洞室
- 与 洞室 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The key structures of underground powerhouse of Baise multipurpose dam project is accommodated in the diabase stratum, of which most sections of the headrace tunnel, delivery tunnel and other caverns most are accommodated in unfavorable stratum composed of mudstone, silicalite and carbonaceous silicalite.
百色水利枢纽工程地下厂房主体布置在辉绿岩地层当中,其中的引水系统、交通洞等洞室大部分洞段布置在由泥岩、硅质岩和含碳硅质岩等组成的不良地层下。
-
The system has the advantages of synchronous and independent highland stress loading, high loading automation degree and loading accuracy, more loading functions, the realization of the axial loading opening of a cavity, high rigidity of the loading system, good integral stability, simple and convenient operation and so on.
本发明具有同步、独立、高地应力加载,加载自动化程度和加载精度高,加载功能多,实现洞室轴向加载开洞,加载系统刚度高、整体稳定性好、操作简单方便等优点。
-
Then, the permeability tensor theory is utilized to calculate permeability tensor value of each measured chamber section in order to obtain crack medium three-dimension permeability tensor field.
针对裂隙岩体的非均质性、各向异性特点,本次毕业设计对紫坪铺水利枢纽工程地下洞室开挖后洞壁裂隙结构面进行了几何参数测量和分组,再利用渗透张量理论计算各测量洞段渗透张量值,获得裂隙介质三维渗透张量场。
-
Then the displaceable blocks distributing on the roof and sidewalls of main chamber were searched out taking the intersecting relationship of discontinuities into consideration.
基于此,本论文以黄河拉西瓦水电站地下厂房洞室群为例,从工程地质学的角度对与大型地下洞室群围岩稳定性密切相关的问题进行了较为全面的分析与评价。
-
Both the relation between classification of Q and overbreak as well as underbreak and the relation classification of RMR and overbreak as well as underbreak are researched in this paper.
4正确评价岩体的质量,进行围岩分类,对研究岩体质量与洞室超欠挖之间的关系及分析和预测洞室超欠挖具有重要的意义。
-
The new developed anti-explosion structural model test devices are used and the integral anti-explosion reinforcement effect comparative simulation tests and study are made on cavities and free type anchor cables, full length grouted one and free type anchor cables as well as the full length type and the half length type anchor cables.
采用新研制的抗爆结构模型试验装置,对毛洞与自由式锚索,全长粘结式与自由式锚索以及全长粘结式锚索与半全长粘结式锚索对洞室的整体抗爆加固效应进行了对比模拟试验研究。
-
According to the characteristics of huge underground openings and the layered rock mass, the author finds that the rock mass of side wall along the dip direction is easy to slide along bed plane and the rock mass of side wall athwart the dip direction is easy to bend. The possible geological problems of excavating underground openings in layered rock mass are analyzed, some corresponding countermeasures are also put forward.
结合巨型地下洞室群工程及陡倾角层状岩体的特点,通过分析得出陡倾角层状岩体中大型地下洞室顺倾向侧高边墙岩体易于顺层滑动、反倾向侧高边墙岩体易于倾倒弯折变形破坏的特点,并提出了围岩稳定可能面临的工程地质问题,以及可供采用的对策技术。
-
Organization of large-scale chamber blasting is described in the case of Luoguogou, It is emphatically stated that the following points should be noted during technical desing:(1)spacing of charge roons and deter- mination of blasting parameters;(2)design of initiation network;(3) construction plan;(4) safety check and safety precautions.
以罗锅沟大爆破为例,介绍了洞室大爆破的施工组织,并着重问述了在进行技术设计时,应注意以下几点:(1)药室的布置及爆破参数的确定;(2)起爆网路的设计;(3)施工设计;(4)安全校核及安全措施。
-
In order to demonstrate the design scheme of the air-cushion surge tank for a hydroelectric project,the hydraulic fracturing technology is adopted to define the in-situ stress and related rock mechanical parameters of rock mass surrounding the high pressure cavern.
:为论证某水电工程高压洞室的方案设计,采用水压致裂技术对高压洞室的原地应力及相关岩体力学参数进行细致的测试。
-
In the following, the paper lists node flux balance equation group and loop pressure balance equation group, based on law of conservation of mass and law of conservation of energy, and the relation between flux and pressure elicits, using the law of branch ventilation resistance and the relation of fan performance.
本文根据水电站地下洞室群通风系统的特点,提出了进行节点、分支划分与网络图绘制及分支阻抗计算的原则和方法,利用图论的相关理论将通风系统转化成为点和有向线段表示表示的,并且各个分支影响空气流动的因素由分支的阻抗表示的水电站地下洞室群通风网络图。
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。