点过程
- 与 点过程 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The whole process is discontinous and can be imagined as finding grid points on a specified region of X-Y plane (Think of marking all interger interception points on a paper). Convert each grid point's X and Y coordinate to expontntial values (like 2^x, 2^y) then we can use them as value of cost and gamme for cross validation.
这个过程是不连续的成长,所以可以想成我们在一个 X-Y 平面上指定的范围内找一群格子点(grid,如果你不太明白,想成方格纸或我们把平面上所有整数交点都打个点,就是那样),每个格子点的 X 跟 Y 经过换算(如 2^x, 2^y)就拿去当 cost 跟 gamma 的值来 cross validation。
-
The main contributions of this paper include,(1) introduces the backtracking mechanism into traditional GEP methods and proposing a new algorithm named GEP with backtracking strategy.(2) Proposes the concept of Backtracking Checkpoint and designing Geometric Proportion Increased Checkpoint Sequence and Accelerated Increased Checkpoint Sequence to restrict the backtracking process.(3) Extends the GEPBS algorithm by introducing a Retrogression Factor to control the percentage of backtracking.(4) Proves the effectiveness of the new algorithm by two extensive experiments, which show that new method increases the max fitness by 49.2
本文的主要工作包括:(1)在传统GEP算法中引入回溯机制,提出基于回溯策略的GEP算法(GEP with backtracking strategy ,GEPBS);(2)提出回溯检查点概念,设计了等比递增检查点序列和加速递增检查点序列用于约束回溯过程;(3)扩充基于回溯的GEP算法,设计了退化因子,提出了按比例回溯策略(GEP with proportional backtracking strategy, GEPPBS)(4)通过两个实验验证了新算法的有效性,在相同条件下较传统算法的适应度最大提高了49.2%,成功率最高提高了4倍
-
The result revealed that the magnetic field could strongly affect the ions in the electrolyte by the magnetohydrodynamics phenomena.
磁场通过洛仑兹力产生磁流体动力学效应,显著地增加了纯Mg的点蚀敏感性:对于点蚀的产生过程,磁场的存在改变了纯镁的点蚀产生机制。
-
On a multipoint connection or pointtopoint connection, the process of requesting one or more data stations to receive data.
在多点连接或点对点的连接中,请求一个或多个数据站去接收数据的过程或处理方法。
-
The synthetic punitive function combining internal point and outer point, and Powell optimal techniques are used in the control system to find the optimal point of the objective function among the real conditions. The AOCPF package has run for about one week in the semiselective flotation circuit of this plant.
为了在约束条件规定的现实范围内找到目标函数的最佳点,作者将内点法与外点法相结合的混合罚函数法、Powell优化方法引入了浮选过程的自适应优化控制。
-
An S-shape acceleration/deceleration control model is developed by summation progression and the corner of two conjoint lines is adopted as a parametric variable to control the feedrate through the inflexion of two lines. Based on these, interpolation process is divided into two steps: interpolation pretreatment and interpolation point calculation. Feedrate planning is accomplished in the pretreatment step. Interpolation point calculating only depends on the real-time feedrate and the direction vector of the line.
该算法以级数求和的方法推导了S型加减速控制模型,并以小线段夹角为参变量控制拐点通过速度建立了小线段速度衔接模型,在此基础上,算法将插补过程分解为插补预处理及插补点计算两个步骤,预处理中对小线段进行速度规划并设计了线段速度的递推处理方法,插补点仅需根据当前速度及线段方向向量即可求出。
-
Applying a power of 0.5 to the input2 value of the Multiply Divide node calculates the square root of that input1 value, completing the calculation necessary to find the linear distance of any point within the sphere from the center of the sphere.
在Multiply Divide节点里赋予INPUT2数值一个幂值0.5去计算INPUT1值去平方根,完成的计算结果将得到在球上的任何点从球心到该点的线性距离。在图像上右侧上的在球上距离中心的边界点是通过执行下面计算过程来决定值的,它是1
-
Then, an optimization algorithm is used to optimize the initial projective transformation matrices by using area around each feature point, and complete the precise image mosaics.
方法的具体实现为:首先利用相位一致方法提取各图像中边缘上的角点特征,对特征角点进行初始匹配,然后利用初始匹配的角点计算变换矩阵的初始参数,再以光强度差的平方和为优化目标函数,在优化的过程中逐步获得变换矩阵的最佳参数,最后对重叠区域运用渐入渐出的方法实现了光强或颜色的自然过渡。
-
In the region upstream of vortex breakdown, the sectional streamlines emanating from the leading edge spiral inward to primary vortex and in the region downstream of the breakdown, on the other hand, the streamlines separating from the leading edge are not entrained into the vortex core in the instantaneous sense. Along the axis, the topology of the primary vortex alters several times starting from stable focus near the apex to unstable focus, and lasts back to stable focus near wake edge, the stable hmit cycle and unstable limit cycle are shown in this evolution.
发现在截面流线谱中,即使奇点的类型、数目及位置相同,奇点的连接方式也有可能不同;旋涡破裂点前,主涡由来自前缘的力线卷绕而成,主涡焦点与前缘半鞍点相连,旋涡破裂后,来自前缘的力线不再卷入主涡,主涡焦点与对称面上的鞍点相连:在流体由翼尖流向后缘的过程中,截面流线谱的拓扑结构发生了多次变化,主涡焦点相继由稳定状态转变为不稳定状态,最后又转化为稳定状态,并先后出现了稳定的极限环及不稳定极限环。
-
From a uncertain point which located outside of the figure to draw radial, according to the junction of radial and polygon to judge the internal and outside relationship; Boundary algebra filling, a vector convert to raster arithmetic which based on integral thought, suit for polygon vector convert which
录拓扑关系的多边形矢量数据转换,方法是由多边形边界上某点开始,顺时针搜索边界线,上行时边界左侧具有相同行坐标的栅格减去某值,下行时边界左侧所有栅格点加上该值,边界搜索完毕之后即完成多边形的转换。关系,并表示成矢量格式边界线的过程。步骤包括:多边形边界提取,即使用高通滤波将栅格图像二值化;边界线追踪,即对每个弧段由一个节点向另一个节点搜索;拓扑关系生成和去处多余点及曲线圆滑。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力