英语人>网络例句>淤泥的 相关的搜索结果
网络例句

淤泥的

与 淤泥的 相关的网络例句 [注:此内容来源于网络,仅供参考]

During recent years practice has changed for ecological reasons and much spoil is now dump ed in special disposal areas offshore, on dry land or in marshes after these areas have been dyked in.

这种方法经常用于所有的河段:近年来,由于生态的原因,这种方法已有所改变,淤泥已经顺倾人海中或陆地上特定的处理场地,或者已围堤的沼泽。

During recent years practice has changed for ecological reasons and much spoil is now dumped in special disposal areas offshore, on dry land or in marsh es after these areas have been dyked in.

这种方法经常用于所有的河段:近年来,由于生态的原因,这种方法已有所改变,淤泥已经顺倾人海中或陆地上特定的处理场地,或者已围堤的沼泽。

During recent years practice has changed for ecological reasons and much spoil is now dumped in special disposal areas offshore, on dry land or in marshes after these areas have been dyked in.

这种方法经常用于所有的河段:近年来,由于生态的原因,这种方法已有所改变,淤泥已经顺倾人海中或陆地上特定的处理场地,或者已围堤的沼泽。

Drier, hotter desert climates will be complemented by wetter, stormier mountain weather systems that will send floods roaring downstream, overwhelming dams, spreading over their former alluvial plains, and entombing whatever was built there in annual layers of silt.

干躁和炎热的沙漠气候和潮湿、多雨的山地气候交织在一起,滔滔洪水涌到下游,淹没了水库,一年一年堆积起来的淤泥覆盖了之前的冲击平原,埋葬了建造在那里的一切。

According to the heavy metal content ,the quality of the flocculated samples and the water samples after flocculation was evaluated by National Standard. The results showed that the heavy metal pollution was most serious in Spring s sullages , then was in Summer 、 Autumn、 Winter in sequence;the water quality in Lianyungang、 Xiexinggang was best in Summer, then Winter、 Autumn and Spring in sequence, there was little difference of water quality in Ancient Canal、 Hengcaolugang and Hongze Lake .

对絮凝前后泥样和水样中的重金属分别根据国标进行了评价,不同的季节,污染最严重的是春季淤泥,然后依次为夏季、秋季、冬季;连云港、协兴港地区的水质在夏季最好,其次为冬季、秋季、春季;古运河、横草路港、梅梁湾、洪泽湖水质的季节性变化并不大。

Deep-sea fishing generally takes place off the Abaco cays, where the drop-off from the reef to the Atlantic is steep, and the shallow marshy flats to the west of Great Abaco are ideal for bonefishermen.

人们进行深海捕鱼,通常需要到离阿巴克湾较远的海上去,将渔具从礁石上抛落到大西洋深处。大阿巴克岛西部的海底有着多处峭壁和浅浅的湿软的淤泥适于鱼类栖居,是捕鱼的最理想之地。

Hi-nutrient sludge from both the fish farm and the pharmaceutical factory's fermentation vats are used to fertilize local farms, and perhaps someday soon, also horticulture greenhouses warmed by the power plant's waste heat.

来自渔场的营养丰富的淤泥和来自药厂的发酵料用来给本地农场作肥料。或许不久会有一天,园艺温室也由发电厂的废热来加温。

Service project 1, pipe clean-up: 22,819,364 (1) cleaning of septic tanks, oil-water separator tanks, sewage treatment and cleaning of pool building water tanks, cisterns, swimming pools (2) cleaning because of animal and plant oils, viscous materials such as manure, sludge and litter caused by blockage of the inflow of municipal pipelines II dredge pipeline:(1) municipal pipelines: available in large-scale machinery, a variety of director dredge Road, municipal sewer pipes and other large-scale (2) industrial pipe: Factory, Sheung Shui, pipelines, water pipelines, ship pipeline dredging, cleaning, repair services (3) bath basin: to clear the various models of bath, basin, vegetables pool, including the V-bends and S-type bends all kinds of pipe (4) toilet: dredge a result of rags, towels, cleaning ball, etc. burst into a variety of soft and hard goods caused by plugging the toilet (5) to leak: dredge a result of cement, sand, hair, cloth and other debris into the floor drain caused by the plug (6) Zun pit: pit long service life inside alkaline urine thickening, under the water, small, slow flow easily plug three.

服务项目一、管道清理:22819364(1)清理化粪池、油水分离池、污水处理池及清洗大楼水箱、蓄水池、游泳池(2)清洗因动植物油脂、粪便等粘稠物、淤泥和垃圾流入造成堵塞的市政管道二、管道疏通:(1)市政管道:备有大型机械,疏通各种主管道、市政管道及其他大型下水道(2)工业管道:工厂上水管道、下水管道、船舶管道的疏通、清洗、维修服务(3)浴缸面盆:疏通各种型号浴缸、面盆、菜池,包括V型弯和S型弯各种管道(4)马桶:疏通因抹布、毛巾、清洁球等各种软硬物品冲进马桶所造成的堵塞(5)地漏:疏通因水泥、沙子、头发、抹布等各种杂物掉入地漏所造成的堵塞(6)墫坑:蹲坑使用年限久了,里面尿碱变厚,下水量小、流速慢,极易堵塞三。

Through the construction of long-large piles groups, improved the technology of bridge bored pile construction in complicated geological conditions, such as si It layers and impact on tide change, especially application of the construction machine.

3通过长大群桩的施工,及合理机械配套选型的应用,进一步完善了复杂地质条件下(淤泥层厚、潮起潮落的影响)桥梁钻孔桩基础的施工技术。

Most of the flood from the wide inner lowland plain discharges through tide locks on coast,and the influence of tidal flat inning projects on the tide lock drainage must be solved by seawall line choice.

淤泥质海岸后方大面积的低地平原主要通过海岸上建设的涵闸排水,潮滩匡围对沿海涵闸排水的影响是围垦工程必须解决的问题。

第20/22页 首页 < ... 14 15 16 17 18 19 20 21 22 > 尾页
推荐网络例句

In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.

。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。

Go down on one's knees;kneel down

屈膝跪下。。。下跪祈祷

Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.

Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。