英语人>网络例句>泵站 相关的搜索结果
网络例句

泵站

与 泵站 相关的网络例句 [注:此内容来源于网络,仅供参考]

Nor are the Kurds likely to take down fortifications around Dibis, where a big oil-pumping station sits on top of one of Iraq's biggest oilfields.

坐落在伊拉克最大油田上的底比斯镇中有一座很大的原油泵站,库尔德人因而也绝不可能取消底比斯镇周边的防御工事。

Huarong company sales agents from Sweden , the United States , Italy , Taiwan , the various hydraulic pump stations , widely applicable to electric forklifts , car snorkels Mei , Taiwan cargo warehouse regulation , fixed-take-off and landing platform , dump dump trucks .

华蓉公司代理销售来自瑞典,美国,意大利,台湾等地的各类液压泵站,广泛适用于电动叉车,汽车液压升降尾,仓库调节货台,固定式升降平台,自卸翻斗车。

A compact pumping station pumps the water via a two-stage filter to special nozzles where it nebulises under high pressure in aerosol mist and is mixed with air by means of turbulence elements.

紧凑型泵站把水流通过双层过滤器抽吸到特定的喷嘴处,在高压作用下形成水雾状,并以湍流原理方式与空气结合,由于这种雾化作用和深度空气混合,使得越来越多的雾化水蒸发。

The hydraulic anti-sway system consists of anti-sway drums, anti-sway steel cable, hydraulic rams, hydraulic pump station and pulley block. The system can be controlled by two different pressure hydraulic circuits and absorb load swing energy.

液压油缸式减摇系统由减摇卷筒、减摇钢丝绳、液压油缸、液压泵站和滑轮组等组成,通过2个不同压力的液压回路进行控制,从而吸收吊重摆动的能量。

The design and manufacturing specifications of a hydraulic cylinder, hydraulic pump station, hydraulic test equipment, hydraulic machinery non-standard equipment, widely used in the steel, automobile, coal, oil and other industries.

设计制造的个规格液压油缸、液压泵站、液压试验装置、液压机械非标设备,广泛用于钢铁、汽车、煤矿、石油等行业。

Designing the system schematic diagram explained the work principle of the hydraulic pressure synthesized test platform; According to the design of hydraulic pump, hydraulic valve, drill tubing choice and the computation, determined the model and the size of the hydraulic pressure part; In order to improving the consummation system, this article also carried on to test the system pressure loss and temperature increment; In addition, through the system calorific capacity computation, completed to choose the heater and the chiller ; Through designing the belt transmission and the axis structural, this article completed to the design of pumping station.

通过对系统原理图的设计,说明了液压综合试验台的工作原理;根据对液压泵、液压阀、油管等液压元件的选择和计算,确定了所需液压元件的型号及尺寸;为了改进和完善系统,本文还对系统压力损失和发热温升进行了验算;此外,通过对系统发热量计算,完成了对加热器和冷却器的选择;通过对带传动设计和轴的结构设计、校核,完成了对泵站的设计。

Designing the system schematic diagram explained the work principleof the hydraulic pressure synthesized testplatform; According to the design of hydraulic pump, hydraulicvalve, drill tubing choice and the computation, determined themodel and the size of the hydraulic pressure part; In order toimproving the consummation system, this articlealso carried on to test the system pressure loss and temperatureincrement; In addition, through the system calorific capacitycomputation, completed to choose the heater and the chiller ;Through designing the belt transmission and the axis structural,this article completed to the design of pumping station.

通过对系统原理图的设计,说明了液压综合试验台的工作原理;根据对液压泵、液压阀、油管等液压元件的选择和计算,确定了所需液压元件的型号及尺寸;为了改进和完善系统,本文还对系统压力损失和发热温升进行了验算;此外,通过对系统发热量计算,完成了对加热器和冷却器的选择;通过对带传动设计和轴的结构设计、校核,完成了对泵站的设计。

Theoretically the pump blade failure mechanism was worn on, the impact of wear failure leaves the various factors was analyzed, combined with practice pumping station operation and maintenance experience, the focus at a reasonable selection, surface heat treatment, non-metallic protective coating alloy powder spray repair welding and welding six aspects, premature wear of the pump blade technical measures and repair methods was prevented in order to enhance its effective life.

理论上阐述了水泵叶片磨损失效的机制,具体分析了影响叶片磨损失效的各种因素,并结合泵站运行实践和维修经验,重点在合理选材、表面热处理、非金属涂层防护、合金粉末喷焊和补焊等6个方面,提出了防止水泵叶片过早磨损的技术措施和修补方法,以提高其有效的使用寿命。

From aspects of the principles and components of the water-supply system ,the configuration of the water-supply system ,and the pipeline pressure detecting equipment,etc.

介绍了万家寨引黄工程SM1/SM2泵站供水系统运行方式及存在的问题,分析了产生问题的原因,提出了相应的解决办法。

In the 90′ s, 9 large-sized pumping stations have been constructed in Jiangsu, with 43 sets of equipment, a total water-pumping ability of 1017m3/ s and a total capacity of 62.5MW.

摘 要:90年代,江苏陆续兴建了9座大型泵站,共装机43台套,总抽水能力1-017-m3/s,总容量62.5MW。

第15/16页 首页 < ... 8 9 10 11 12 13 14 15 16 > 尾页
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。