英语人>网络例句>灌浆 相关的搜索结果
网络例句

灌浆

与 灌浆 相关的网络例句 [注:此内容来源于网络,仅供参考]

During treatment of soft soil subgrade located in large regional fault zone, model of floating bridge above water is adopted. Based on characteristics of subgrade soil with large porosity and loose, consolidation grouting method is used to raise load capacity of subgrade which can combine underground reinforced concrete raft foundation with steel pipe friction micropile to improve integrity strength of special heavy traffic soil subgrade.

摘要] 阐述在区域性大型断层带的软基处理中运用"水上浮桥"的建模思维方式,根据路基岩土体孔隙率大、松散的特点,采用固结灌浆从挖掘岩土体本身的潜力提高地基承载力,固结灌浆岩土体使准连续配筋混凝土地下筏板基础与摩擦型钢管微桩有机结合,以此提高运煤特重交通路基的整体强度。

Finally, selecting group classification data of fracture rock and gritstone stratum in the real grouting project, a part of them was used to train set of SVM, and others were used to check the classification effect.

最后,选取大理岩石和砂质板岩地层的部分灌浆实验数据样本建立灌浆地层的分类模型,用其他未训练的同分布的新数据进行地层识别验证。

Incorrectly grouting with epoxy: this could cause a real problem with your grout not setting up properly.

环氧灌浆错误:这可能导致真正的问题不是你的设置灌浆

The approaches used for seepage prevention of earth dam usually include concrete anti-seepage wall, high-pressure gunite grouting, split grouting, anti-seepage wall of flush-grab sleeve wells and geomembrane.

病险土坝坝体防渗加固处理,通常可选用混凝土防渗墙、高压喷射灌浆、劈裂灌浆、冲抓套井防渗墙、土工膜防渗等措施。

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

Analysis for groution effect and dam observation results show that grouting effect and imperviousness of curtain are satisfactory.

灌浆成果资料和大坝观测成果资料分析,灌浆处理的效果是好的,帷幕的防渗能力是稳定的。

The results showed that the general combining abilityand specific comb ining abilityvariations were significant,and the inheritance of grain filling traits were controlled by additive and nonadditive effects.

结果表明,籽粒灌浆性状的GCA和SCA均方达显著水平,说明籽粒灌浆性状的遗传受基因加性效应和非加性效应共同作用。

In order to research the mechanical properties and deformability of pisolite grouting material, based on the earlier study, size effect, strength translation, different age strength and stress-strain curve of PGM were studied.

为深入研究豆石型灌浆料的力学性能和变形性能,在前期试验研究的基础上,对豆石型灌浆料的尺寸效应、强度转化、不同龄期强度以及应力应变曲线进行了试验研究。

The results showed that the workability of PGM with 13% water content was better, the mechanics indexeal of PGM decreased with the increment of water, and increased with the enhancement of pisolite when the amount of water less than 14% and pisolite less than 35%, moreover, tensile strength of PGM was approximately 40% higher than that of ordinary concrete.

研究表明,对于所研究的豆石型灌浆料,其在13%加水量下具有较好的工作性能;其力学指标随加水量的增大而降低;当加水量小于14%,豆石含量小于35%时,力学指标随豆石掺量的增大而提高。此外,研究还发现,豆石型灌浆料的抗拉强度要比同等级的普通混凝土高40%左右。

By using Duncan-Chang E-B model, the grouting period-stopping period of a earth rock dam, and the finite element analysis of stress and strain. Split-grouting can increase the maximum and minor principal stresses at the same time.

采用Duncan-Chang非线性模型,模拟了某土石坝劈裂灌浆灌浆-停灌施工过程,进行了应力、应变、稳定有限元分析。

第3/25页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?