潮
- 与 潮 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The spectrum analysis was applied to analyze the fluctu- ation of flocs diameter during the spring tide and the neap tide.
分析表明,长江口徐六泾处细颗粒泥沙絮凝体粒径存在着明显的变化周期:大潮表层存在7.86h,3.93h和2.95h的变化周期;小潮表层存在8.38h和3.14h的变化周期;大潮底层存在3.33h和1.19h的变化周期。
-
Observation of suspended sediment concentration over spring and neap tide was carried out using an optical backscatter sensor from 6 to 12 June, 2005 in Changjiang estuary.
利用光学后向散射浊度计OBS-3A,在长江河口南槽进行大小潮周期连续观测。
-
The temporal change in floes size of fine suspended sediments was measured in Xuliujin of the Changjiang Estuary in June of 2003, by using an in situ laser diffraction particle sizer, the laser in situ scattering and transmissomerty-100(LISST-100). The spectrum analysis was applied to analyze the fluctuation of floes diameter during the spring tide and the neap tide.
2003年6月利用现场激光粒度仪(LISST-100)在不扰动的情况下,获取了长江口徐六泾处悬浮细颗粒泥沙絮凝体的现场粒径系列资料,应用谱分析方法研究了絮凝体粒径在大小潮、表底层的变化规律。
-
According to the environmental conditions of the Rizhao Harbor 300, 000-ton crude oil handling terminal engineering sea area, the advanced instruments were used to measure the tidal levels at 2 stations during spring tide, medium tide, neap tide, the current speeds, current directions and sediment concentrations along 9 survey lines in the engineering sea area.
根据日照港30万吨级原油码头工程的设计要求,在拟建工程海城实测了2个站的大、中、小潮潮位和9条测线的流速、流向及含沙量。
-
The results showed that the quasi-period of floes diameter in the surface water during the spring tide included 7.86 h, 3.93h and 2.95h; those in the same water during the neap tide included 8.38h and 3.14h; those in the bottom water during the spring tide included 3.33h and 1.19h.
分析表明,长江口徐六泾处细颗粒泥沙絮凝体粒径存在着明显的变化周期:大潮表层存在7.86h, 3.93h和2.95h的变化周期;小潮表层存在8.38h和3.14h的变化周期;大潮底层存在3.33h和1.19h的变化周期。
-
The observation showes that average VC, D,Δp and ω at the surface water during spring tide are 98.0μl/L, 39.8μm, 1173 kg/m^3 and 1.14 mm/s, whereas those during neap tide are 70.8 μl/L, 64.4μm, 919 kg/m^3 and 2.32 mm/s, respectively.
观测结果显示,徐六泾大、小潮表层絮凝体体积浓度、粒径、有效密度和静水沉速的平均值分别为98.0μl/L、39.8μm、1173kg/平方公尺、1.14mm/s和70.8μl/L、64.4μm、919kg/平方公尺,2.32mm/s。
-
Blocked by the scheduled project, the tidal current near the coast will move around the project. 4. Changes of SSC before and after the project The general characteristics of the SSC both before and after the scheduled project are as the following: the SSC is lower in the waters of the project ranging from 11 mg/L to 19 mg/L; the SSC isolines are generally parallel to the isobaths, decreasing towards the coast; the SSC in flood tide is higher than that in ebb tide, so are high tide and spring tide than low tide and neap tide, respectively.
4工程前后悬沙量变化工程前后悬沙分布的基本规律:在工程海域,悬沙量均保持为较低值,大致为11~19mg/L;悬沙等值线基本平行于等深线,随深度的减小浓度减小,一般到近岸区达到最低;悬沙量的日周期性变化规律明显,悬沙量涨潮时大于落潮时,高潮时大于低潮时,大潮时大于小潮时。
-
Mean neap peak cycle is the lowest point in velocity that a tidal area experiences in a month .
卑鄙小潮峰顶周期是在速度的最低的点那个一个潮汐区域经验在一个月。
-
These are called neap tides.
这些被称为大小潮。
-
It seems that the United States is experiencing another "baby boom" or at least a "neap high birthrate".
HW看来美国正处于另一个"婴儿潮"或至少处于一个"生育小高潮"。
- 推荐网络例句
-
And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.
同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。
-
Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.
运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。
-
If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.
如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。