: A transformer is rated at 24 KVA and has a computed nominal full load voltage of 240 volts.

例如,一个变压器的额定电压为24KVA,计算的额定满负电压为240伏。

L Adjustment and correction function of voltage and current value: total battery voltage and current of main adjustment.

l 电压、电流显示值的校准修正功能:主要校准电池组总电压、电流。

L Automatic stop function: Protection voltage, charge capacity and charge time of battery can be set.

l 自动停机功能:可设定电池组保护电压、充电容量、充电时长等参数,在下列条件任意一条满足时自动停止充电:电压到、容量到、时间到。

For the single objective optimization, the decomposition and coordination method is adopted to build the decomposition and coordination model according to the existing sub-area division conditions of power networks. Then using the Augmented Lagrange method, the minimization problem of decomposition and coordination model can be changed to the saddle point problem of augmented Lagrangian function. Finally, the so called auxiliary problem principle is selected to decompose variables as well as the functions. This transforms the voltage and reactive optimization problem of the wholenetworks to some sub-problems in some sub-areas.

对于单目标无功电压优化,根据实际电网分区情况,采用分解协调法复制各分区的边界节点,建立分解协调模型,采用增广拉格朗日法将求分解协调模型的极小值问题转化为求增广拉格朗日函数的鞍点问题,然后采用辅助问题原理分解变量和增广拉格朗日函数,从而将全网无功电压优化问题分解为多个分区的分布式并行优化问题。

The data were analyzed by using D-optimization method. Results show that lead styphnate, nickel hydrazine azide and BIPb3O4 are ignited by the SCB heat; lead picrate, lead azide, nickel hydrazine nitrate and barium styphnate are ignited by the SCB plasma.

通过研究示波器采集半导体桥引爆起爆药时的信号,获取了半导体桥释放能量、电压-时间曲线中二次峰持续时间、光信号出现时间以及电压断开时间等数据,并利用D最优化法程序对数据进行了处理。

The data were analyzed by using D-optimization method. Results show that lead styphnate,nickel hydrazine azide and B/Pb3O4 are ignited by the SCB heat; lead picrate,lead azide,nickel hydrazine nitrate and barium styphnate are ignited by the SCB plasma.

通过研究示波器采集半导体桥引爆起爆药时的信号,获取了半导体桥释放能量、电压-时间曲线中二次峰持续时间、光信号出现时间以及电压断开时间等数据,并利用D最优化法程序对数据进行了处理。

The post-contingency load dynamic restoration is one of the direct reasons leading to mid-long term voltage instability or voltage collapse.

负荷在故障后的动态恢复特性是中长期电压失稳或电压崩溃的直接原因。

To reduce the arrester switching and lightning protection level as well as spare parts for the arrester , this paper suggests the 600 kV rated voltage of the line side arrester be selected.

提出了线路侧避雷器的额定电压选为600kV,以降低线路侧操作和雷电过电压的保护水平,减少避雷器备品和备件的建议。

第49/100页 首页 < ... 45 46 47 48 49 50 51 52 53 ... > 尾页
推荐网络例句

What would he tell Judith and the children?

他将怎样告诉朱迪丝和孩子们呢?

I this is at that time, the opinion with peacockish true girl is full of in a heart.

这就是当时的我,一个心中布满虚荣的女孩子真实的想法。

Oh, and I bought myself a new laptop," he said."

哦,我还给我自己买了一个新笔记本"他说。"