电厂
- 与 电厂 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The report also found that smokestack scrubbers and other equipment, which accounted for upwards of one-third of total plant expenses to operate, were idled to save costs.
报告同时还发现,为了节约成本,烟囱净化器及其它设备处于闲置状态。而这些设备的价值超过电厂运营总支出的三分之一。
-
This power plant is situated near Smolensk city.
这个电厂位于斯摩棱斯克市附近。
-
The construction of the Beijing Urban and Rural Trade Center, China Architectural Culture Center, the Ministry of National Grid Control Centre, Beijing Zaojun Miao telecommunications building, Fu Kai building, the National Computer Network Center, the Central Party School, residential buildings, Wanliu Everbright Garden, and Snow Road Plant, Shanghai Senmao Building, the building Huaneng Shanghai, Shenzhen SEG Plaza, Lushan buildings, and Wang buildings, Huaneng Shantou Power Plant, Tangshan Phoenix Building, Shijiazhuang Zhongshan Building, Hainan Petrochemical building, the Daya Bay Nuclear Power Station in Guangdong, Xiamen International Airport and other major projects.
承建了北京城乡贸易中心、中国建筑文化中心、电力部国家电网控制中心、北京市皂君庙电讯大楼、富凯大厦、国家计算机网络中心、中央党校住宅楼、万柳光大花园、和路雪厂房、上海森茂大厦、上海华能联合大厦、深圳赛格广场、庐山大厦、地王大厦、汕头华能电厂、唐山凤凰大厦、石家庄中山大厦、海南石化大厦、广东大亚湾核电站、厦门国际机场等大型工程。
-
A soft sensor of coal load measuring based on chaos optimal BP neural network is constructed in DPU.
利用混沌运动初值敏感性,能在一定范围内按其自身规律不重复的遍历所有状态获取全局最优值的特点,在电厂现有的DPU中编程实现基于混沌优化BP网络的中速磨存煤量软仪表。
-
With the main protection designs of six hydro-generators in Baise, Letan, Fengtan, Wawushan, Pengshui and Laxiwa power stations as example, the design process of hydro-generators with odd branches can be reduced to the main protection design of hydro-generators with three branches per phase and the usage of incomplete split-phase transverse differential protection is becoming significant.
0引言随着三峡、龙滩、拉西瓦等工程的相继建设,国内的水电建设已进入又一个发展高潮,水电机组正向着大型和超大型方向发展[1];大型水轮发电机主保护配置方案的定量化设计已逐步被电厂和设计院所接受,从而为大型发电机组的安全运行提供了高质量的保证[2-6]。
-
In this way, the market will not stagnate, but will always have the correct number at the
这样的话,市场不会有波动,而总会在第三阶段有正确数量的电厂卡。
-
Expert fuzzy controller and its applications in boiler steam temperature control system are discussed.
讨论了专家模糊控制器及其在电厂锅炉过热汽温控制中的应用。
-
The optimal operation and safety operation of steam turbine have been the most focused.
汽轮机的安全运行和优化运行一直以来都是电厂最为关注的问题。
-
The High-voltage bus grooves of GFM-2 series are mainly suited for electric link between the transformer and high-voltage distributor,Powersupply system of large factory or large mine,large transformer substation,power plant of large enterpraise providing power for themselves,electric link between the generator and step-up transformer.
GFM-2系列高压母线槽主要适用于变压器至高压配电盘之间的电气连接、大型厂矿的供电系统、大型变电站、大型企业的自备电厂中,发电机至升压变压器之间的电气连接。
-
By the discussion of fact in power plant, the article fixes on the main scheme of AVC sub-station system for power plant side.
基于三级分层控制结构的思想着重研究了其二级电压控制部分的电厂侧AVC子站系统。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。